{"schema_version":"1.0","source":"Bill Hero","network":"sa/sapn","network_display_name":"SA Power Networks","network_coverage":"All of South Australia","state":"SA","fuel_type":"electricity","generated_at":"2026-05-27T08:45:39.613Z","next_update":"2026-05-28T09:40:14.865Z","currency":"AUD","tax_treatment":"GST inclusive","market_coverage_percent":100,"coverage_basis":"CDR mandatory disclosure — all registered retailers are required to publish current plans under the Consumer Data Standards. New plans may have up to 3 business days lag before CDR publication is required.","data_provenance":"CDR EnergyPlanResponseV3 via Energy Made Easy gateway","data_freshness":{"generated_at":"2026-05-27T08:45:39.613Z","next_update":"2026-05-28T09:40:14.865Z","hours_since_update":0.9,"is_stale":false,"stale_threshold_hours":48},"benchmark":{"type":"DMO","full_name":"Default Market Offer 2025-26 (DMO 7)","regulator":"Australian Energy Regulator","benchmark_kwh":4000,"usage_rate_cents_per_kwh":null,"supply_charge_cents_per_day":null,"annual_cost_at_benchmark_kwh":2301,"effective_from":"2025-07-01","effective_to":"2026-06-30"},"benchmark_usage_kwh":{"low":3000,"medium":5000,"high":8000},"plans":[{"plan_id":"blue-nrg-blu1043617mbe1eme-electricity","cdr_plan_id":"BLU1043617MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Zembl Edge","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":93.62,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":27.79,"shoulder_cents_per_kwh":36.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-4:59pm sat, sun; 9pm-11:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":977.08,"at_4000_kwh":1188.87,"at_5000_kwh":1400.66,"at_8000_kwh":2036.03},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1043617mbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 BLU1043617MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due date","term":"FIXED"}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Jul – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.79},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.79}]}]},{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.79},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":36.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":45.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":27.79},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":45.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]}]},{"season":"Time of Use Tariff Period (1 Apr – 30 Jun)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.79},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.79}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":48.3},{"plan_id":"blue-nrg-blu1043408mbe1eme-electricity","cdr_plan_id":"BLU1043408MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Business Edge","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":93.62,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":27.79,"shoulder_cents_per_kwh":36.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-4:59pm sat, sun; 9pm-11:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":977.08,"at_4000_kwh":1188.87,"at_5000_kwh":1400.66,"at_8000_kwh":2036.03},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New Customers only."},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1043408mbe1eme-electricity&source=ai","last_verified":"2026-03-30","source_doc":"CDR EnergyPlanDetailV3 BLU1043408MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due date","term":"FIXED"}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Jul – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.79},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.79}]}]},{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.79},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":36.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":45.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":27.79},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":45.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]}]},{"season":"Time of Use Tariff Period (1 Apr – 30 Jun)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.79},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.79}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":48.3},{"plan_id":"blue-nrg-blu1043396mbe1eme-electricity","cdr_plan_id":"BLU1043396MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Business Edge","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":93.62,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":27.79,"shoulder_cents_per_kwh":36.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-4:59pm sat, sun; 9pm-11:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":977.08,"at_4000_kwh":1188.87,"at_5000_kwh":1400.66,"at_8000_kwh":2036.03},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New Customers only."},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1043396mbe1eme-electricity&source=ai","last_verified":"2026-03-30","source_doc":"CDR EnergyPlanDetailV3 BLU1043396MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due date","term":"FIXED"}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Jul – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.79},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.79}]}]},{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.79},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":36.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":45.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":27.79},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":45.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]}]},{"season":"Time of Use Tariff Period (1 Apr – 30 Jun)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.79},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.79}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.79}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":48.3},{"plan_id":"next-business-nex1044177mbe1eme-electricity","cdr_plan_id":"NEX1044177MBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"Next Assured Bus 15% GTD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":96.5,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":25,"shoulder_cents_per_kwh":42.71,"peak_hours":"High Season Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Low Season Off Peak: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · High Season Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun","shoulder_hours":"Low Season Off Peak: 7am-8:59pm mon, tue, wed, thu, fri · High Season Peak: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.1,"annual_cost_estimates":{"at_3000_kwh":983.49,"at_4000_kwh":1193.91,"at_5000_kwh":1404.33,"at_8000_kwh":2035.59},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1044177mbe1eme-electricity&source=ai","last_verified":"2026-03-31","source_doc":"CDR EnergyPlanDetailV3 NEX1044177MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT Premium: Single Rate Feed In Tariff","description":"FiT Premium | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"RFIT: Single Rate Feed In Tariff","description":"RFIT | All kWh/day","type":"single","rate_cents_per_kwh":0.1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":7,"hours":"5pm-7:59pm","startHour":17,"endHour":20}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":0,"hours":"10am-2:59pm","startHour":10,"endHour":15}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":0,"endHour":10},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":15,"endHour":17},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":20,"endHour":24}]}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates at any time in accordance with our terms and conditions.","onExpiryDescription":"This contract continues for as long as you choose to remain on the plan.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"CC_PROCESSING","amount":"0.0195","description":"1.95% AMEX credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0195"},{"type":"RECONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0077","description":"0.77% Visa & Mastercard credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0077"},{"type":"OTHER","amount":"77.00","description":"COMMS3 Meter Charge","term":"FIXED"},{"type":"OTHER","amount":"77.00","description":"COMMS4 Meter Charge","term":"FIXED"}],"touSchedule":[{"season":"Low Season Off Peak (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":25},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":42.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":25}]}]},{"season":"High Season Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":25},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":42.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":51},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":25},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":51},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":48.1},{"plan_id":"next-business-nex1044171mbe1eme-electricity","cdr_plan_id":"NEX1044171MBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"Next Assured Bus 15% GTD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":96.5,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":25,"shoulder_cents_per_kwh":42.71,"peak_hours":"High Season Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Low Season Off Peak: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · High Season Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun","shoulder_hours":"Low Season Off Peak: 7am-8:59pm mon, tue, wed, thu, fri · High Season Peak: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.1,"annual_cost_estimates":{"at_3000_kwh":983.49,"at_4000_kwh":1193.91,"at_5000_kwh":1404.33,"at_8000_kwh":2035.59},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1044171mbe1eme-electricity&source=ai","last_verified":"2026-03-31","source_doc":"CDR EnergyPlanDetailV3 NEX1044171MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT Premium: Single Rate Feed In Tariff","description":"FiT Premium | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"RFIT: Single Rate Feed In Tariff","description":"RFIT | All kWh/day","type":"single","rate_cents_per_kwh":0.1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":7,"hours":"5pm-7:59pm","startHour":17,"endHour":20}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":0,"hours":"10am-2:59pm","startHour":10,"endHour":15}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":0,"endHour":10},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":15,"endHour":17},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":20,"endHour":24}]}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates at any time in accordance with our terms and conditions.","onExpiryDescription":"This contract continues for as long as you choose to remain on the plan.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"CC_PROCESSING","amount":"0.0195","description":"1.95% AMEX credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0195"},{"type":"RECONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0077","description":"0.77% Visa & Mastercard credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0077"},{"type":"OTHER","amount":"77.00","description":"COMMS3 Meter Charge","term":"FIXED"},{"type":"OTHER","amount":"77.00","description":"COMMS4 Meter Charge","term":"FIXED"}],"touSchedule":[{"season":"Low Season Off Peak (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":25},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":42.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":25}]}]},{"season":"High Season Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":25},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":42.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":51},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":25},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":51},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":48.1},{"plan_id":"globird-glo1052968mre3eme-electricity","cdr_plan_id":"GLO1052968MRE3@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"WHOLESAVE Resi (Two Rate CTL) estimate-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":39.6,"off_peak_cents_per_kwh":16.64,"shoulder_cents_per_kwh":null,"peak_hours":"4pm-10:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"11pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1059.89,"at_4000_kwh":1295.17,"at_5000_kwh":1530.45,"at_8000_kwh":2236.29},"marginal_rates":{"excess_unit_cost_cents":39.6,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Additional Eligibility"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1052968mre3eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 GLO1052968MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"If you get Feed-In, you will get a feed-in tariff linked to the wholesale price subject to a 0% allowance","type":"single","rate_cents_per_kwh":0}],"terms":"Daily Supply Charge is in addition to Membership Fee.  Usage rates include fixed charges and variable ones linked to 5-min wholesale prices  (Network Losses apply). Fixed charge rates incl GST: Peak 21.56c/kWh, Off-Peak 12.1c/kWh, Controlled Load 8.69c/kWh. For additional information visit www.globirdenergy.com.au/energy-saver/wholesave","variation":"This is wholesale-linked plan, prices change every 5 minutes. Quoted annual cost is an estimate only. Usage rate uses last financial year's wholesale spot price, a representative usage of 4200 kWh,  plus any fixed usage rate.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"70.00","description":"Min disconnection fee inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"MEMBERSHIP","amount":"264.00","description":"Membership fee of $0.7213 per day equivalent to $22 per month to access wholesale price.","term":"ANNUAL"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":16,"rateCents":16.64},{"type":"PEAK","startHour":16,"endHour":23,"rateCents":39.6},{"type":"OFF_PEAK","startHour":23,"endHour":24,"rateCents":16.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":43.7},{"plan_id":"globird-glo1052967mre3eme-electricity","cdr_plan_id":"GLO1052967MRE3@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"WHOLESAVE Resi (Two Rate) estimate-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":39.6,"off_peak_cents_per_kwh":16.64,"shoulder_cents_per_kwh":null,"peak_hours":"4pm-10:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"11pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1059.89,"at_4000_kwh":1295.17,"at_5000_kwh":1530.45,"at_8000_kwh":2236.29},"marginal_rates":{"excess_unit_cost_cents":39.6,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Additional Eligibility"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1052967mre3eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 GLO1052967MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"If you get Feed-In, you will get a feed-in tariff linked to the wholesale price subject to a 0% allowance","type":"single","rate_cents_per_kwh":0}],"terms":"Daily Supply Charge is in addition to Membership Fee.  Usage rates include fixed charges and variable ones linked to 5-min wholesale prices  (Network Losses apply). Fixed charge rates incl GST: Peak 21.56c/kWh, Off-Peak 12.1c/kWh. For additional information visit www.globirdenergy.com.au/energy-saver/wholesave","variation":"This is wholesale-linked plan, prices change every 5 minutes. Quoted annual cost is an estimate only. Usage rate uses last financial year's wholesale spot price, a representative usage of 4000 kWh,  plus any fixed usage rate.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"70.00","description":"Min disconnection fee inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"MEMBERSHIP","amount":"264.00","description":"Membership fee of $0.7213 per day equivalent to $22 per month to access wholesale price.","term":"ANNUAL"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":16,"rateCents":16.64},{"type":"PEAK","startHour":16,"endHour":23,"rateCents":39.6},{"type":"OFF_PEAK","startHour":23,"endHour":24,"rateCents":16.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":43.7},{"plan_id":"amber-electric-amb1043500mre1eme-electricity","cdr_plan_id":"AMB1043500MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Battery + Solar: Variable Wholesale Prices (estimate)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":23.57,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":12.85,"annual_cost_estimates":{"at_3000_kwh":1069.14,"at_4000_kwh":1304.84,"at_5000_kwh":1540.54,"at_8000_kwh":2247.64},"marginal_rates":{"excess_unit_cost_cents":23.57,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Smart Meter Installation"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043500mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043500MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Estimated wholesale export price","description":"Feed-in price is a 12 month average estimate, based on a typical household solar (6kW) and battery (13kWh) set up in your network with an Amber SmartShift compatible battery and annual load of 8000kWh and annual exports of 2500kWh (assumes tariff RTOU). Prices are not fixed. Amber passes through wholesale electricity prices directly at cost and has a guaranteed minimum feed-in price of 0c/kWh over a financial year. See www.amber.com.au/pricing for full details.","type":"single","rate_cents_per_kwh":12.85}],"terms":"Usage price is a 12 month average estimate, based on a typical household solar (6kW) and battery (13kWh) set up in your network with an Amber SmartShift compatible battery and annual load of 8000kWh and annual exports of 2500kWh (assumes tariff RTOU). Includes Ambers monthly subscription. See www.amber.com.au/pricing for full details. Prices are not fixed. Amber passes through wholesale electricity prices directly at cost. For full terms and conditions, visit https://www.amber.com.au/terms","variation":"Usage price is a 12 month average estimate only. Actual prices are not fixed and change every 5 or 30 minutes (depending on meter compatibility). Usage is charged at the same wholesale electricity costs that are charged to us. Prices are determined by a range of factors, including government rebates, network fees and wholesale market costs. You are protected by the Amber Bill Guarantee Rates available here https://www.amber.com.au/factsheets/factsheets","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":43.3},{"plan_id":"blue-nrg-blu1033548mbe1eme-electricity","cdr_plan_id":"BLU1033548MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Diamond 2026","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":64.62,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":33.47,"shoulder_cents_per_kwh":51.11,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-4:59pm sat, sun; 9pm-11:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1044.57,"at_4000_kwh":1314.14,"at_5000_kwh":1583.71,"at_8000_kwh":2392.42},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"No Restrictions"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1033548mbe1eme-electricity&source=ai","last_verified":"2026-01-28","source_doc":"CDR EnergyPlanDetailV3 BLU1033548MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due dat","term":"FIXED"}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Jul – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.47},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":51.11},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.47}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.47}]}]},{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.47},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":51.11},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.57},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.47}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":33.47},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.57},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.47}]}]},{"season":"Time of Use Tariff Period (1 Apr – 30 Jun)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.47},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":51.11},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.47}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.47}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":42.9},{"plan_id":"blue-nrg-blu1033549mbe1eme-electricity","cdr_plan_id":"BLU1033549MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Diamond 2026","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":64.62,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":33.47,"shoulder_cents_per_kwh":51.11,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-4:59pm sat, sun; 9pm-11:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1044.57,"at_4000_kwh":1314.14,"at_5000_kwh":1583.71,"at_8000_kwh":2392.42},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"No Restrictions"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1033549mbe1eme-electricity&source=ai","last_verified":"2026-01-28","source_doc":"CDR EnergyPlanDetailV3 BLU1033549MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due dat","term":"FIXED"}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Jul – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.47},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":51.11},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.47}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.47}]}]},{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.47},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":51.11},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.57},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.47}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":33.47},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.57},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.47}]}]},{"season":"Time of Use Tariff Period (1 Apr – 30 Jun)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.47},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":51.11},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.47}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.47}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":42.9},{"plan_id":"globird-glo1052978mre3eme-electricity","cdr_plan_id":"GLO1052978MRE3@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"WHOLESAVE Resi (Single Rate CTL) estimate-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":25.19,"supply_charge_cents_per_day":84},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1062.3,"at_4000_kwh":1314.2,"at_5000_kwh":1566.1,"at_8000_kwh":2321.8},"marginal_rates":{"excess_unit_cost_cents":25.19,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Additional Eligibility"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1052978mre3eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 GLO1052978MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"If you get Feed-In, you will get a feed-in tariff linked to the wholesale price subject to a 0% allowance","type":"single","rate_cents_per_kwh":0}],"terms":"Daily Supply Charge is in addition to Membership Fee.  Usage rates include fixed charges and variable ones linked to 5-min wholesale prices  (Network Losses apply). Fixed charge rates incl GST: Peak 16.61c/kWh, Controlled Load 8.69c/kWh. For additional information visit www.globirdenergy.com.au/energy-saver/wholesave","variation":"This is wholesale-linked plan, prices change every 5 minutes. Quoted annual cost is an estimate only. Usage rate uses last financial year's wholesale spot price, a representative usage of 4200 kWh,  plus any fixed usage rate.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"70.00","description":"Min disconnection fee inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"MEMBERSHIP","amount":"264.00","description":"Membership fee of $0.7213 per day equivalent to $22 per month to access wholesale price.","term":"ANNUAL"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":42.9},{"plan_id":"globird-glo1052977mre3eme-electricity","cdr_plan_id":"GLO1052977MRE3@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"WHOLESAVE Resi (Single Rate) estimate-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":25.19,"supply_charge_cents_per_day":84},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1062.3,"at_4000_kwh":1314.2,"at_5000_kwh":1566.1,"at_8000_kwh":2321.8},"marginal_rates":{"excess_unit_cost_cents":25.19,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Additional Eligibility"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1052977mre3eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 GLO1052977MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"If you get Feed-In, you will get a feed-in tariff linked to the wholesale price subject to a 0% allowance","type":"single","rate_cents_per_kwh":0}],"terms":"Daily Supply Charge is in addition to Membership Fee.  Usage rates include fixed charges and variable ones linked to 5-min wholesale prices  (Network Losses apply). Fixed charge rates incl GST: Peak 16.61c/kWh. For additional information visit www.globirdenergy.com.au/energy-saver/wholesave","variation":"This is wholesale-linked plan, prices change every 5 minutes. Quoted annual cost is an estimate only. Usage rate uses last financial year's wholesale spot price, a representative usage of 4000 kWh,  plus any fixed usage rate.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"70.00","description":"Min disconnection fee inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"MEMBERSHIP","amount":"264.00","description":"Membership fee of $0.7213 per day equivalent to $22 per month to access wholesale price.","term":"ANNUAL"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":42.9},{"plan_id":"energy-locals-retail-lcl986601mbe1eme-electricity","cdr_plan_id":"LCL986601MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Member - Bonus Credit","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":123.18,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":29.09,"shoulder_cents_per_kwh":37.73,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Winter: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Summer: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-4:59pm sat, sun","shoulder_hours":"Winter: 7am-8:59pm mon, tue, wed, thu, fri · Summer: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Sign Up Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$175 credit is available for new customers only, and is applied if your electricity supply remains with us for 6 months."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1112.34,"at_4000_kwh":1333.25,"at_5000_kwh":1554.16,"at_8000_kwh":2216.89},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986601mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986601MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"389.88","description":"Access wholesale energy rates with a $32.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.09},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.73},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.09}]}]},{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.09},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.73},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.36},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.09},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.36},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":42.1},{"plan_id":"flipped-fea1059484mre1eme-electricity","cdr_plan_id":"FEA1059484MRE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Freedom Switched On! Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":70,"peak_cents_per_kwh":57.62,"off_peak_cents_per_kwh":9.93,"shoulder_cents_per_kwh":35.99,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9am-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"9pm-8:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1138.97,"at_4000_kwh":1433.46,"at_5000_kwh":1727.95,"at_8000_kwh":2611.42},"marginal_rates":{"excess_unit_cost_cents":57.62,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059484mre1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059484MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":9,"rateCents":35.99},{"type":"OFF_PEAK","startHour":9,"endHour":17,"rateCents":9.93},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.62},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":35.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":37.7},{"plan_id":"raa-energy-raa1021043mre2eme-electricity","cdr_plan_id":"RAA1021043MRE2@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Standard to Smart","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":99.37,"peak_cents_per_kwh":34.64,"off_peak_cents_per_kwh":25.16,"shoulder_cents_per_kwh":20.43,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1174.44,"at_4000_kwh":1445.02,"at_5000_kwh":1715.6,"at_8000_kwh":2527.34},"marginal_rates":{"excess_unit_cost_cents":34.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1021043mre2eme-electricity&source=ai","last_verified":"2025-11-25","source_doc":"CDR EnergyPlanDetailV3 RAA1021043MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":25.16},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":34.64},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":20.43},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":34.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":37.2},{"plan_id":"raa-energy-raa1021039mre2eme-electricity","cdr_plan_id":"RAA1021039MRE2@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Smart","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":99.37,"peak_cents_per_kwh":34.64,"off_peak_cents_per_kwh":25.16,"shoulder_cents_per_kwh":20.43,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1174.44,"at_4000_kwh":1445.02,"at_5000_kwh":1715.6,"at_8000_kwh":2527.34},"marginal_rates":{"excess_unit_cost_cents":34.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1021039mre2eme-electricity&source=ai","last_verified":"2025-11-25","source_doc":"CDR EnergyPlanDetailV3 RAA1021039MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":25.16},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":34.64},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":20.43},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":34.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":37.2},{"plan_id":"raa-energy-raa1042431mre1eme-electricity","cdr_plan_id":"RAA1042431MRE1@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Smart","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.3,"peak_cents_per_kwh":34.64,"off_peak_cents_per_kwh":25.16,"shoulder_cents_per_kwh":20.43,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1181.49,"at_4000_kwh":1452.07,"at_5000_kwh":1722.65,"at_8000_kwh":2534.38},"marginal_rates":{"excess_unit_cost_cents":34.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1042431mre1eme-electricity&source=ai","last_verified":"2026-03-20","source_doc":"CDR EnergyPlanDetailV3 RAA1042431MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":25.16},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":34.64},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":20.43},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":34.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":36.9},{"plan_id":"raa-energy-raa1042436mre1eme-electricity","cdr_plan_id":"RAA1042436MRE1@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Standard to Smart","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.3,"peak_cents_per_kwh":34.64,"off_peak_cents_per_kwh":25.16,"shoulder_cents_per_kwh":20.43,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1181.49,"at_4000_kwh":1452.07,"at_5000_kwh":1722.65,"at_8000_kwh":2534.38},"marginal_rates":{"excess_unit_cost_cents":34.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1042436mre1eme-electricity&source=ai","last_verified":"2026-03-20","source_doc":"CDR EnergyPlanDetailV3 RAA1042436MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":25.16},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":34.64},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":20.43},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":34.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":36.9},{"plan_id":"flipped-fea1059517sbe1eme-electricity","cdr_plan_id":"FEA1059517SBE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Business Freedom Standing Offer - Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":3.04,"peak_cents_per_kwh":61.13,"off_peak_cents_per_kwh":18.55,"shoulder_cents_per_kwh":43.68,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9am-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"9pm-8:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1101.6,"at_4000_kwh":1465.1,"at_5000_kwh":1828.6,"at_8000_kwh":2919.1},"marginal_rates":{"excess_unit_cost_cents":61.13,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059517sbe1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059517SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":9,"rateCents":43.68},{"type":"OFF_PEAK","startHour":9,"endHour":17,"rateCents":18.55},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":61.13},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":43.68}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":36.3},{"plan_id":"raa-energy-raa1042437mre1eme-electricity","cdr_plan_id":"RAA1042437MRE1@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Solar Smart","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":88.64,"peak_cents_per_kwh":36.35,"off_peak_cents_per_kwh":27.65,"shoulder_cents_per_kwh":22.9,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1202.84,"at_4000_kwh":1495.94,"at_5000_kwh":1789.04,"at_8000_kwh":2668.34},"marginal_rates":{"excess_unit_cost_cents":36.35,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1042437mre1eme-electricity&source=ai","last_verified":"2026-03-20","source_doc":"CDR EnergyPlanDetailV3 RAA1042437MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":27.65},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.35},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":22.9},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":35},{"plan_id":"raa-energy-raa1042434mre1eme-electricity","cdr_plan_id":"RAA1042434MRE1@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Solar Standard to Smart","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":88.64,"peak_cents_per_kwh":36.35,"off_peak_cents_per_kwh":27.65,"shoulder_cents_per_kwh":22.9,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1202.84,"at_4000_kwh":1495.94,"at_5000_kwh":1789.04,"at_8000_kwh":2668.34},"marginal_rates":{"excess_unit_cost_cents":36.35,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1042434mre1eme-electricity&source=ai","last_verified":"2026-03-20","source_doc":"CDR EnergyPlanDetailV3 RAA1042434MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":27.65},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.35},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":22.9},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":35},{"plan_id":"raa-energy-raa1021055mre2eme-electricity","cdr_plan_id":"RAA1021055MRE2@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Solar Standard to Smart","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":90.45,"peak_cents_per_kwh":36.35,"off_peak_cents_per_kwh":27.65,"shoulder_cents_per_kwh":22.9,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1209.44,"at_4000_kwh":1502.54,"at_5000_kwh":1795.64,"at_8000_kwh":2674.94},"marginal_rates":{"excess_unit_cost_cents":36.35,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1021055mre2eme-electricity&source=ai","last_verified":"2025-11-25","source_doc":"CDR EnergyPlanDetailV3 RAA1021055MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":27.65},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.35},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":22.9},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":34.7},{"plan_id":"raa-energy-raa1021051mre2eme-electricity","cdr_plan_id":"RAA1021051MRE2@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Solar Smart","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":90.45,"peak_cents_per_kwh":36.35,"off_peak_cents_per_kwh":27.65,"shoulder_cents_per_kwh":22.9,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1209.44,"at_4000_kwh":1502.54,"at_5000_kwh":1795.64,"at_8000_kwh":2674.94},"marginal_rates":{"excess_unit_cost_cents":36.35,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1021051mre2eme-electricity&source=ai","last_verified":"2025-11-25","source_doc":"CDR EnergyPlanDetailV3 RAA1021051MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":27.65},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.35},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":22.9},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":34.7},{"plan_id":"radian-ior1009972mbe1eme-electricity","cdr_plan_id":"IOR1009972MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Smart Business: MBTOUD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":181.82,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":30,"peak_hours":"Summer months: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Non-winter months: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Summer months: 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-6:59am mon, tue, wed, thu, fri; 12am-4:59pm sat, sun","shoulder_hours":"Non-winter months: 7am-8:59pm mon, tue, wed, thu, fri · Summer months: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Demand Charges","description":"Anytime maximum demand charge based on highest half- hour demand during last 12 months c/kVA/day","amount_cents_per_kw":8.64,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1293.64,"at_4000_kwh":1503.64,"at_5000_kwh":1713.64,"at_8000_kwh":2343.64},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009972mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009972MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Off-peak","description":"Daytime Usage - Everyday - 10:00am–3:59pm","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":-2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Peak","description":"Evening Usage - Everyday - 6:00pm–8:59pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":18,"hours":"6pm-8:59pm","startHour":18,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Shoulder","description":"Other Usage - Everyday - All other times","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":0,"endHour":10},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":16,"endHour":18},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":21,"endHour":24}]}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"Non-winter months (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":30},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30}]}]},{"season":"Summer months (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":30},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":77.27},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":77.27},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":34.7},{"plan_id":"energy-locals-retail-lcl986600mbe1eme-electricity","cdr_plan_id":"LCL986600MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":155.91,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":30.91,"shoulder_cents_per_kwh":39.55,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Winter: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Summer: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-4:59pm sat, sun","shoulder_hours":"Winter: 7am-8:59pm mon, tue, wed, thu, fri · Summer: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1270.02,"at_4000_kwh":1503.67,"at_5000_kwh":1737.32,"at_8000_kwh":2438.27},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986600mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986600MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.91},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":39.55},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.91}]}]},{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.91},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":39.55},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":47.73},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.91},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":47.73},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.91}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":34.7},{"plan_id":"lumo-energy-sa-lum203096mbe20eme-electricity","cdr_plan_id":"LUM203096MBE20@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic (Seasonal Demand)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":92.85,"peak_cents_per_kwh":41,"off_peak_cents_per_kwh":20.91,"shoulder_cents_per_kwh":32,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Time of Use Seasonal Demand (CENT/kVA/DAY)","description":"Maximum Demand: maximum interval consumption over relevant bill period occurring anytime; Billable Maximum demand is the greater of: Bill Demand from bills within 365 days from the end date of the current bill; Network's Peak Demand values within 365 days from the end date of the current bill","amount_cents_per_kw":12.98,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1213.55,"at_4000_kwh":1505.1,"at_5000_kwh":1796.65,"at_8000_kwh":2671.3},"marginal_rates":{"excess_unit_cost_cents":41,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203096mbe20eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203096MBE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":20.91},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":32},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":41},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":20.91},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":41},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":20.91},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":20.91}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":34.6},{"plan_id":"origin-ori1017746mre2eme-electricity","cdr_plan_id":"ORI1017746MRE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Battery Maximiser","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":50,"off_peak_cents_per_kwh":19,"shoulder_cents_per_kwh":null,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1234.08,"at_4000_kwh":1517.08,"at_5000_kwh":1800.08,"at_8000_kwh":2649.08},"marginal_rates":{"excess_unit_cost_cents":50,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Origin Loop Terms; Tariff"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1017746mre2eme-electricity&source=ai","last_verified":"2025-12-10","source_doc":"CDR EnergyPlanDetailV3 ORI1017746MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 22 cents per kWh during Peak hours between 5pm to 9 pm all days.","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":22,"hours":"5pm-8:59pm","startHour":17,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For the remaining Off-Peak hours between 9pm to 5pm, Origin Offers 4 cents per kWh.","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":4,"hours":"9pm-4:59pm","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":4,"hours":"9pm-4:59pm","startHour":0,"endHour":17}]}],"terms":"You must be on the Origin Loop VPP Origin Battery Maximiser. Your Solar system must be net metered and you must not be receiving a feed-in tariff under any government scheme. Premises cannot rely on electricity for life support or other critical needs.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":19},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":19}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":34.1},{"plan_id":"energy-locals-retail-lcl986577mbe1eme-electricity","cdr_plan_id":"LCL986577MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Member - Bonus Credit","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":203.18,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":25.91,"shoulder_cents_per_kwh":32.27,"peak_hours":"Summer Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Winter Off Peak: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Summer Peak: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-4:59pm sat, sun","shoulder_hours":"Winter Off Peak: 7am-8:59pm mon, tue, wed, thu, fri · Summer Peak: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Anytime Demand","description":"Demand Charge  All kVA (c/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.64,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":4,"season_end_month":10,"season_label":"Winter Off Peak"},{"display_name":"Anytime Demand","description":"Demand Charge  All kVA (c/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.64,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":11,"season_end_month":3,"season_label":"Summer Peak"}],"conditional_discounts":[{"type":"other","description":"Sign Up Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$175 credit is available for new customers only, and is applied if your electricity supply remains with us for 6 months."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1323.88,"at_4000_kwh":1517.97,"at_5000_kwh":1712.06,"at_8000_kwh":2294.33},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986577mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986577MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"389.88","description":"Access wholesale energy rates with a $32.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"Winter Off Peak (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":25.91},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":32.27},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":25.91}]}]},{"season":"Summer Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":25.91},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":32.27},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":38.18},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":25.91},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":38.18},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25.91}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":34},{"plan_id":"amber-electric-amb1043554mre1eme-electricity","cdr_plan_id":"AMB1043554MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"No Feed-In + CBA Yello Gold: Variable Prices (estimate)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":28.96,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Gold","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $180 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Gold segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1230.84,"at_4000_kwh":1520.44,"at_5000_kwh":1810.04,"at_8000_kwh":2678.84},"marginal_rates":{"excess_unit_cost_cents":28.96,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"CommBank Yello Gold; Smart Meter Installation; No Solar or Battery"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043554mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043554MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in the SA Power Networks distribution region with a flat rate tariff and without a solar or battery system. For illustrative purposes, tariff RSR assumed. Our bill guarantee sets the maximum average rates we charge over a calendar quarter. For general usage this is 43.37c/kWh.","variation":"Prices are not fixed. Amber passes through wholesale electricity prices directly at cost, including: wholesale energy costs, hedging costs, network charges (per kWh and per day), metering costs, environmental costs and carbon offset costs. The usage price here is an estimate based on the median wholesale prices paid in the last 12 months for non solar Amber customers in your network. Annual price estimate includes Amber monthly subscription fee. Visit www.amber.com.au/how-it-works","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33.9},{"plan_id":"amber-electric-amb1043560mre1eme-electricity","cdr_plan_id":"AMB1043560MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"No Feed-In + Yello Diamond: Variable Prices (estimate)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":28.96,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Diamond","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $210 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Diamond segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1230.84,"at_4000_kwh":1520.44,"at_5000_kwh":1810.04,"at_8000_kwh":2678.84},"marginal_rates":{"excess_unit_cost_cents":28.96,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"CommBank Yello Diamond; Smart Meter Installation; No Solar or Battery"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043560mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043560MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in the SA Power Networks distribution region with a flat rate tariff and without a solar or battery system. For illustrative purposes, tariff RSR assumed. Our bill guarantee sets the maximum average rates we charge over a calendar quarter. For general usage this is 43.37c/kWh.","variation":"Prices are not fixed. Amber passes through wholesale electricity prices directly at cost, including: wholesale energy costs, hedging costs, network charges (per kWh and per day), metering costs, environmental costs and carbon offset costs. The usage price here is an estimate based on the median wholesale prices paid in the last 12 months for non solar Amber customers in your network. Annual price estimate includes Amber monthly subscription fee. Visit www.amber.com.au/how-it-works","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33.9},{"plan_id":"amber-electric-amb1043548mre1eme-electricity","cdr_plan_id":"AMB1043548MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"No Feed-In + CBA Yello Plus: Variable Prices (estimate)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":28.96,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Plus","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $150 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Plus segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1230.84,"at_4000_kwh":1520.44,"at_5000_kwh":1810.04,"at_8000_kwh":2678.84},"marginal_rates":{"excess_unit_cost_cents":28.96,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"CommBank Yello Plus; Smart Meter Installation; No Solar or Battery"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043548mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043548MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in the SA Power Networks distribution region with a flat rate tariff and without a solar or battery system. For illustrative purposes, tariff RSR assumed. Our bill guarantee sets the maximum average rates we charge over a calendar quarter. For general usage this is 43.37c/kWh.","variation":"Prices are not fixed. Amber passes through wholesale electricity prices directly at cost, including: wholesale energy costs, hedging costs, network charges (per kWh and per day), metering costs, environmental costs and carbon offset costs. The usage price here is an estimate based on the median wholesale prices paid in the last 12 months for non solar Amber customers in your network. Annual price estimate includes Amber monthly subscription fee. Visit www.amber.com.au/how-it-works","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33.9},{"plan_id":"amber-electric-amb1043536mre1eme-electricity","cdr_plan_id":"AMB1043536MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"No Feed-In: Variable Prices (estimate only)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":28.96,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1230.84,"at_4000_kwh":1520.44,"at_5000_kwh":1810.04,"at_8000_kwh":2678.84},"marginal_rates":{"excess_unit_cost_cents":28.96,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Smart Meter Installation; No Solar or Battery"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043536mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043536MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in the SA Power Networks distribution region with a flat rate tariff and without a solar or battery system. For illustrative purposes, tariff RSR assumed. Our bill guarantee sets the maximum average rates we charge over a calendar quarter. For general usage this is 43.37c/kWh.","variation":"Prices are not fixed. Amber passes through wholesale electricity prices directly at cost, including: wholesale energy costs, hedging costs, network charges (per kWh and per day), metering costs, environmental costs and carbon offset costs. The usage price here is an estimate based on the median wholesale prices paid in the last 12 months for non solar Amber customers in your network. Annual price estimate includes Amber monthly subscription fee. Visit www.amber.com.au/how-it-works","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33.9},{"plan_id":"amber-electric-amb1043542mre1eme-electricity","cdr_plan_id":"AMB1043542MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"No Feed-In + CBA Yello: Variable Prices (estimate only)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":28.96,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $120 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1230.84,"at_4000_kwh":1520.44,"at_5000_kwh":1810.04,"at_8000_kwh":2678.84},"marginal_rates":{"excess_unit_cost_cents":28.96,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"CommBank Yello; Smart Meter Installation; No Solar or Battery"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043542mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043542MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in the SA Power Networks distribution region with a flat rate tariff and without a solar or battery system. For illustrative purposes, tariff RSR assumed. Our bill guarantee sets the maximum average rates we charge over a calendar quarter. For general usage this is 43.37c/kWh.","variation":"Prices are not fixed. Amber passes through wholesale electricity prices directly at cost, including: wholesale energy costs, hedging costs, network charges (per kWh and per day), metering costs, environmental costs and carbon offset costs. The usage price here is an estimate based on the median wholesale prices paid in the last 12 months for non solar Amber customers in your network. Annual price estimate includes Amber monthly subscription fee. Visit www.amber.com.au/how-it-works","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33.9},{"plan_id":"ovo-energy-ovo723748mre18eme-electricity","cdr_plan_id":"OVO723748MRE18@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The EV Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":134,"peak_cents_per_kwh":59.74,"off_peak_cents_per_kwh":0,"shoulder_cents_per_kwh":39.95,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun; 12am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1266.46,"at_4000_kwh":1525.58,"at_5000_kwh":1784.7,"at_8000_kwh":2562.06},"marginal_rates":{"excess_unit_cost_cents":59.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric Vehicle requirement"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo723748mre18eme-electricity&source=ai","last_verified":"2026-04-15","source_doc":"CDR EnergyPlanDetailV3 OVO723748MRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Off-Peak","description":"$0.045/kWh usage charge between midnight and 6am. Does not apply to controlled loads. For more information head to www.ovoenergy.com.au/electric-vehicles/"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":39.95},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":59.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":39.95},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":59.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33.7},{"plan_id":"ovo-energy-ovo723814mre18eme-electricity","cdr_plan_id":"OVO723814MRE18@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The EV Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":134,"peak_cents_per_kwh":59.74,"off_peak_cents_per_kwh":0,"shoulder_cents_per_kwh":39.95,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun; 12am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1266.46,"at_4000_kwh":1525.58,"at_5000_kwh":1784.7,"at_8000_kwh":2562.06},"marginal_rates":{"excess_unit_cost_cents":59.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric Vehicle requirement"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo723814mre18eme-electricity&source=ai","last_verified":"2026-04-15","source_doc":"CDR EnergyPlanDetailV3 OVO723814MRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Off-Peak","description":"$0.045/kWh usage charge between midnight and 6am. Does not apply to controlled loads. For more information head to www.ovoenergy.com.au/electric-vehicles/"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":39.95},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":59.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":39.95},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":59.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33.7},{"plan_id":"energy-locals-retail-lcl1051065mre1eme-electricity","cdr_plan_id":"LCL1051065MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Online Member to SA Daytime Essential","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.64,"peak_cents_per_kwh":41.36,"off_peak_cents_per_kwh":26.36,"shoulder_cents_per_kwh":11.82,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1253.35,"at_4000_kwh":1532.87,"at_5000_kwh":1812.39,"at_8000_kwh":2650.95},"marginal_rates":{"excess_unit_cost_cents":41.36,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Meter Upgrade"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1051065mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 LCL1051065MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"197.88","description":"Access wholesale energy rates with a $16.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX payments via energylocalsretail.com.au/pay-by-card. Debit card transactions are subject to a 0.46% fee, and credit card payments incur a 0.81% fee. Card processing fees are waived for Direct Debit payments.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":26.36},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":41.36},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":11.82},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":41.36}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33.4},{"plan_id":"energy-locals-retail-lcl1051063mre1eme-electricity","cdr_plan_id":"LCL1051063MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Daytime Essential","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.64,"peak_cents_per_kwh":41.36,"off_peak_cents_per_kwh":26.36,"shoulder_cents_per_kwh":11.82,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1253.35,"at_4000_kwh":1532.87,"at_5000_kwh":1812.39,"at_8000_kwh":2650.95},"marginal_rates":{"excess_unit_cost_cents":41.36,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1051063mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 LCL1051063MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"197.88","description":"Access wholesale energy rates with a $16.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX payments via energylocalsretail.com.au/pay-by-card. Debit card transactions are subject to a 0.46% fee, and credit card payments incur a 0.81% fee. Card processing fees are waived for Direct Debit payments.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":26.36},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":41.36},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":11.82},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":41.36}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33.4},{"plan_id":"1st-energy-1st1042848mbe1eme-electricity","cdr_plan_id":"1ST1042848MBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Sapphire - Time of Use + Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95,"peak_cents_per_kwh":41.9,"off_peak_cents_per_kwh":24.7,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1242.55,"at_4000_kwh":1541.15,"at_5000_kwh":1839.75,"at_8000_kwh":2735.55},"marginal_rates":{"excess_unit_cost_cents":41.9,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042848mbe1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042848MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":24.7},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":41.9},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":24.7}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":24.7}]}]}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33},{"plan_id":"1st-energy-1st1042847mbe1eme-electricity","cdr_plan_id":"1ST1042847MBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Sapphire - Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95,"peak_cents_per_kwh":41.9,"off_peak_cents_per_kwh":24.7,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1242.55,"at_4000_kwh":1541.15,"at_5000_kwh":1839.75,"at_8000_kwh":2735.55},"marginal_rates":{"excess_unit_cost_cents":41.9,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042847mbe1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042847MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":24.7},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":41.9},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":24.7}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":24.7}]}]}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":33},{"plan_id":"energy-locals-retail-lcl1051064mre2eme-electricity","cdr_plan_id":"LCL1051064MRE2@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Daytime Essential","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":119.09,"peak_cents_per_kwh":41.36,"off_peak_cents_per_kwh":26.36,"shoulder_cents_per_kwh":11.82,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1273.24,"at_4000_kwh":1552.76,"at_5000_kwh":1832.28,"at_8000_kwh":2670.84},"marginal_rates":{"excess_unit_cost_cents":41.36,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1051064mre2eme-electricity&source=ai","last_verified":"2026-04-29","source_doc":"CDR EnergyPlanDetailV3 LCL1051064MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"197.88","description":"Access wholesale energy rates with a $16.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX payments via energylocalsretail.com.au/pay-by-card. Debit card transactions are subject to a 0.46% fee, and credit card payments incur a 0.81% fee. Card processing fees are waived for Direct Debit payments.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":26.36},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":41.36},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":11.82},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":41.36}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":32.5},{"plan_id":"energy-locals-retail-lcl1051066mre2eme-electricity","cdr_plan_id":"LCL1051066MRE2@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Online Member to SA Daytime Essential","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":119.09,"peak_cents_per_kwh":41.36,"off_peak_cents_per_kwh":26.36,"shoulder_cents_per_kwh":11.82,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1273.24,"at_4000_kwh":1552.76,"at_5000_kwh":1832.28,"at_8000_kwh":2670.84},"marginal_rates":{"excess_unit_cost_cents":41.36,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Meter Upgrade"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1051066mre2eme-electricity&source=ai","last_verified":"2026-04-29","source_doc":"CDR EnergyPlanDetailV3 LCL1051066MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"197.88","description":"Access wholesale energy rates with a $16.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX payments via energylocalsretail.com.au/pay-by-card. Debit card transactions are subject to a 0.46% fee, and credit card payments incur a 0.81% fee. Card processing fees are waived for Direct Debit payments.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":26.36},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":41.36},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":11.82},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":41.36}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":32.5},{"plan_id":"raa-energy-raa1021037mre2eme-electricity","cdr_plan_id":"RAA1021037MRE2@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Standard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":30.2,"supply_charge_cents_per_day":99.55},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1269.36,"at_4000_kwh":1571.36,"at_5000_kwh":1873.36,"at_8000_kwh":2779.36},"marginal_rates":{"excess_unit_cost_cents":30.2,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1021037mre2eme-electricity&source=ai","last_verified":"2025-11-25","source_doc":"CDR EnergyPlanDetailV3 RAA1021037MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.7},{"plan_id":"kogan-kog1051292mre2eme-electricity","cdr_plan_id":"KOG1051292MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy with free FIRST","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":134.04,"peak_cents_per_kwh":36.58,"off_peak_cents_per_kwh":20.9,"shoulder_cents_per_kwh":28.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1302.97,"at_4000_kwh":1574.21,"at_5000_kwh":1845.45,"at_8000_kwh":2659.17},"marginal_rates":{"excess_unit_cost_cents":36.58,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051292mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051292MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":20.9},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.58},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":28.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.58}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.6},{"plan_id":"kogan-kog1051334mre2eme-electricity","cdr_plan_id":"KOG1051334MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy with free FIRST","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":134.04,"peak_cents_per_kwh":36.58,"off_peak_cents_per_kwh":20.9,"shoulder_cents_per_kwh":28.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1302.97,"at_4000_kwh":1574.21,"at_5000_kwh":1845.45,"at_8000_kwh":2659.17},"marginal_rates":{"excess_unit_cost_cents":36.58,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051334mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051334MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":20.9},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.58},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":28.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.58}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.6},{"plan_id":"kogan-kog1051320mre2eme-electricity","cdr_plan_id":"KOG1051320MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy for current FIRST members","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":134.04,"peak_cents_per_kwh":36.58,"off_peak_cents_per_kwh":20.9,"shoulder_cents_per_kwh":28.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1302.97,"at_4000_kwh":1574.21,"at_5000_kwh":1845.45,"at_8000_kwh":2659.17},"marginal_rates":{"excess_unit_cost_cents":36.58,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051320mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051320MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":20.9},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.58},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":28.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.58}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.6},{"plan_id":"kogan-kog1051314mre2eme-electricity","cdr_plan_id":"KOG1051314MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy for current FIRST members","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":134.04,"peak_cents_per_kwh":36.58,"off_peak_cents_per_kwh":20.9,"shoulder_cents_per_kwh":28.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1302.97,"at_4000_kwh":1574.21,"at_5000_kwh":1845.45,"at_8000_kwh":2659.17},"marginal_rates":{"excess_unit_cost_cents":36.58,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051314mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051314MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":20.9},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.58},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":28.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.58}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.6},{"plan_id":"powershop-psh1051110mre1eme-electricity","cdr_plan_id":"PSH1051110MRE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power House","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":134.04,"peak_cents_per_kwh":36.58,"off_peak_cents_per_kwh":20.9,"shoulder_cents_per_kwh":28.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1302.97,"at_4000_kwh":1574.21,"at_5000_kwh":1845.45,"at_8000_kwh":2659.17},"marginal_rates":{"excess_unit_cost_cents":36.58,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1051110mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 PSH1051110MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to Powershop automatically debiting your preferred payment method for any outstanding amounts due. Further information in relation to this offer, see our terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":20.9},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.58},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":28.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.58}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.6},{"plan_id":"powershop-psh1051126mre1eme-electricity","cdr_plan_id":"PSH1051126MRE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power House","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":134.04,"peak_cents_per_kwh":36.58,"off_peak_cents_per_kwh":20.9,"shoulder_cents_per_kwh":28.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1302.97,"at_4000_kwh":1574.21,"at_5000_kwh":1845.45,"at_8000_kwh":2659.17},"marginal_rates":{"excess_unit_cost_cents":36.58,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1051126mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 PSH1051126MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to Powershop automatically debiting your preferred payment method for any outstanding amounts due. Further information in relation to this offer, see our terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":20.9},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.58},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":28.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.58}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.6},{"plan_id":"next-business-nex1044178mbe1eme-electricity","cdr_plan_id":"NEX1044178MBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"Next Assured Bus 15% GTD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":167.74,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":32.08,"shoulder_cents_per_kwh":40.33,"peak_hours":"High Season Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Low Season Off Peak: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · High Season Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun","shoulder_hours":"Low Season Off Peak: 7am-8:59pm mon, tue, wed, thu, fri · High Season Peak: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Rolling Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.84,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":4,"season_end_month":10,"season_label":"Low Season Off Peak"},{"display_name":"Rolling Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.84,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":11,"season_end_month":3,"season_label":"High Season Peak"}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.1,"annual_cost_estimates":{"at_3000_kwh":1335.43,"at_4000_kwh":1576.49,"at_5000_kwh":1817.55,"at_8000_kwh":2540.73},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1044178mbe1eme-electricity&source=ai","last_verified":"2026-03-31","source_doc":"CDR EnergyPlanDetailV3 NEX1044178MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT Premium: Single Rate Feed In Tariff","description":"FiT Premium | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"RFIT: Single Rate Feed In Tariff","description":"RFIT | All kWh/day","type":"single","rate_cents_per_kwh":0.1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":7,"hours":"5pm-7:59pm","startHour":17,"endHour":20}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":0,"hours":"10am-2:59pm","startHour":10,"endHour":15}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":0,"endHour":10},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":15,"endHour":17},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":20,"endHour":24}]}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates at any time in accordance with our terms and conditions.","onExpiryDescription":"This contract continues for as long as you choose to remain on the plan.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"CC_PROCESSING","amount":"0.0195","description":"1.95% AMEX credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0195"},{"type":"RECONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0077","description":"0.77% Visa & Mastercard credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0077"},{"type":"OTHER","amount":"77.00","description":"COMMS3 Meter Charge","term":"FIXED"},{"type":"OTHER","amount":"77.00","description":"COMMS4 Meter Charge","term":"FIXED"}],"touSchedule":[{"season":"Low Season Off Peak (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.08},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":40.33},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.08}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":32.08}]}]},{"season":"High Season Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.08},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":40.33},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.17},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.08}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":32.08},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.17},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.08}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.5},{"plan_id":"raa-energy-raa1021038mre2eme-electricity","cdr_plan_id":"RAA1021038MRE2@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Standard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":30.2,"supply_charge_cents_per_day":101.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1276.47,"at_4000_kwh":1578.48,"at_5000_kwh":1880.48,"at_8000_kwh":2786.48},"marginal_rates":{"excess_unit_cost_cents":30.2,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1021038mre2eme-electricity&source=ai","last_verified":"2025-11-25","source_doc":"CDR EnergyPlanDetailV3 RAA1021038MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.4},{"plan_id":"flipped-fea1059473mre1eme-electricity","cdr_plan_id":"FEA1059473MRE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Freedom Switched On!","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":110,"peak_cents_per_kwh":57.62,"off_peak_cents_per_kwh":9.93,"shoulder_cents_per_kwh":35.99,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9am-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"9pm-8:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1284.97,"at_4000_kwh":1579.46,"at_5000_kwh":1873.95,"at_8000_kwh":2757.42},"marginal_rates":{"excess_unit_cost_cents":57.62,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059473mre1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059473MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":9,"rateCents":35.99},{"type":"OFF_PEAK","startHour":9,"endHour":17,"rateCents":9.93},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.62},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":35.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.4},{"plan_id":"agl-agl1055698mre1eme-electricity","cdr_plan_id":"AGL1055698MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055698mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055698MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl1055695mre1eme-electricity","cdr_plan_id":"AGL1055695MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055695mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055695MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl1055699mre1eme-electricity","cdr_plan_id":"AGL1055699MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055699mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055699MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl1055697mre1eme-electricity","cdr_plan_id":"AGL1055697MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055697mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055697MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl1055655mre1eme-electricity","cdr_plan_id":"AGL1055655MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055655mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055655MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl1055656mre1eme-electricity","cdr_plan_id":"AGL1055656MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055656mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055656MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl1055657mre1eme-electricity","cdr_plan_id":"AGL1055657MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055657mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055657MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl898888mre9eme-electricity","cdr_plan_id":"AGL898888MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898888mre9eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898888MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl898889mre9eme-electricity","cdr_plan_id":"AGL898889MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898889mre9eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898889MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl898867mre9eme-electricity","cdr_plan_id":"AGL898867MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898867mre9eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898867MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl779403mre18eme-electricity","cdr_plan_id":"AGL779403MRE18@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl779403mre18eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL779403MRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl360485mre39eme-electricity","cdr_plan_id":"AGL360485MRE39@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl360485mre39eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL360485MRE39@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl360486mre39eme-electricity","cdr_plan_id":"AGL360486MRE39@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl360486mre39eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL360486MRE39@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"agl-agl360496mre39eme-electricity","cdr_plan_id":"AGL360496MRE39@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":89.76,"peak_cents_per_kwh":43.74,"off_peak_cents_per_kwh":28.43,"shoulder_cents_per_kwh":20.1,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1268.33,"at_4000_kwh":1581.9,"at_5000_kwh":1895.47,"at_8000_kwh":2836.18},"marginal_rates":{"excess_unit_cost_cents":43.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl360496mre39eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL360496MRE39@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.74},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.74},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.74}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":31.3},{"plan_id":"blue-nrg-blu1043597mbe1eme-electricity","cdr_plan_id":"BLU1043597MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Zembl Edge","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97.24,"peak_cents_per_kwh":38.03,"off_peak_cents_per_kwh":27.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1280.37,"at_4000_kwh":1588.85,"at_5000_kwh":1897.33,"at_8000_kwh":2822.77},"marginal_rates":{"excess_unit_cost_cents":38.03,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1043597mbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 BLU1043597MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due date","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":38.03},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":30.9},{"plan_id":"blue-nrg-blu1043607mbe1eme-electricity","cdr_plan_id":"BLU1043607MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Zembl Edge","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97.24,"peak_cents_per_kwh":38.03,"off_peak_cents_per_kwh":27.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1280.37,"at_4000_kwh":1588.85,"at_5000_kwh":1897.33,"at_8000_kwh":2822.77},"marginal_rates":{"excess_unit_cost_cents":38.03,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1043607mbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 BLU1043607MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due date","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":38.03},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":30.9},{"plan_id":"blue-nrg-blu1043410mbe1eme-electricity","cdr_plan_id":"BLU1043410MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Business Edge","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97.24,"peak_cents_per_kwh":38.03,"off_peak_cents_per_kwh":27.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1280.37,"at_4000_kwh":1588.85,"at_5000_kwh":1897.33,"at_8000_kwh":2822.77},"marginal_rates":{"excess_unit_cost_cents":38.03,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New Customers only."},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1043410mbe1eme-electricity&source=ai","last_verified":"2026-03-30","source_doc":"CDR EnergyPlanDetailV3 BLU1043410MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due date","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":38.03},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":30.9},{"plan_id":"blue-nrg-blu1043398mbe1eme-electricity","cdr_plan_id":"BLU1043398MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Business Edge","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97.24,"peak_cents_per_kwh":38.03,"off_peak_cents_per_kwh":27.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1280.37,"at_4000_kwh":1588.85,"at_5000_kwh":1897.33,"at_8000_kwh":2822.77},"marginal_rates":{"excess_unit_cost_cents":38.03,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New Customers only."},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1043398mbe1eme-electricity&source=ai","last_verified":"2026-03-30","source_doc":"CDR EnergyPlanDetailV3 BLU1043398MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due date","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":38.03},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":30.9},{"plan_id":"lumo-energy-sa-lum203103mre20eme-electricity","cdr_plan_id":"LUM203103MRE20@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":91.78,"peak_cents_per_kwh":46.55,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.58,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1276.73,"at_4000_kwh":1590.64,"at_5000_kwh":1904.55,"at_8000_kwh":2846.28},"marginal_rates":{"excess_unit_cost_cents":46.55,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203103mre20eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203103MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.55},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.55},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.58},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.55}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":30.9},{"plan_id":"lumo-energy-sa-lum203089mre20eme-electricity","cdr_plan_id":"LUM203089MRE20@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":91.78,"peak_cents_per_kwh":46.55,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.58,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1276.73,"at_4000_kwh":1590.64,"at_5000_kwh":1904.55,"at_8000_kwh":2846.28},"marginal_rates":{"excess_unit_cost_cents":46.55,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203089mre20eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203089MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.55},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.55},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.58},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.55}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":30.9},{"plan_id":"next-business-nex1045851sbe1eme-electricity","cdr_plan_id":"NEX1045851SBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"NBE Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":121.72,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":38,"shoulder_cents_per_kwh":49,"peak_hours":"High Season Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Low Season Off Peak: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · High Season Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun","shoulder_hours":"Low Season Off Peak: 7am-8:59pm mon, tue, wed, thu, fri · High Season Peak: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.28,"at_4000_kwh":1596.28,"at_5000_kwh":1884.28,"at_8000_kwh":2748.28},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1045851sbe1eme-electricity&source=ai","last_verified":"2026-04-16","source_doc":"CDR EnergyPlanDetailV3 NEX1045851SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Standing: Single Rate Feed In Tariff","description":"Solar | All kWh/day","type":"single","rate_cents_per_kwh":2}],"terms":"This offer is only available to small customers where Next Business Energy is currently financially responsible for the premise. The sale of electricity to the Customer is subject to Next Business Energy's Standing Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates in accordance with applicable Energy Laws.","onExpiryDescription":"This Standing Offer Contract continues until you change to another electricity supplier or accept an offer from Next Business Energy.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"RECONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"}],"touSchedule":[{"season":"Low Season Off Peak (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":38}]}]},{"season":"High Season Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":38},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":30.6},{"plan_id":"next-business-nex1045850sbe1eme-electricity","cdr_plan_id":"NEX1045850SBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"NBE Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":121.72,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":38,"shoulder_cents_per_kwh":49,"peak_hours":"High Season Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Low Season Off Peak: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · High Season Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun","shoulder_hours":"Low Season Off Peak: 7am-8:59pm mon, tue, wed, thu, fri · High Season Peak: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Max Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Mon - Fri, 12:00 - 21:00.","amount_cents_per_kw":8.84,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":4,"season_end_month":10,"season_label":"Low Season Off Peak"},{"display_name":"Additional Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.84,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":4,"season_end_month":10,"season_label":"Low Season Off Peak"},{"display_name":"Max Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Mon - Fri, 12:00 - 21:00.","amount_cents_per_kw":8.84,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":11,"season_end_month":3,"season_label":"High Season Peak"},{"display_name":"Additional Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.84,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":11,"season_end_month":3,"season_label":"High Season Peak"}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.28,"at_4000_kwh":1596.28,"at_5000_kwh":1884.28,"at_8000_kwh":2748.28},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1045850sbe1eme-electricity&source=ai","last_verified":"2026-04-16","source_doc":"CDR EnergyPlanDetailV3 NEX1045850SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Standing: Single Rate Feed In Tariff","description":"Solar | All kWh/day","type":"single","rate_cents_per_kwh":2}],"terms":"This offer is only available to small customers where Next Business Energy is currently financially responsible for the premise. The sale of electricity to the Customer is subject to Next Business Energy's Standing Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates in accordance with applicable Energy Laws.","onExpiryDescription":"This Standing Offer Contract continues until you change to another electricity supplier or accept an offer from Next Business Energy.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"RECONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"}],"touSchedule":[{"season":"Low Season Off Peak (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":38}]}]},{"season":"High Season Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":38},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":30.6},{"plan_id":"ovo-energy-ovo723774mre18eme-electricity","cdr_plan_id":"OVO723774MRE18@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic EV Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":140.7,"peak_cents_per_kwh":62.73,"off_peak_cents_per_kwh":0,"shoulder_cents_per_kwh":41.95,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun; 12am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1329.82,"at_4000_kwh":1601.92,"at_5000_kwh":1874.01,"at_8000_kwh":2690.27},"marginal_rates":{"excess_unit_cost_cents":62.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric Vehicle requirement"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo723774mre18eme-electricity&source=ai","last_verified":"2026-04-15","source_doc":"CDR EnergyPlanDetailV3 OVO723774MRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Off-Peak","description":"$0.04725/kWh usage charge between midnight and 6am. Does not apply to controlled loads. For more information head to www.ovoenergy.com.au/electric-vehicles/"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":41.95},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":62.73},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":41.95},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":62.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":30.4},{"plan_id":"ovo-energy-ovo723789mre18eme-electricity","cdr_plan_id":"OVO723789MRE18@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic EV Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":140.7,"peak_cents_per_kwh":62.73,"off_peak_cents_per_kwh":0,"shoulder_cents_per_kwh":41.95,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun; 12am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1329.82,"at_4000_kwh":1601.92,"at_5000_kwh":1874.01,"at_8000_kwh":2690.27},"marginal_rates":{"excess_unit_cost_cents":62.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric Vehicle requirement"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo723789mre18eme-electricity&source=ai","last_verified":"2026-04-15","source_doc":"CDR EnergyPlanDetailV3 OVO723789MRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Off-Peak","description":"$0.04725/kWh usage charge between midnight and 6am. Does not apply to controlled loads. For more information head to www.ovoenergy.com.au/electric-vehicles/"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":41.95},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":62.73},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":41.95},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":62.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":30.4},{"plan_id":"energy-locals-retail-lcl1042409mre1eme-electricity","cdr_plan_id":"LCL1042409MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Local Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":115.45,"peak_cents_per_kwh":37.73,"off_peak_cents_per_kwh":28.18,"shoulder_cents_per_kwh":23.18,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1322.74,"at_4000_kwh":1623.19,"at_5000_kwh":1923.64,"at_8000_kwh":2824.99},"marginal_rates":{"excess_unit_cost_cents":37.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1042409mre1eme-electricity&source=ai","last_verified":"2026-03-20","source_doc":"CDR EnergyPlanDetailV3 LCL1042409MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"257.88","description":"Access wholesale energy rates with a $21.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.18},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":37.73},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":23.18},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":37.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.5},{"plan_id":"energy-locals-retail-lcl1042410mre1eme-electricity","cdr_plan_id":"LCL1042410MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Online Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":115.45,"peak_cents_per_kwh":37.73,"off_peak_cents_per_kwh":28.18,"shoulder_cents_per_kwh":23.18,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1322.74,"at_4000_kwh":1623.19,"at_5000_kwh":1923.64,"at_8000_kwh":2824.99},"marginal_rates":{"excess_unit_cost_cents":37.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1042410mre1eme-electricity&source=ai","last_verified":"2026-03-20","source_doc":"CDR EnergyPlanDetailV3 LCL1042410MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"197.88","description":"Access wholesale energy rates with a $16.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX payments via energylocalsretail.com.au/pay-by-card. Debit card transactions are subject to a 0.46% fee, and credit card payments incur a 0.81% fee. Card processing fees are waived for Direct Debit payments.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.18},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":37.73},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":23.18},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":37.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.5},{"plan_id":"energy-locals-retail-lcl986591mre1eme-electricity","cdr_plan_id":"LCL986591MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Online Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":115.45,"peak_cents_per_kwh":37.73,"off_peak_cents_per_kwh":28.18,"shoulder_cents_per_kwh":23.18,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1322.74,"at_4000_kwh":1623.19,"at_5000_kwh":1923.64,"at_8000_kwh":2824.99},"marginal_rates":{"excess_unit_cost_cents":37.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986591mre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986591MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"197.88","description":"Access wholesale energy rates with a $16.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.18},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":37.73},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":23.18},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":37.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.5},{"plan_id":"energy-locals-retail-lcl986589mre1eme-electricity","cdr_plan_id":"LCL986589MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Local Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":115.45,"peak_cents_per_kwh":37.73,"off_peak_cents_per_kwh":28.18,"shoulder_cents_per_kwh":23.18,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1322.74,"at_4000_kwh":1623.19,"at_5000_kwh":1923.64,"at_8000_kwh":2824.99},"marginal_rates":{"excess_unit_cost_cents":37.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986589mre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986589MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"257.88","description":"Access wholesale energy rates with a $21.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.18},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":37.73},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":23.18},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":37.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.5},{"plan_id":"red-energy-red552376mre16eme-electricity","cdr_plan_id":"RED552376MRE16@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Saver (Bundled)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552376mre16eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552376MRE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red552384mre15eme-electricity","cdr_plan_id":"RED552384MRE15@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Saver (Bundled)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552384mre15eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552384MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red899460mre3eme-electricity","cdr_plan_id":"RED899460MRE3@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Rotary D9815 Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red899460mre3eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED899460MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Contributions to Rotary D9815","description":"Red will contribute $5 to Rotary International District 9815 Incorporated (ABN 11 298 508 921) for each calendar month you are on the Red Rotary D9815 Saver electricity plan, starting from the date we become responsible for your electricity supply."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red552294mre16eme-electricity","cdr_plan_id":"RED552294MRE16@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552294mre16eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552294MRE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red552295mre15eme-electricity","cdr_plan_id":"RED552295MRE15@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552295mre15eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552295MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red552772mre14eme-electricity","cdr_plan_id":"RED552772MRE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red BCNA Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552772mre14eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552772MRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Contributions to BCNA","description":"Red will contribute $5 to Breast Cancer Network Australia for each calendar month you are on the Red BCNA Saver electricity plan, starting from the date we become responsible for your electricity supply."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red899433mre3eme-electricity","cdr_plan_id":"RED899433MRE3@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Rotary D9815 Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red899433mre3eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED899433MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Contributions to Rotary D9815","description":"Red will contribute $5 to Rotary International District 9815 Incorporated (ABN 11 298 508 921) for each calendar month you are on the Red Rotary D9815 Saver electricity plan, starting from the date we become responsible for your electricity supply."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red552712mre13eme-electricity","cdr_plan_id":"RED552712MRE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red BCNA Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552712mre13eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552712MRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Contributions to BCNA","description":"Red will contribute $5 to Breast Cancer Network Australia for each calendar month you are on the Red BCNA Saver electricity plan, starting from the date we become responsible for your electricity supply."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red552636mre13eme-electricity","cdr_plan_id":"RED552636MRE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Wildlife Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are a residential customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552636mre13eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552636MRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Supporting Taronga & Wildlife","description":"Red will contribute $5 to Taronga Conservation Society Australia for each calendar month you are on the Red Wildlife Saver plan, starting from the date we become responsible for your electricity supply."},{"category":"OTHER","displayName":"Renewable Matching Promise","description":"For every unit of electricity you buy from Red Energy, Snowy Hydro Limited will match it by generating one unit of electricity from a renewable source."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red552141mre12eme-electricity","cdr_plan_id":"RED552141MRE12@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Living Energy Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552141mre12eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552141MRE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red552132mre13eme-electricity","cdr_plan_id":"RED552132MRE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Living Energy Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552132mre13eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552132MRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"red-energy-red552644mre14eme-electricity","cdr_plan_id":"RED552644MRE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Wildlife Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":97,"peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":26.62,"shoulder_cents_per_kwh":20.98,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1308.53,"at_4000_kwh":1626.69,"at_5000_kwh":1944.85,"at_8000_kwh":2899.33},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are a residential customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552644mre14eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552644MRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Supporting Taronga & Wildlife","description":"Red will contribute $5 to Taronga Conservation Society Australia for each calendar month you are on the Red Wildlife Saver plan, starting from the date we become responsible for your electricity supply."},{"category":"OTHER","displayName":"Renewable Matching Promise","description":"For every unit of electricity you buy from Red Energy, Snowy Hydro Limited will match it by generating one unit of electricity from a renewable source."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47.7},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":26.62},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47.7},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":20.98},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":29.3},{"plan_id":"raa-energy-raa1021050mre2eme-electricity","cdr_plan_id":"RAA1021050MRE2@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Solar Standard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":32.27,"supply_charge_cents_per_day":95.45},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1316.49,"at_4000_kwh":1639.19,"at_5000_kwh":1961.89,"at_8000_kwh":2929.99},"marginal_rates":{"excess_unit_cost_cents":32.27,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1021050mre2eme-electricity&source=ai","last_verified":"2025-11-25","source_doc":"CDR EnergyPlanDetailV3 RAA1021050MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":28.8},{"plan_id":"red-energy-red552475mbe12eme-electricity","cdr_plan_id":"RED552475MBE12@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Plus (Seasonal Demand)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":41,"off_peak_cents_per_kwh":20.91,"shoulder_cents_per_kwh":32,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Time of Use Seasonal Demand (CENT/kVA/DAY)","description":"Maximum Demand: maximum interval consumption over relevant bill period occurring anytime; Billable Maximum demand is the greater of: Bill Demand from bills within 365 days from the end date of the current bill; Network's Peak Demand values within 365 days from the end date of the current bill","amount_cents_per_kw":12.98,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1349.15,"at_4000_kwh":1640.7,"at_5000_kwh":1932.25,"at_8000_kwh":2806.9},"marginal_rates":{"excess_unit_cost_cents":41,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552475mbe12eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552475MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 15,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":20.91},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":32},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":41},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":20.91},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":41},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":20.91},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":20.91}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":28.7},{"plan_id":"red-energy-red552134mbe11eme-electricity","cdr_plan_id":"RED552134MBE11@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Business Saver (Seasonal Demand)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":41,"off_peak_cents_per_kwh":20.91,"shoulder_cents_per_kwh":32,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Time of Use Seasonal Demand (CENT/kVA/DAY)","description":"Maximum Demand: maximum interval consumption over relevant bill period occurring anytime; Billable Maximum demand is the greater of: Bill Demand from bills within 365 days from the end date of the current bill; Network's Peak Demand values within 365 days from the end date of the current bill","amount_cents_per_kw":12.98,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1349.15,"at_4000_kwh":1640.7,"at_5000_kwh":1932.25,"at_8000_kwh":2806.9},"marginal_rates":{"excess_unit_cost_cents":41,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552134mbe11eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552134MBE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":20.91},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":32},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":41},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":20.91},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":41},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":20.91},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":20.91}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":28.7},{"plan_id":"red-energy-red552550mbe12eme-electricity","cdr_plan_id":"RED552550MBE12@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Saver (Seasonal Demand)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":41,"off_peak_cents_per_kwh":20.91,"shoulder_cents_per_kwh":32,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Time of Use Seasonal Demand (CENT/kVA/DAY)","description":"Maximum Demand: maximum interval consumption over relevant bill period occurring anytime; Billable Maximum demand is the greater of: Bill Demand from bills within 365 days from the end date of the current bill; Network's Peak Demand values within 365 days from the end date of the current bill","amount_cents_per_kw":12.98,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1349.15,"at_4000_kwh":1640.7,"at_5000_kwh":1932.25,"at_8000_kwh":2806.9},"marginal_rates":{"excess_unit_cost_cents":41,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552550mbe12eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552550MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":20.91},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":32},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":41},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":20.91},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":41},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":20.91},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":20.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":20.91}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":28.7},{"plan_id":"raa-energy-raa1021049mre2eme-electricity","cdr_plan_id":"RAA1021049MRE2@EME","retailer":"RAA Energy","retailer_slug":"raa-energy","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr_raa.png","plan_name":"RAA Member Solar Standard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":32.27,"supply_charge_cents_per_day":95.91},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1318.17,"at_4000_kwh":1640.87,"at_5000_kwh":1963.57,"at_8000_kwh":2931.67},"marginal_rates":{"excess_unit_cost_cents":32.27,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Exclusive for RAA Members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=raa-energy-raa1021049mre2eme-electricity&source=ai","last_verified":"2025-11-25","source_doc":"CDR EnergyPlanDetailV3 RAA1021049MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in: Stepped Rate Feed In Tariff","description":"Solar feed-in tariff (incl. GST, if any). | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"RAA Energy is provided by EL Retail Energy Pty Ltd For more information in relation to RAA Energy and this offer, see our full terms and conditions at raa.com.au/energy-market-retail-contract for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit raa.com.au/energy-help","fees":[{"type":"MEMBERSHIP","amount":"299.4","description":"Access to electricity usage rates without the retail markup with a $24.95/monthly subscription fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Connection fee (GST incl) may apply for move-in requests","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa and Mastercard for payments via our secure payment portal at pay.energy.raa.com.au/card-payment. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":28.7},{"plan_id":"energy-locals-retail-lcl1053788mre1eme-electricity","cdr_plan_id":"LCL1053788MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Home Energy Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":32.73,"supply_charge_cents_per_day":90.91},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"$100 Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Stay on this plan for 6 months, and we'll credit $100 to your account. Terms apply - visit www.energylocalsretail.com.au/terms-and-conditions for full details."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1313.72,"at_4000_kwh":1641.02,"at_5000_kwh":1968.32,"at_8000_kwh":2950.22},"marginal_rates":{"excess_unit_cost_cents":32.73,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1053788mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 LCL1053788MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":28.7},{"plan_id":"tango-tan918718mbe1eme-electricity","cdr_plan_id":"TAN918718MBE1@EME","retailer":"Tango Energy","retailer_slug":"tango","retailer_logo_uri":"https://www.tangoenergy.com/sites/default/files/2022-08/Default-Logo-Tango.png","plan_name":"Business Select","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":119,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":41,"shoulder_cents_per_kwh":48.5,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Winter: 7am-8:59pm sat, sun; 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Summer: 7am-4:59pm sat, sun; 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Winter: 7am-8:59pm mon, tue, wed, thu, fri · Summer: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1340.35,"at_4000_kwh":1642.35,"at_5000_kwh":1944.35,"at_8000_kwh":2850.35},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=tango-tan918718mbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 TAN918718MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Distributor feed-in tariff: Single Rate Solar FiT","description":"Distributor feed-in tariff | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer FIT: Single Rate Solar FiT","description":"Voluntary | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"This contract is ongoing and may be terminated by you or us in accordance with the terms of our Market Agreement. The full terms and conditions applicable to this offer are available at http://tangoenergy.com/terms-and-conditions. For further information about this offer, our market terms or solar feed-in eligibility, call Tango Energy on 1800 010 648.","variation":"Prices are variable and may be varied by notice to you. We will provide you with information about any variations to your prices in accordance with Energy Laws. A network tariff code change may be required if you have a solar system installed.","onExpiryDescription":"Our market agreement is ongoing and may be ended by you or us in accordance with the terms of our agreement.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Usage aggregated according to Australian Eastern Standard Time (AEST). Your usage may be adjusted for local time (Australian Daylight Savings Time). Further information on our charges is available at: http://tangoenergy.com/additional-charges","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"For payments made by MasterCard or Visa where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CC_PROCESSING","amount":"0.0075","description":"For payments made by AMEX or any other payment where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.0075"},{"type":"OTHER","amount":"7.5","description":"This fee will apply if a direct debit, credit card or cheque payment is dishonoured or reversed.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with a basic meter with the power off. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving out and disconnecting with a smart meter or a basic meter. Does not apply to customers switching to another retailer at the same supply address.","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with smart meter or basic meter with the power on. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.3","description":"Paper bill fee $3.30 (inc. GST) for each paper bill.","term":"FIXED"}],"touSchedule":[{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":41},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":48.5},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":41},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":41},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":41}]}]},{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":41},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":48.5},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":41},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":41},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":41}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":28.6},{"plan_id":"energy-locals-retail-lcl1053789mre1eme-electricity","cdr_plan_id":"LCL1053789MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Home Energy Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":32.73,"supply_charge_cents_per_day":95},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"$100 Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Stay on this plan for 6 months, and we'll credit $100 to your account. Terms apply - visit www.energylocalsretail.com.au/terms-and-conditions for full details."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1328.65,"at_4000_kwh":1655.95,"at_5000_kwh":1983.25,"at_8000_kwh":2965.15},"marginal_rates":{"excess_unit_cost_cents":32.73,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1053789mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 LCL1053789MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":28},{"plan_id":"energy-locals-retail-lcl1053787mre1eme-electricity","cdr_plan_id":"LCL1053787MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Home Energy Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":121.36,"peak_cents_per_kwh":38.18,"off_peak_cents_per_kwh":28.64,"shoulder_cents_per_kwh":23.64,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"$100 Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Stay on this plan for 6 months, and we'll credit $100 to your account. Terms apply - visit www.energylocalsretail.com.au/terms-and-conditions for full details."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1358.02,"at_4000_kwh":1663.04,"at_5000_kwh":1968.06,"at_8000_kwh":2883.12},"marginal_rates":{"excess_unit_cost_cents":38.18,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1053787mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 LCL1053787MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.64},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":38.18},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":23.64},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":38.18}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.7},{"plan_id":"powershop-psh1012869mre4eme-electricity","cdr_plan_id":"PSH1012869MRE4@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Switch Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":146.8,"peak_cents_per_kwh":48.9,"off_peak_cents_per_kwh":17.3,"shoulder_cents_per_kwh":24.91,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Conditional Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$200 sign up credit is available to new and moving customers only, and is applied to your bill 180 days after your Powershop online account has become active. We will send you an email letting you know when you're officially a customer."}],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1384.88,"at_4000_kwh":1667.9,"at_5000_kwh":1950.92,"at_8000_kwh":2799.98},"marginal_rates":{"excess_unit_cost_cents":48.9,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are eligible"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1012869mre4eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 PSH1012869MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"We do not issue paper bills and require a credit card or bank details��. For more information in relation to Powershop and this offer, see full terms and conditions at: www.powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":17.3},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.9},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.91},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.9}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.5},{"plan_id":"powershop-psh1012850mre4eme-electricity","cdr_plan_id":"PSH1012850MRE4@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Switch Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":146.8,"peak_cents_per_kwh":48.9,"off_peak_cents_per_kwh":17.3,"shoulder_cents_per_kwh":24.91,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Conditional Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$200 sign up credit is available to new and moving customers only, and is applied to your bill 180 days after your Powershop online account has become active. We will send you an email letting you know when you're officially a customer."}],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1384.88,"at_4000_kwh":1667.9,"at_5000_kwh":1950.92,"at_8000_kwh":2799.98},"marginal_rates":{"excess_unit_cost_cents":48.9,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are eligible"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1012850mre4eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 PSH1012850MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"We do not issue paper bills and require a credit card or bank details��. For more information in relation to Powershop and this offer, see full terms and conditions at: www.powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":17.3},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.9},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.91},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.9}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.5},{"plan_id":"energy-locals-retail-lcl1053791mre1eme-electricity","cdr_plan_id":"LCL1053791MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Home Energy Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":121.82,"peak_cents_per_kwh":38.18,"off_peak_cents_per_kwh":28.64,"shoulder_cents_per_kwh":24.09,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"$100 Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Stay on this plan for 6 months, and we'll credit $100 to your account. Terms apply - visit www.energylocalsretail.com.au/terms-and-conditions for full details."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1362.4,"at_4000_kwh":1668.32,"at_5000_kwh":1974.24,"at_8000_kwh":2892},"marginal_rates":{"excess_unit_cost_cents":38.18,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1053791mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 LCL1053791MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.64},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":38.18},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.09},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":38.18}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.5},{"plan_id":"agl-agl1055713mre1eme-electricity","cdr_plan_id":"AGL1055713MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055713mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055713MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055685mre1eme-electricity","cdr_plan_id":"AGL1055685MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055685mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055685MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"3,000 Velocity Points","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055687mre1eme-electricity","cdr_plan_id":"AGL1055687MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055687mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055687MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"3,000 Velocity Points","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055711mre1eme-electricity","cdr_plan_id":"AGL1055711MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055711mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055711MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055689mre1eme-electricity","cdr_plan_id":"AGL1055689MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055689mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055689MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $50 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $50 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055693mre1eme-electricity","cdr_plan_id":"AGL1055693MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055693mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055693MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $50 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $50 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055691mre1eme-electricity","cdr_plan_id":"AGL1055691MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055691mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055691MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $50 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $50 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055677mre1eme-electricity","cdr_plan_id":"AGL1055677MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055677mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055677MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055683mre1eme-electricity","cdr_plan_id":"AGL1055683MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055683mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055683MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055676mre1eme-electricity","cdr_plan_id":"AGL1055676MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055676mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055676MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055712mre1eme-electricity","cdr_plan_id":"AGL1055712MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055712mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055712MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055681mre1eme-electricity","cdr_plan_id":"AGL1055681MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055681mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055681MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055688mre1eme-electricity","cdr_plan_id":"AGL1055688MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055688mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055688MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"3,000 Velocity Points","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055680mre1eme-electricity","cdr_plan_id":"AGL1055680MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055680mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055680MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055675mre1eme-electricity","cdr_plan_id":"AGL1055675MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055675mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055675MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055636mre1eme-electricity","cdr_plan_id":"AGL1055636MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055636mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055636MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055643mre1eme-electricity","cdr_plan_id":"AGL1055643MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055643mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055643MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055645mre1eme-electricity","cdr_plan_id":"AGL1055645MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055645mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055645MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Sign-Up Velocity Points:20,000","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses. Offer ends on 30/06/26."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055644mre1eme-electricity","cdr_plan_id":"AGL1055644MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055644mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055644MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055649mre1eme-electricity","cdr_plan_id":"AGL1055649MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055649mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055649MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Sign-Up Velocity Points:20,000","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses. Offer ends on 30/06/26."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055654mre1eme-electricity","cdr_plan_id":"AGL1055654MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac New to AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer; New to AGL & Move-in customers"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055654mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055654MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055652mre1eme-electricity","cdr_plan_id":"AGL1055652MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac New to AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer; New to AGL & Move-in customers"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055652mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055652MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055646mre1eme-electricity","cdr_plan_id":"AGL1055646MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055646mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055646MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Sign-Up Velocity Points:20,000","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses. Offer ends on 30/06/26."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055650mre1eme-electricity","cdr_plan_id":"AGL1055650MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac New to AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer; New to AGL & Move-in customers"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055650mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055650MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055638mre1eme-electricity","cdr_plan_id":"AGL1055638MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055638mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055638MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055641mre1eme-electricity","cdr_plan_id":"AGL1055641MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055641mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055641MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl1055635mre1eme-electricity","cdr_plan_id":"AGL1055635MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055635mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055635MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl726436mre31eme-electricity","cdr_plan_id":"AGL726436MRE31@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl726436mre31eme-electricity&source=ai","last_verified":"2026-04-20","source_doc":"CDR EnergyPlanDetailV3 AGL726436MRE31@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Sign-Up Velocity Points:20,000","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses. Offer ends on 30/06/26."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl726435mre31eme-electricity","cdr_plan_id":"AGL726435MRE31@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl726435mre31eme-electricity&source=ai","last_verified":"2026-04-20","source_doc":"CDR EnergyPlanDetailV3 AGL726435MRE31@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Sign-Up Velocity Points:20,000","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses. Offer ends on 30/06/26."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl726433mre31eme-electricity","cdr_plan_id":"AGL726433MRE31@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl726433mre31eme-electricity&source=ai","last_verified":"2026-04-20","source_doc":"CDR EnergyPlanDetailV3 AGL726433MRE31@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Sign-Up Velocity Points:20,000","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses. Offer ends on 30/06/26."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl907798mre8eme-electricity","cdr_plan_id":"AGL907798MRE8@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907798mre8eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907798MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl907794mre6eme-electricity","cdr_plan_id":"AGL907794MRE6@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907794mre6eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907794MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl907767mre7eme-electricity","cdr_plan_id":"AGL907767MRE7@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907767mre7eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907767MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl907769mre7eme-electricity","cdr_plan_id":"AGL907769MRE7@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907769mre7eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907769MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl907780mre6eme-electricity","cdr_plan_id":"AGL907780MRE6@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907780mre6eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907780MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl907786mre6eme-electricity","cdr_plan_id":"AGL907786MRE6@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907786mre6eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907786MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl907785mre8eme-electricity","cdr_plan_id":"AGL907785MRE8@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907785mre8eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907785MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl907790mre8eme-electricity","cdr_plan_id":"AGL907790MRE8@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907790mre8eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907790MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl907772mre7eme-electricity","cdr_plan_id":"AGL907772MRE7@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907772mre7eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907772MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl898821mre7eme-electricity","cdr_plan_id":"AGL898821MRE7@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898821mre7eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898821MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl898820mre7eme-electricity","cdr_plan_id":"AGL898820MRE7@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898820mre7eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898820MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl898818mre7eme-electricity","cdr_plan_id":"AGL898818MRE7@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898818mre7eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898818MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl827772mre10eme-electricity","cdr_plan_id":"AGL827772MRE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl827772mre10eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL827772MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl827774mre10eme-electricity","cdr_plan_id":"AGL827774MRE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl827774mre10eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL827774MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl827771mre10eme-electricity","cdr_plan_id":"AGL827771MRE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl827771mre10eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL827771MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl733558mre21eme-electricity","cdr_plan_id":"AGL733558MRE21@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac New to AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer; New to AGL & Move-in customers"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl733558mre21eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL733558MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl726428mre22eme-electricity","cdr_plan_id":"AGL726428MRE22@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl726428mre22eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL726428MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"3,000 Velocity Points","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl733560mre21eme-electricity","cdr_plan_id":"AGL733560MRE21@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac New to AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer; New to AGL & Move-in customers"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl733560mre21eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL733560MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl733559mre21eme-electricity","cdr_plan_id":"AGL733559MRE21@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac New to AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer; New to AGL & Move-in customers"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl733559mre21eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL733559MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl726429mre22eme-electricity","cdr_plan_id":"AGL726429MRE22@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl726429mre22eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL726429MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"3,000 Velocity Points","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl726430mre22eme-electricity","cdr_plan_id":"AGL726430MRE22@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl726430mre22eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL726430MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"3,000 Velocity Points","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl360631mre36eme-electricity","cdr_plan_id":"AGL360631MRE36@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl360631mre36eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL360631MRE36@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $50 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $50 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"agl-agl360621mre36eme-electricity","cdr_plan_id":"AGL360621MRE36@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":95.04,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1342.87,"at_4000_kwh":1674.86,"at_5000_kwh":2006.85,"at_8000_kwh":3002.82},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl360621mre36eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL360621MRE36@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $50 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $50 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27.2},{"plan_id":"energy-locals-retail-lcl1042408mre1eme-electricity","cdr_plan_id":"LCL1042408MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Local Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":115.45,"peak_cents_per_kwh":50.45,"off_peak_cents_per_kwh":21.36,"shoulder_cents_per_kwh":28.18,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1364.92,"at_4000_kwh":1679.43,"at_5000_kwh":1993.94,"at_8000_kwh":2937.47},"marginal_rates":{"excess_unit_cost_cents":50.45,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1042408mre1eme-electricity&source=ai","last_verified":"2026-03-20","source_doc":"CDR EnergyPlanDetailV3 LCL1042408MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"257.88","description":"Access wholesale energy rates with a $21.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":28.18},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":21.36},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":28.18},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.45},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":28.18}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27},{"plan_id":"energy-locals-retail-lcl1042415mre1eme-electricity","cdr_plan_id":"LCL1042415MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Online Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":115.45,"peak_cents_per_kwh":50.45,"off_peak_cents_per_kwh":21.36,"shoulder_cents_per_kwh":28.18,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1364.92,"at_4000_kwh":1679.43,"at_5000_kwh":1993.94,"at_8000_kwh":2937.47},"marginal_rates":{"excess_unit_cost_cents":50.45,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1042415mre1eme-electricity&source=ai","last_verified":"2026-03-20","source_doc":"CDR EnergyPlanDetailV3 LCL1042415MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"197.88","description":"Access wholesale energy rates with a $16.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX payments via energylocalsretail.com.au/pay-by-card. Debit card transactions are subject to a 0.46% fee, and credit card payments incur a 0.81% fee. Card processing fees are waived for Direct Debit payments.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":28.18},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":21.36},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":28.18},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.45},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":28.18}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27},{"plan_id":"energy-locals-retail-lcl986580mre1eme-electricity","cdr_plan_id":"LCL986580MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Online Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":115.45,"peak_cents_per_kwh":50.45,"off_peak_cents_per_kwh":21.36,"shoulder_cents_per_kwh":28.18,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1364.92,"at_4000_kwh":1679.43,"at_5000_kwh":1993.94,"at_8000_kwh":2937.47},"marginal_rates":{"excess_unit_cost_cents":50.45,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986580mre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986580MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"197.88","description":"Access wholesale energy rates with a $16.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":28.18},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":21.36},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":28.18},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.45},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":28.18}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27},{"plan_id":"energy-locals-retail-lcl986579mre1eme-electricity","cdr_plan_id":"LCL986579MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Local Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":115.45,"peak_cents_per_kwh":50.45,"off_peak_cents_per_kwh":21.36,"shoulder_cents_per_kwh":28.18,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1364.92,"at_4000_kwh":1679.43,"at_5000_kwh":1993.94,"at_8000_kwh":2937.47},"marginal_rates":{"excess_unit_cost_cents":50.45,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986579mre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986579MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"257.88","description":"Access wholesale energy rates with a $21.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":28.18},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":21.36},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":28.18},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.45},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":28.18}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":27},{"plan_id":"origin-ori848790mre8eme-electricity","cdr_plan_id":"ORI848790MRE8@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable ePlus - One Big Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":93.9,"peak_cents_per_kwh":48.26,"off_peak_cents_per_kwh":28.51,"shoulder_cents_per_kwh":23.81,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1347.59,"at_4000_kwh":1682.54,"at_5000_kwh":2017.49,"at_8000_kwh":3022.34},"marginal_rates":{"excess_unit_cost_cents":48.26,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Efulfillment"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori848790mre8eme-electricity&source=ai","last_verified":"2026-02-13","source_doc":"CDR EnergyPlanDetailV3 ORI848790MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.51},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.26},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":23.81},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.26}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.9},{"plan_id":"origin-ori848791mre8eme-electricity","cdr_plan_id":"ORI848791MRE8@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable ePlus - One Big Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":93.9,"peak_cents_per_kwh":48.26,"off_peak_cents_per_kwh":28.51,"shoulder_cents_per_kwh":23.81,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1347.59,"at_4000_kwh":1682.54,"at_5000_kwh":2017.49,"at_8000_kwh":3022.34},"marginal_rates":{"excess_unit_cost_cents":48.26,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Efulfillment"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori848791mre8eme-electricity&source=ai","last_verified":"2026-02-13","source_doc":"CDR EnergyPlanDetailV3 ORI848791MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.51},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.26},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":23.81},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.26}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.9},{"plan_id":"energy-locals-retail-lcl986576mbe1eme-electricity","cdr_plan_id":"LCL986576MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":235.45,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":27.73,"shoulder_cents_per_kwh":34.09,"peak_hours":"Summer Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Winter Off Peak: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Summer Peak: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-4:59pm sat, sun","shoulder_hours":"Winter Off Peak: 7am-8:59pm mon, tue, wed, thu, fri · Summer Peak: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Anytime Demand","description":"Demand Charge  All kVA (c/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.64,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":4,"season_end_month":10,"season_label":"Winter Off Peak"},{"display_name":"Anytime Demand","description":"Demand Charge  All kVA (c/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.64,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":11,"season_end_month":3,"season_label":"Summer Peak"}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1479.88,"at_4000_kwh":1686.71,"at_5000_kwh":1893.54,"at_8000_kwh":2514.03},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986576mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986576MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"Winter Off Peak (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.73},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":34.09},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.73}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.73}]}]},{"season":"Summer Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.73},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":34.09},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":40},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.73}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":27.73},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":40},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.7},{"plan_id":"agl-agl1055719mre1eme-electricity","cdr_plan_id":"AGL1055719MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - 3rd Party No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055719mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055719MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl1055718mre1eme-electricity","cdr_plan_id":"AGL1055718MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - 3rd Party No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055718mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055718MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl1055717mre1eme-electricity","cdr_plan_id":"AGL1055717MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - 3rd Party No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055717mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055717MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl1055664mre1eme-electricity","cdr_plan_id":"AGL1055664MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; New AGL Customers (only); Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055664mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055664MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl1055702mre1eme-electricity","cdr_plan_id":"AGL1055702MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055702mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055702MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl1055703mre1eme-electricity","cdr_plan_id":"AGL1055703MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055703mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055703MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl1055701mre1eme-electricity","cdr_plan_id":"AGL1055701MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055701mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055701MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl1055663mre1eme-electricity","cdr_plan_id":"AGL1055663MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; New AGL Customers (only); Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055663mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055663MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl1055661mre1eme-electricity","cdr_plan_id":"AGL1055661MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; New AGL Customers (only); Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055661mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055661MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl898842mre9eme-electricity","cdr_plan_id":"AGL898842MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; New AGL Customers (only); Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898842mre9eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898842MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl898841mre9eme-electricity","cdr_plan_id":"AGL898841MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; New AGL Customers (only); Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898841mre9eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898841MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl898840mre9eme-electricity","cdr_plan_id":"AGL898840MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; New AGL Customers (only); Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898840mre9eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898840MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl840897mre11eme-electricity","cdr_plan_id":"AGL840897MRE11@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - 3rd Party No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl840897mre11eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL840897MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl840896mre11eme-electricity","cdr_plan_id":"AGL840896MRE11@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - 3rd Party No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl840896mre11eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL840896MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl840895mre11eme-electricity","cdr_plan_id":"AGL840895MRE11@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - 3rd Party No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl840895mre11eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL840895MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl686235mre23eme-electricity","cdr_plan_id":"AGL686235MRE23@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl686235mre23eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL686235MRE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl686237mre23eme-electricity","cdr_plan_id":"AGL686237MRE23@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl686237mre23eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL686237MRE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"agl-agl686236mre23eme-electricity","cdr_plan_id":"AGL686236MRE23@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":102.26,"peak_cents_per_kwh":46.31,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":21.28,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1369.22,"at_4000_kwh":1701.21,"at_5000_kwh":2033.2,"at_8000_kwh":3029.17},"marginal_rates":{"excess_unit_cost_cents":46.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl686236mre23eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL686236MRE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.31},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.31},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.28},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori1054221mre1eme-electricity","cdr_plan_id":"ORI1054221MRE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Variable - New and Moving Customers only","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New and Moving Customers Only; Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1054221mre1eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 ORI1054221MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"One credit per electricity account. If this Origin Go Variable electricity plan is still active with the customer on 30 June 2026, $100 (Incl. GST) credit will be applied to the customer's electricity account after that date. If the customer ends this Origin Go Variable electricity plan before that date, the customer will not receive any credit. Credit is not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori1054200mre1eme-electricity","cdr_plan_id":"ORI1054200MRE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Variable - New and Moving Customers only","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New and Moving Customers Only; Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1054200mre1eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 ORI1054200MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"One credit per electricity account. If this Origin Go Variable electricity plan is still active with the customer on 30 June 2026, $100 (Incl. GST) credit will be applied to the customer's electricity account after that date. If the customer ends this Origin Go Variable electricity plan before that date, the customer will not receive any credit. Credit is not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori733587mre13eme-electricity","cdr_plan_id":"ORI733587MRE13@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Compare Club","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori733587mre13eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 ORI733587MRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori733574mre13eme-electricity","cdr_plan_id":"ORI733574MRE13@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Compare Club","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori733574mre13eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 ORI733574MRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori909006mre6eme-electricity","cdr_plan_id":"ORI909006MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - One Click Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori909006mre6eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI909006MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori909003mre6eme-electricity","cdr_plan_id":"ORI909003MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - One Click Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori909003mre6eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI909003MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori997828mre3eme-electricity","cdr_plan_id":"ORI997828MRE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Residential Connections","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori997828mre3eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI997828MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori997831mre3eme-electricity","cdr_plan_id":"ORI997831MRE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Residential Connections","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori997831mre3eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI997831MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori724759mre11eme-electricity","cdr_plan_id":"ORI724759MRE11@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - My Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori724759mre11eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI724759MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori724758mre11eme-electricity","cdr_plan_id":"ORI724758MRE11@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - My Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori724758mre11eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI724758MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori539481mre21eme-electricity","cdr_plan_id":"ORI539481MRE21@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - iSelect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539481mre21eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539481MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori539412mre22eme-electricity","cdr_plan_id":"ORI539412MRE22@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Go Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539412mre22eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539412MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori539374mre22eme-electricity","cdr_plan_id":"ORI539374MRE22@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Go Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539374mre22eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539374MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori539168mre21eme-electricity","cdr_plan_id":"ORI539168MRE21@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Compare the Market","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539168mre21eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539168MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori539290mre22eme-electricity","cdr_plan_id":"ORI539290MRE22@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539290mre22eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539290MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori539473mre21eme-electricity","cdr_plan_id":"ORI539473MRE21@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - iSelect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539473mre21eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539473MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori539303mre22eme-electricity","cdr_plan_id":"ORI539303MRE22@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539303mre22eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539303MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori539136mre21eme-electricity","cdr_plan_id":"ORI539136MRE21@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Compare the Market","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539136mre21eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539136MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori1020035mre2eme-electricity","cdr_plan_id":"ORI1020035MRE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Comparable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020035mre2eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI1020035MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori1020066mre2eme-electricity","cdr_plan_id":"ORI1020066MRE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Comparable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020066mre2eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI1020066MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori1002464mre2eme-electricity","cdr_plan_id":"ORI1002464MRE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1002464mre2eme-electricity&source=ai","last_verified":"2025-10-15","source_doc":"CDR EnergyPlanDetailV3 ORI1002464MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"origin-ori1002467mre2eme-electricity","cdr_plan_id":"ORI1002467MRE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.95,"peak_cents_per_kwh":48.81,"off_peak_cents_per_kwh":28.83,"shoulder_cents_per_kwh":24.08,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1362.79,"at_4000_kwh":1701.53,"at_5000_kwh":2040.27,"at_8000_kwh":3056.49},"marginal_rates":{"excess_unit_cost_cents":48.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1002467mre2eme-electricity&source=ai","last_verified":"2025-10-15","source_doc":"CDR EnergyPlanDetailV3 ORI1002467MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.83},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.81},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":24.08},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":48.81}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":26.1},{"plan_id":"alinta-ali1008595mre3eme-electricity","cdr_plan_id":"ALI1008595MRE3@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Advantage - Time of Use (Interval)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":111.74,"peak_cents_per_kwh":48.64,"off_peak_cents_per_kwh":27.1,"shoulder_cents_per_kwh":22.3,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1385.91,"at_4000_kwh":1711.93,"at_5000_kwh":2037.95,"at_8000_kwh":3016.01},"marginal_rates":{"excess_unit_cost_cents":48.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1008595mre3eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 ALI1008595MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":48.64},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":27.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.64},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.3},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":48.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25.6},{"plan_id":"alinta-ali1008596mre3eme-electricity","cdr_plan_id":"ALI1008596MRE3@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Advantage - Time of Use (Interval) + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":111.74,"peak_cents_per_kwh":48.64,"off_peak_cents_per_kwh":27.1,"shoulder_cents_per_kwh":22.3,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1385.91,"at_4000_kwh":1711.93,"at_5000_kwh":2037.95,"at_8000_kwh":3016.01},"marginal_rates":{"excess_unit_cost_cents":48.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1008596mre3eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 ALI1008596MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":48.64},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":27.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.64},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.3},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":48.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25.6},{"plan_id":"lumo-energy-sa-lum145166sre14eme-electricity","cdr_plan_id":"LUM145166SRE14@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":108.75,"peak_cents_per_kwh":49.85,"off_peak_cents_per_kwh":27.47,"shoulder_cents_per_kwh":21.65,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1387.54,"at_4000_kwh":1717.74,"at_5000_kwh":2047.94,"at_8000_kwh":3038.54},"marginal_rates":{"excess_unit_cost_cents":49.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum145166sre14eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM145166SRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.85},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":27.47},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.85},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.65},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.85}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25.3},{"plan_id":"lumo-energy-sa-lum145168sre14eme-electricity","cdr_plan_id":"LUM145168SRE14@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":108.75,"peak_cents_per_kwh":49.85,"off_peak_cents_per_kwh":27.47,"shoulder_cents_per_kwh":21.65,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1387.54,"at_4000_kwh":1717.74,"at_5000_kwh":2047.94,"at_8000_kwh":3038.54},"marginal_rates":{"excess_unit_cost_cents":49.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum145168sre14eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM145168SRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.85},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":27.47},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.85},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.65},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.85}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25.3},{"plan_id":"red-energy-red145172sre13eme-electricity","cdr_plan_id":"RED145172SRE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":108.75,"peak_cents_per_kwh":49.85,"off_peak_cents_per_kwh":27.47,"shoulder_cents_per_kwh":21.65,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1387.54,"at_4000_kwh":1717.74,"at_5000_kwh":2047.94,"at_8000_kwh":3038.54},"marginal_rates":{"excess_unit_cost_cents":49.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red145172sre13eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED145172SRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.85},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":27.47},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.85},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.65},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.85}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25.3},{"plan_id":"red-energy-red145170sre12eme-electricity","cdr_plan_id":"RED145170SRE12@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":108.75,"peak_cents_per_kwh":49.85,"off_peak_cents_per_kwh":27.47,"shoulder_cents_per_kwh":21.65,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1387.54,"at_4000_kwh":1717.74,"at_5000_kwh":2047.94,"at_8000_kwh":3038.54},"marginal_rates":{"excess_unit_cost_cents":49.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red145170sre12eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED145170SRE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.85},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":27.47},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.85},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":21.65},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.85}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25.3},{"plan_id":"energy-locals-retail-lcl986575mbe1eme-electricity","cdr_plan_id":"LCL986575MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Member - Bonus Credit","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":123.18,"peak_cents_per_kwh":39.09,"off_peak_cents_per_kwh":28.64,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Sign Up Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$175 credit is available for new customers only, and is applied if your electricity supply remains with us for 6 months."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1402.86,"at_4000_kwh":1720.61,"at_5000_kwh":2038.36,"at_8000_kwh":2991.61},"marginal_rates":{"excess_unit_cost_cents":39.09,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986575mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986575MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"389.88","description":"Access wholesale energy rates with a $32.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":28.64},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":39.09},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":28.64}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":28.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25.2},{"plan_id":"flow-power-fp11041989mre1eme-electricity","cdr_plan_id":"FP11041989MRE1@EME","retailer":"Flow Power","retailer_slug":"flow-power","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/a2e3b81a479f4c3ea9434600700a3b67.png","plan_name":"FH Battery + Solar+ EV: Variable Prices (estimate)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":139.76,"peak_cents_per_kwh":30.3,"off_peak_cents_per_kwh":30.3,"shoulder_cents_per_kwh":30.3,"peak_hours":"3pm-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1419.12,"at_4000_kwh":1722.12,"at_5000_kwh":2025.12,"at_8000_kwh":2934.12},"marginal_rates":{"excess_unit_cost_cents":30.3,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Customer must own an EV"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flow-power-fp11041989mre1eme-electricity&source=ai","last_verified":"2026-03-18","source_doc":"CDR EnergyPlanDetailV3 FP11041989MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Peak FiT","description":"Flow Power offers 45 cents per kWh exported between 5:30PM to 7:30PM and 0 cents per kWh exported all other times. All amounts are GST-inclusive.","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":45,"hours":"5:30pm-7:29pm","startHour":17.5,"endHour":19.483333333333334}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Off-Peak FiT","description":"Flow Power offers 45 cents per kWh exported between 5:30PM to 7:30PM and 0 cents per kWh exported all other times. All amounts are GST-inclusive.","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"7:30pm-5:29pm","startHour":19.5,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"7:30pm-5:29pm","startHour":0,"endHour":17.483333333333334}]}],"terms":"See Flow Power Market Retail Contract Agreement Terms at flowpower.com.au/residential/policies/","variation":"Usage rates are not fixed and reflect an optimised rate that Flow Power estimates can be achieved if pricing signals provided by the Flow Power App are followed. Actual rates will vary depending on your pattern of consumption compared to the market price assessed every 5 minutes via our Price Efficiency Adjustment. For more information about our pricing visit flowpower.com.au/residential/pricing/our-pricing","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"Additional fees may apply. For more information, please visit the retailer's website at flowpower.com.au/residential/policies/","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection fee","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Disconnection fee","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0066","description":"Payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0066"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"PERCENT_OF_USE","description":"This offer has 100% green power included in the offer rates.","tiers":[{"percentGreen":100,"amount":"0"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":30.3},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.3},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":30.3},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.3},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":30.3}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25.2},{"plan_id":"momentum-mom919907mre3eme-electricity","cdr_plan_id":"MOM919907MRE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Home Run Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":154.6,"peak_cents_per_kwh":36.4,"off_peak_cents_per_kwh":24.7,"shoulder_cents_per_kwh":28.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1433.39,"at_4000_kwh":1723.09,"at_5000_kwh":2012.79,"at_8000_kwh":2881.89},"marginal_rates":{"excess_unit_cost_cents":36.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919907mre3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919907MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, pay by direct debit, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from https://www.momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":28.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.4},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":24.7},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25.1},{"plan_id":"momentum-mom919718mre3eme-electricity","cdr_plan_id":"MOM919718MRE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Warm Welcome","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":154.6,"peak_cents_per_kwh":36.4,"off_peak_cents_per_kwh":24.7,"shoulder_cents_per_kwh":28.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1433.39,"at_4000_kwh":1723.09,"at_5000_kwh":2012.79,"at_8000_kwh":2881.89},"marginal_rates":{"excess_unit_cost_cents":36.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919718mre3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919718MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. This plan is only available to residential customers who sign up a new supply address, agree to direct debit, eCommunications and eBilling and have the necessary metering system configuration. Full T&Cs can be obtained from https://www.momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"$50 Welcome credit (GST incl)","description":"A one-off $50 (GST incl) sign-up credit will be applied to your first electricity bill. This credit cannot be redeemed for cash or transferred to another supply address."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":28.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":36.4},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":24.7},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":36.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25.1},{"plan_id":"kogan-kog919223mre2eme-electricity","cdr_plan_id":"KOG919223MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":160,"peak_cents_per_kwh":38.5,"off_peak_cents_per_kwh":22,"shoulder_cents_per_kwh":30,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1440.5,"at_4000_kwh":1726,"at_5000_kwh":2011.5,"at_8000_kwh":2868},"marginal_rates":{"excess_unit_cost_cents":38.5,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog919223mre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 KOG919223MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":22},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":38.5},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":30},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":38.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25},{"plan_id":"kogan-kog919197mre2eme-electricity","cdr_plan_id":"KOG919197MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":160,"peak_cents_per_kwh":38.5,"off_peak_cents_per_kwh":22,"shoulder_cents_per_kwh":30,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1440.5,"at_4000_kwh":1726,"at_5000_kwh":2011.5,"at_8000_kwh":2868},"marginal_rates":{"excess_unit_cost_cents":38.5,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog919197mre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 KOG919197MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":22},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":38.5},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":30},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":38.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25},{"plan_id":"powershop-psh925630sre2eme-electricity","cdr_plan_id":"PSH925630SRE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":160,"peak_cents_per_kwh":38.5,"off_peak_cents_per_kwh":22,"shoulder_cents_per_kwh":30,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1440.5,"at_4000_kwh":1726,"at_5000_kwh":2011.5,"at_8000_kwh":2868},"marginal_rates":{"excess_unit_cost_cents":38.5,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925630sre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925630SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"This offer is available to customers within the SA Power Networks distribution zone with the applicable network tariff and meter configuration, and where Powershop is the retailer responsible for electricity supplied at the premises. We require a credit card or bank details. For further information in relation to Powershop and this offer - see our full terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We?ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":22},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":38.5},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":30},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":38.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25},{"plan_id":"powershop-psh925611sre2eme-electricity","cdr_plan_id":"PSH925611SRE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":160,"peak_cents_per_kwh":38.5,"off_peak_cents_per_kwh":22,"shoulder_cents_per_kwh":30,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1440.5,"at_4000_kwh":1726,"at_5000_kwh":2011.5,"at_8000_kwh":2868},"marginal_rates":{"excess_unit_cost_cents":38.5,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925611sre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925611SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"This offer is available to customers within the SA Power Networks distribution zone with the applicable network tariff and meter configuration, and where Powershop is the retailer responsible for electricity supplied at the premises. We require a credit card or bank details. For further information in relation to Powershop and this offer - see our full terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We?ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":22},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":38.5},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":30},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":38.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":25},{"plan_id":"red-energy-red552852mre15eme-electricity","cdr_plan_id":"RED552852MRE15@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red EV Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97,"free_window_start":"12:00","free_window_end":"14:00","free_window_fraction":0.12,"original_tariff_type":"flat","peak_cents_per_kwh":39.03,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"12pm–2pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1384.44,"at_4000_kwh":1727.91,"at_5000_kwh":2071.37,"at_8000_kwh":3101.76},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Online or phone sign up; You own an electric vehicle"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552852mre15eme-electricity&source=ai","last_verified":"2025-12-16","source_doc":"CDR EnergyPlanDetailV3 RED552852MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"Red Energy may withdraw this offer at any time. This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free Electricity Use Period","description":"Between 12pm and 2pm Saturday and Sunday, your electricity usage charges will be waived for any electricity consumed at your Supply Address. Excludes Service to Property charges and GreenPower charges (if applicable)."},{"category":"OTHER","displayName":"Renewable Matching Promise","description":"For every unit of electricity you buy from Red Energy, Snowy Hydro Limited will match it by generating one unit of electricity from a renewable source."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":12,"rateCents":39.03},{"type":"OFF_PEAK","startHour":12,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":39.03}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.9},{"plan_id":"red-energy-red552858mre16eme-electricity","cdr_plan_id":"RED552858MRE16@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red EV Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97,"free_window_start":"12:00","free_window_end":"14:00","free_window_fraction":0.12,"original_tariff_type":"flat","peak_cents_per_kwh":39.03,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"12pm–2pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1384.44,"at_4000_kwh":1727.91,"at_5000_kwh":2071.37,"at_8000_kwh":3101.76},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Online or phone sign up; You own an electric vehicle"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552858mre16eme-electricity&source=ai","last_verified":"2025-12-16","source_doc":"CDR EnergyPlanDetailV3 RED552858MRE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"Red Energy may withdraw this offer at any time. This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free Electricity Use Period","description":"Between 12pm and 2pm Saturday and Sunday, your electricity usage charges will be waived for any electricity consumed at your Supply Address. Excludes Service to Property charges and GreenPower charges (if applicable)."},{"category":"OTHER","displayName":"Renewable Matching Promise","description":"For every unit of electricity you buy from Red Energy, Snowy Hydro Limited will match it by generating one unit of electricity from a renewable source."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":12,"rateCents":39.03},{"type":"OFF_PEAK","startHour":12,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":39.03}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.9},{"plan_id":"energy-locals-retail-lcl986573mbe1eme-electricity","cdr_plan_id":"LCL986573MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Member - Bonus Credit","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":123.18,"peak_cents_per_kwh":39.09,"off_peak_cents_per_kwh":29.09,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Sign Up Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$175 credit is available for new customers only, and is applied if your electricity supply remains with us for 6 months."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1412.31,"at_4000_kwh":1733.21,"at_5000_kwh":2054.11,"at_8000_kwh":3016.81},"marginal_rates":{"excess_unit_cost_cents":39.09,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986573mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986573MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"389.88","description":"Access wholesale energy rates with a $32.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.09},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":39.09},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.09}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.7},{"plan_id":"tango-tan918724mre1eme-electricity","cdr_plan_id":"TAN918724MRE1@EME","retailer":"Tango Energy","retailer_slug":"tango","retailer_logo_uri":"https://www.tangoenergy.com/sites/default/files/2022-08/Default-Logo-Tango.png","plan_name":"Home Select","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":99,"peak_cents_per_kwh":46.65,"off_peak_cents_per_kwh":26.7,"shoulder_cents_per_kwh":35.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1394.7,"at_4000_kwh":1739.15,"at_5000_kwh":2083.6,"at_8000_kwh":3116.95},"marginal_rates":{"excess_unit_cost_cents":46.65,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=tango-tan918724mre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 TAN918724MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Distributor feed-in tariff: Single Rate Solar FiT","description":"Distributor feed-in tariff | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer FIT: Single Rate Solar FiT","description":"Voluntary | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"This contract is ongoing and may be terminated by you or us in accordance with the terms of our Market Agreement. The full terms and conditions applicable to this offer are available at http://tangoenergy.com/terms-and-conditions. For further information about this offer, our market terms or solar feed-in eligibility, call Tango Energy on 1800 010 648.","variation":"Prices are variable and may be varied by notice to you. We will provide you with information about any variations to your prices in accordance with Energy Laws. A network tariff change may be required if you have a solar system installed.","onExpiryDescription":"Our market agreement is ongoing and may be ended by you or us in accordance with the terms of our agreement.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Usage aggregated according to Australian Eastern Standard Time (AEST). Your usage may be adjusted for local time (Australian Daylight Savings Time). Further information on our charges is available at: http://tangoenergy.com/additional-charges","fees":[{"type":"PAYMENT_PROCESSING","amount":"0.006","description":"For payments made by MasterCard or Visa where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"OTHER","amount":"0.0075","description":"For payments made by AMEX or any other payment where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.0075"},{"type":"OTHER","amount":"7.5","description":"This fee will apply if a direct debit, credit card or cheque payment is dishonoured or reversed.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with a basic meter with the power off. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving out and disconnecting with a smart meter or a basic meter. Does not apply to customers switching to another retailer at the same supply address.","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with smart meter or basic meter with the power on. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.3","description":"Paper bill fee $3.30 (inc. GST) for each paper bill.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.65},{"type":"SHOULDER","startHour":1,"endHour":6,"rateCents":35.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.65},{"type":"OFF_PEAK","startHour":10,"endHour":15,"rateCents":26.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.65}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.4},{"plan_id":"tango-tan918723mre1eme-electricity","cdr_plan_id":"TAN918723MRE1@EME","retailer":"Tango Energy","retailer_slug":"tango","retailer_logo_uri":"https://www.tangoenergy.com/sites/default/files/2022-08/Default-Logo-Tango.png","plan_name":"Home Select","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":99,"peak_cents_per_kwh":46.65,"off_peak_cents_per_kwh":26.7,"shoulder_cents_per_kwh":35.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1394.7,"at_4000_kwh":1739.15,"at_5000_kwh":2083.6,"at_8000_kwh":3116.95},"marginal_rates":{"excess_unit_cost_cents":46.65,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=tango-tan918723mre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 TAN918723MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Distributor feed-in tariff: Single Rate Solar FiT","description":"Distributor feed-in tariff | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer FIT: Single Rate Solar FiT","description":"Voluntary | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"This contract is ongoing and may be terminated by you or us in accordance with the terms of our Market Agreement. The full terms and conditions applicable to this offer are available at http://tangoenergy.com/terms-and-conditions. For further information about this offer, our market terms or solar feed-in eligibility, call Tango Energy on 1800 010 648.","variation":"Prices are variable and may be varied by notice to you. We will provide you with information about any variations to your prices in accordance with Energy Laws. A network tariff change may be required if you have a solar system installed.","onExpiryDescription":"Our market agreement is ongoing and may be ended by you or us in accordance with the terms of our agreement.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Usage aggregated according to Australian Eastern Standard Time (AEST). Your usage may be adjusted for local time (Australian Daylight Savings Time). Further information on our charges is available at: http://tangoenergy.com/additional-charges","fees":[{"type":"PAYMENT_PROCESSING","amount":"0.006","description":"For payments made by MasterCard or Visa where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"OTHER","amount":"0.0075","description":"For payments made by AMEX or any other payment where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.0075"},{"type":"OTHER","amount":"7.5","description":"This fee will apply if a direct debit, credit card or cheque payment is dishonoured or reversed.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with a basic meter with the power off. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving out and disconnecting with a smart meter or a basic meter. Does not apply to customers switching to another retailer at the same supply address.","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with smart meter or basic meter with the power on. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.3","description":"Paper bill fee $3.30 (inc. GST) for each paper bill.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":46.65},{"type":"SHOULDER","startHour":1,"endHour":6,"rateCents":35.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.65},{"type":"OFF_PEAK","startHour":10,"endHour":15,"rateCents":26.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":46.65}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.4},{"plan_id":"kogan-kog1051338mre2eme-electricity","cdr_plan_id":"KOG1051338MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy for current FIRST members","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":34.37,"supply_charge_cents_per_day":101.03},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1399.86,"at_4000_kwh":1743.56,"at_5000_kwh":2087.26,"at_8000_kwh":3118.36},"marginal_rates":{"excess_unit_cost_cents":34.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051338mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051338MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.2},{"plan_id":"kogan-kog1051270mre2eme-electricity","cdr_plan_id":"KOG1051270MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy with free FIRST","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":34.37,"supply_charge_cents_per_day":101.03},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1399.86,"at_4000_kwh":1743.56,"at_5000_kwh":2087.26,"at_8000_kwh":3118.36},"marginal_rates":{"excess_unit_cost_cents":34.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051270mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051270MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.2},{"plan_id":"kogan-kog1051336mre2eme-electricity","cdr_plan_id":"KOG1051336MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy for current FIRST members","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":34.37,"supply_charge_cents_per_day":101.03},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1399.86,"at_4000_kwh":1743.56,"at_5000_kwh":2087.26,"at_8000_kwh":3118.36},"marginal_rates":{"excess_unit_cost_cents":34.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051336mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051336MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.2},{"plan_id":"kogan-kog1051337mre2eme-electricity","cdr_plan_id":"KOG1051337MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy with free FIRST","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":34.37,"supply_charge_cents_per_day":101.03},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1399.86,"at_4000_kwh":1743.56,"at_5000_kwh":2087.26,"at_8000_kwh":3118.36},"marginal_rates":{"excess_unit_cost_cents":34.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051337mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051337MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.2},{"plan_id":"powershop-psh1051101mre1eme-electricity","cdr_plan_id":"PSH1051101MRE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power House","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":34.37,"supply_charge_cents_per_day":101.03},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1399.86,"at_4000_kwh":1743.56,"at_5000_kwh":2087.26,"at_8000_kwh":3118.36},"marginal_rates":{"excess_unit_cost_cents":34.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1051101mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 PSH1051101MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to Powershop automatically debiting your preferred payment method for any outstanding amounts due. Further information in relation to this offer, see our terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.2},{"plan_id":"powershop-psh1051082mre1eme-electricity","cdr_plan_id":"PSH1051082MRE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power House","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":34.37,"supply_charge_cents_per_day":101.03},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1399.86,"at_4000_kwh":1743.56,"at_5000_kwh":2087.26,"at_8000_kwh":3118.36},"marginal_rates":{"excess_unit_cost_cents":34.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1051082mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 PSH1051082MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to Powershop automatically debiting your preferred payment method for any outstanding amounts due. Further information in relation to this offer, see our terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.2},{"plan_id":"flow-power-fp11039497mre1eme-electricity","cdr_plan_id":"FP11039497MRE1@EME","retailer":"Flow Power","retailer_slug":"flow-power","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/a2e3b81a479f4c3ea9434600700a3b67.png","plan_name":"Flow Home Battery + Solar: Variable Prices (estimate)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":139.76,"peak_cents_per_kwh":30.87,"off_peak_cents_per_kwh":30.87,"shoulder_cents_per_kwh":30.87,"peak_hours":"3pm-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1436.22,"at_4000_kwh":1744.92,"at_5000_kwh":2053.62,"at_8000_kwh":2979.72},"marginal_rates":{"excess_unit_cost_cents":30.87,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flow-power-fp11039497mre1eme-electricity&source=ai","last_verified":"2026-03-04","source_doc":"CDR EnergyPlanDetailV3 FP11039497MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Peak FiT","description":"Flow Power offers 45 cents per kWh exported between 5:30PM to 7:30PM and 0 cents per kWh exported all other times. All amounts are GST-inclusive.","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":45,"hours":"5:30pm-7:29pm","startHour":17.5,"endHour":19.483333333333334}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Off-Peak FiT","description":"Flow Power offers 45 cents per kWh exported between 5:30PM to 7:30PM and 0 cents per kWh exported all other times. All amounts are GST-inclusive.","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"7:30pm-5:29pm","startHour":19.5,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"7:30pm-5:29pm","startHour":0,"endHour":17.483333333333334}]}],"terms":"See Flow Power Market Retail Contract Agreement Terms at flowpower.com.au/residential/policies/","variation":"Usage rates are not fixed and reflect an optimised rate that Flow Power estimates can be achieved if pricing signals provided by the Flow Power App are followed. Actual rates will vary depending on your pattern of consumption compared to the market price assessed every 5 minutes via our Price Efficiency Adjustment. For more information about our pricing visit flowpower.com.au/residential/pricing/our-pricing","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"Additional fees may apply. For more information, please visit the retailer's website at flowpower.com.au/residential/policies/","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection fee","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Disconnection fee","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0066","description":"Payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0066"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"PERCENT_OF_USE","description":"This offer has 100% green power included in the offer rates.","tiers":[{"percentGreen":100,"amount":"0"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":30.87},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.87},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":30.87},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.87},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":30.87}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24.2},{"plan_id":"energy-locals-retail-lcl986549mre1eme-electricity","cdr_plan_id":"LCL986549MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Online Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":33.18,"supply_charge_cents_per_day":115.45},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1416.79,"at_4000_kwh":1748.59,"at_5000_kwh":2080.39,"at_8000_kwh":3075.79},"marginal_rates":{"excess_unit_cost_cents":33.18,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986549mre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986549MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"197.88","description":"Access wholesale energy rates with a $16.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24},{"plan_id":"energy-locals-retail-lcl986547mre1eme-electricity","cdr_plan_id":"LCL986547MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Local Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":33.18,"supply_charge_cents_per_day":115.45},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1416.79,"at_4000_kwh":1748.59,"at_5000_kwh":2080.39,"at_8000_kwh":3075.79},"marginal_rates":{"excess_unit_cost_cents":33.18,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986547mre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986547MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"257.88","description":"Access wholesale energy rates with a $21.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24},{"plan_id":"energy-locals-retail-lcl986539mre1eme-electricity","cdr_plan_id":"LCL986539MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Local Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":33.18,"supply_charge_cents_per_day":115.45},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1416.79,"at_4000_kwh":1748.59,"at_5000_kwh":2080.39,"at_8000_kwh":3075.79},"marginal_rates":{"excess_unit_cost_cents":33.18,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986539mre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986539MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"257.88","description":"Access wholesale energy rates with a $21.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24},{"plan_id":"energy-locals-retail-lcl986540mre1eme-electricity","cdr_plan_id":"LCL986540MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Online Member","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":33.18,"supply_charge_cents_per_day":115.45},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1416.79,"at_4000_kwh":1748.59,"at_5000_kwh":2080.39,"at_8000_kwh":3075.79},"marginal_rates":{"excess_unit_cost_cents":33.18,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986540mre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986540MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"197.88","description":"Access wholesale energy rates with a $16.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24},{"plan_id":"globird-glo1054034mre1eme-electricity","cdr_plan_id":"GLO1054034MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"EASYEV Residential (Flexible Rate CTL)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":148,"peak_cents_per_kwh":65,"off_peak_cents_per_kwh":5.45,"shoulder_cents_per_kwh":40,"peak_hours":"4pm-10:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"11am-1:59pm mon, tue, wed, thu, fri, sat, sun; 12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"6am-10:59am mon, tue, wed, thu, fri, sat, sun; 2pm-3:59pm mon, tue, wed, thu, fri, sat, sun; 11pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1446.95,"at_4000_kwh":1749.2,"at_5000_kwh":2051.45,"at_8000_kwh":2958.2},"marginal_rates":{"excess_unit_cost_cents":65,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You have an electric vehicle."},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054034mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054034MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird currently pay 2.00 cents/kWh solar feed-in between 4pm and 11pm (incl. GST if any).","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":2,"hours":"4pm-10:59pm","startHour":16,"endHour":23}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird currently pay 0.00 cents/kWh solar feed-in for other time (incl. GST if any).","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":23,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":0,"endHour":16}]}],"terms":"This offer is for SA residential customers with an eligible electricity smart meter and an Electric Vehicle charging at your property. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Nine-hour low EV rate","description":"$0.06/kWh incl. GST for first 20kWh every day between 11am-2pm & 12am-6am (Local Time), excluding controlled load."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":5.45},{"type":"SHOULDER","startHour":6,"endHour":11,"rateCents":40},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":5.45},{"type":"SHOULDER","startHour":14,"endHour":16,"rateCents":40},{"type":"PEAK","startHour":16,"endHour":23,"rateCents":65},{"type":"SHOULDER","startHour":23,"endHour":24,"rateCents":40}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24},{"plan_id":"globird-glo1054033mre1eme-electricity","cdr_plan_id":"GLO1054033MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"EASYEV Residential (Flexible Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":148,"peak_cents_per_kwh":65,"off_peak_cents_per_kwh":5.45,"shoulder_cents_per_kwh":40,"peak_hours":"4pm-10:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"11am-1:59pm mon, tue, wed, thu, fri, sat, sun; 12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"6am-10:59am mon, tue, wed, thu, fri, sat, sun; 2pm-3:59pm mon, tue, wed, thu, fri, sat, sun; 11pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1446.95,"at_4000_kwh":1749.2,"at_5000_kwh":2051.45,"at_8000_kwh":2958.2},"marginal_rates":{"excess_unit_cost_cents":65,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You have an electric vehicle."},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054033mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054033MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird currently pay 2.00 cents/kWh solar feed-in between 4pm and 11pm (incl. GST if any).","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":2,"hours":"4pm-10:59pm","startHour":16,"endHour":23}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird currently pay 0.00 cents/kWh solar feed-in for other time (incl. GST if any).","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":23,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":0,"endHour":16}]}],"terms":"This offer is for SA residential customers with an eligible electricity smart meter and an Electric Vehicle charging at your property. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Nine-hour low EV rate","description":"$0.06/kWh incl. GST for first 20kWh every day between 11am-2pm & 12am-6am (Local Time), excluding controlled load."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":5.45},{"type":"SHOULDER","startHour":6,"endHour":11,"rateCents":40},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":5.45},{"type":"SHOULDER","startHour":14,"endHour":16,"rateCents":40},{"type":"PEAK","startHour":16,"endHour":23,"rateCents":65},{"type":"SHOULDER","startHour":23,"endHour":24,"rateCents":40}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":24},{"plan_id":"1st-energy-1st1042846mbe1eme-electricity","cdr_plan_id":"1ST1042846MBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Sapphire - Single Rate + Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":35.6,"supply_charge_cents_per_day":95},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1414.75,"at_4000_kwh":1770.75,"at_5000_kwh":2126.75,"at_8000_kwh":3194.75},"marginal_rates":{"excess_unit_cost_cents":35.6,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042846mbe1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042846MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":23},{"plan_id":"1st-energy-1st1042845mbe1eme-electricity","cdr_plan_id":"1ST1042845MBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Sapphire - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":35.6,"supply_charge_cents_per_day":95},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1414.75,"at_4000_kwh":1770.75,"at_5000_kwh":2126.75,"at_8000_kwh":3194.75},"marginal_rates":{"excess_unit_cost_cents":35.6,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042845mbe1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042845MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":23},{"plan_id":"origin-ori665045mre15eme-electricity","cdr_plan_id":"ORI665045MRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Everyday Rewards Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":99.17,"peak_cents_per_kwh":50.98,"off_peak_cents_per_kwh":30.11,"shoulder_cents_per_kwh":25.15,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1423.34,"at_4000_kwh":1777.13,"at_5000_kwh":2130.92,"at_8000_kwh":3192.29},"marginal_rates":{"excess_unit_cost_cents":50.98,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Everyday Rewards Membership"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori665045mre15eme-electricity&source=ai","last_verified":"2025-10-15","source_doc":"CDR EnergyPlanDetailV3 ORI665045MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"Your usage and supply Charges and other charges such as charges for Add-ons and any solar feed-in tariff may change during the Energy Plan period. If they do change, we�ll let you know at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Everyday Rewards Points","description":"You will receive up to 5000 one-off Everyday Rewards points, approximately 45 days after your Acceptance date and ongoing 1 Everyday Rewards point per $1 (incl GST) charged on your bill for your usage and supply during energy plan period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":50.98},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":25.15},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":50.98}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.8},{"plan_id":"origin-ori665061mre15eme-electricity","cdr_plan_id":"ORI665061MRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Everyday Rewards Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":99.17,"peak_cents_per_kwh":50.98,"off_peak_cents_per_kwh":30.11,"shoulder_cents_per_kwh":25.15,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1423.34,"at_4000_kwh":1777.13,"at_5000_kwh":2130.92,"at_8000_kwh":3192.29},"marginal_rates":{"excess_unit_cost_cents":50.98,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Everyday Rewards Membership"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori665061mre15eme-electricity&source=ai","last_verified":"2025-10-15","source_doc":"CDR EnergyPlanDetailV3 ORI665061MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"Your usage and supply Charges and other charges such as charges for Add-ons and any solar feed-in tariff may change during the Energy Plan period. If they do change, we�ll let you know at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Everyday Rewards Points","description":"You will receive up to 5000 one-off Everyday Rewards points, approximately 45 days after your Acceptance date and ongoing 1 Everyday Rewards point per $1 (incl GST) charged on your bill for your usage and supply during energy plan period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":50.98},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":25.15},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":50.98}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.8},{"plan_id":"agl-agl1055696mre1eme-electricity","cdr_plan_id":"AGL1055696MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.25,"supply_charge_cents_per_day":89.76,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":36.25},{"volume_kwh":null,"rate_cents_per_kwh":36.25}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1415.12,"at_4000_kwh":1777.62,"at_5000_kwh":2140.12,"at_8000_kwh":3227.62},"marginal_rates":{"excess_unit_cost_cents":36.25,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055696mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055696MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.7},{"plan_id":"agl-agl1055694mre1eme-electricity","cdr_plan_id":"AGL1055694MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.25,"supply_charge_cents_per_day":89.76,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":36.25},{"volume_kwh":null,"rate_cents_per_kwh":36.25}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1415.12,"at_4000_kwh":1777.62,"at_5000_kwh":2140.12,"at_8000_kwh":3227.62},"marginal_rates":{"excess_unit_cost_cents":36.25,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055694mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055694MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.7},{"plan_id":"agl-agl1055659mre1eme-electricity","cdr_plan_id":"AGL1055659MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.25,"supply_charge_cents_per_day":89.76,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":36.25},{"volume_kwh":null,"rate_cents_per_kwh":36.25}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1415.12,"at_4000_kwh":1777.62,"at_5000_kwh":2140.12,"at_8000_kwh":3227.62},"marginal_rates":{"excess_unit_cost_cents":36.25,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055659mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055659MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.7},{"plan_id":"agl-agl1055658mre1eme-electricity","cdr_plan_id":"AGL1055658MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.25,"supply_charge_cents_per_day":89.76,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":36.25},{"volume_kwh":null,"rate_cents_per_kwh":36.25}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1415.12,"at_4000_kwh":1777.62,"at_5000_kwh":2140.12,"at_8000_kwh":3227.62},"marginal_rates":{"excess_unit_cost_cents":36.25,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055658mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055658MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.7},{"plan_id":"agl-agl898887mre9eme-electricity","cdr_plan_id":"AGL898887MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.25,"supply_charge_cents_per_day":89.76,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":36.25},{"volume_kwh":null,"rate_cents_per_kwh":36.25}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1415.12,"at_4000_kwh":1777.62,"at_5000_kwh":2140.12,"at_8000_kwh":3227.62},"marginal_rates":{"excess_unit_cost_cents":36.25,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898887mre9eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898887MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.7},{"plan_id":"agl-agl898890mre9eme-electricity","cdr_plan_id":"AGL898890MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.25,"supply_charge_cents_per_day":89.76,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":36.25},{"volume_kwh":null,"rate_cents_per_kwh":36.25}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1415.12,"at_4000_kwh":1777.62,"at_5000_kwh":2140.12,"at_8000_kwh":3227.62},"marginal_rates":{"excess_unit_cost_cents":36.25,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898890mre9eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898890MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.7},{"plan_id":"agl-agl360509mre39eme-electricity","cdr_plan_id":"AGL360509MRE39@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.25,"supply_charge_cents_per_day":89.76,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":36.25},{"volume_kwh":null,"rate_cents_per_kwh":36.25}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1415.12,"at_4000_kwh":1777.62,"at_5000_kwh":2140.12,"at_8000_kwh":3227.62},"marginal_rates":{"excess_unit_cost_cents":36.25,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl360509mre39eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL360509MRE39@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.7},{"plan_id":"agl-agl360507mre39eme-electricity","cdr_plan_id":"AGL360507MRE39@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Seniors Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.25,"supply_charge_cents_per_day":89.76,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":36.25},{"volume_kwh":null,"rate_cents_per_kwh":36.25}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1415.12,"at_4000_kwh":1777.62,"at_5000_kwh":2140.12,"at_8000_kwh":3227.62},"marginal_rates":{"excess_unit_cost_cents":36.25,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl360507mre39eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL360507MRE39@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"0.00","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"0.00","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.7},{"plan_id":"1st-energy-1st1042502mre1eme-electricity","cdr_plan_id":"1ST1042502MRE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Ruby - Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":107,"peak_cents_per_kwh":48.4,"off_peak_cents_per_kwh":30.4,"shoulder_cents_per_kwh":25.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1435.15,"at_4000_kwh":1783.35,"at_5000_kwh":2131.55,"at_8000_kwh":3176.15},"marginal_rates":{"excess_unit_cost_cents":48.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042502mre1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042502MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":48.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.4},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":25.5},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":48.4}]}]}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.5},{"plan_id":"alinta-ali1018940mre1eme-electricity","cdr_plan_id":"ALI1018940MRE1@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Edge - Time of Use (Interval) + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":116.44,"peak_cents_per_kwh":50.69,"off_peak_cents_per_kwh":28.24,"shoulder_cents_per_kwh":23.24,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1444.26,"at_4000_kwh":1784.01,"at_5000_kwh":2123.76,"at_8000_kwh":3143.01},"marginal_rates":{"excess_unit_cost_cents":50.69,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1018940mre1eme-electricity&source=ai","last_verified":"2025-11-13","source_doc":"CDR EnergyPlanDetailV3 ALI1018940MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":50.69},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.24},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":50.69},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":23.24},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":50.69}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.5},{"plan_id":"alinta-ali1018937mre1eme-electricity","cdr_plan_id":"ALI1018937MRE1@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Edge - Time of Use (Interval)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":116.44,"peak_cents_per_kwh":50.69,"off_peak_cents_per_kwh":28.24,"shoulder_cents_per_kwh":23.24,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1444.26,"at_4000_kwh":1784.01,"at_5000_kwh":2123.76,"at_8000_kwh":3143.01},"marginal_rates":{"excess_unit_cost_cents":50.69,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1018937mre1eme-electricity&source=ai","last_verified":"2025-11-13","source_doc":"CDR EnergyPlanDetailV3 ALI1018937MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":50.69},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.24},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":50.69},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":23.24},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":50.69}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.5},{"plan_id":"agl-agl1055724mre1eme-electricity","cdr_plan_id":"AGL1055724MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055724mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055724MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃƒÂ¢Ã¢â€šÂ¬Ã¢â€žÂ¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl1055722mre1eme-electricity","cdr_plan_id":"AGL1055722MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055722mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055722MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃƒÂ¢Ã¢â€šÂ¬Ã¢â€žÂ¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl1055721mre1eme-electricity","cdr_plan_id":"AGL1055721MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055721mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055721MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃƒÂ¢Ã¢â€šÂ¬Ã¢â€žÂ¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl1055707mre1eme-electricity","cdr_plan_id":"AGL1055707MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055707mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055707MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl1055708mre1eme-electricity","cdr_plan_id":"AGL1055708MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055708mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055708MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl1055665mre1eme-electricity","cdr_plan_id":"AGL1055665MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055665mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055665MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl1055705mre1eme-electricity","cdr_plan_id":"AGL1055705MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055705mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055705MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl1055667mre1eme-electricity","cdr_plan_id":"AGL1055667MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055667mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055667MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl1055668mre1eme-electricity","cdr_plan_id":"AGL1055668MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055668mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055668MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl898913mre10eme-electricity","cdr_plan_id":"AGL898913MRE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898913mre10eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898913MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl898909mre10eme-electricity","cdr_plan_id":"AGL898909MRE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898909mre10eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898909MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl898912mre10eme-electricity","cdr_plan_id":"AGL898912MRE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898912mre10eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898912MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl698053mre23eme-electricity","cdr_plan_id":"AGL698053MRE23@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl698053mre23eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL698053MRE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl698046mre23eme-electricity","cdr_plan_id":"AGL698046MRE23@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl698046mre23eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL698046MRE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl698049mre23eme-electricity","cdr_plan_id":"AGL698049MRE23@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl698049mre23eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL698049MRE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl100678mre51eme-electricity","cdr_plan_id":"AGL100678MRE51@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl100678mre51eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL100678MRE51@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃƒÂ¢Ã¢â€šÂ¬Ã¢â€žÂ¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"agl-agl238821mre48eme-electricity","cdr_plan_id":"AGL238821MRE48@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":101.38,"peak_cents_per_kwh":49.4,"off_peak_cents_per_kwh":32.11,"shoulder_cents_per_kwh":22.7,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1432.49,"at_4000_kwh":1786.64,"at_5000_kwh":2140.79,"at_8000_kwh":3203.24},"marginal_rates":{"excess_unit_cost_cents":49.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl238821mre48eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL238821MRE48@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃƒÂ¢Ã¢â€šÂ¬Ã¢â€žÂ¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":49.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.11},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":22.7},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.4},{"plan_id":"covau-cov1030371sre1eme-electricity","cdr_plan_id":"COV1030371SRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"CovaU Basics Residential Flexible","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":108.8,"peak_cents_per_kwh":48,"off_peak_cents_per_kwh":30.6,"shoulder_cents_per_kwh":25.8,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1442.92,"at_4000_kwh":1791.52,"at_5000_kwh":2140.12,"at_8000_kwh":3185.92},"marginal_rates":{"excess_unit_cost_cents":48,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1030371sre1eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 COV1030371SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-In Tariff: Single Rate Feed In Tariff","description":"Feed-In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":48},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.6},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":25.8},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":48}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.1},{"plan_id":"covau-cov1030372sre1eme-electricity","cdr_plan_id":"COV1030372SRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"CovaU Basics Residential Flexible + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":108.8,"peak_cents_per_kwh":48,"off_peak_cents_per_kwh":30.6,"shoulder_cents_per_kwh":25.8,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1442.92,"at_4000_kwh":1791.52,"at_5000_kwh":2140.12,"at_8000_kwh":3185.92},"marginal_rates":{"excess_unit_cost_cents":48,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1030372sre1eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 COV1030372SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-In Tariff: Single Rate Feed In Tariff","description":"Feed-In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":48},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.6},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":25.8},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":48}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.1},{"plan_id":"powershop-psh997495mbe1eme-electricity","cdr_plan_id":"PSH997495MBE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":132.8,"peak_cents_per_kwh":39.95,"off_peak_cents_per_kwh":29.62,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1466.29,"at_4000_kwh":1793.48,"at_5000_kwh":2120.67,"at_8000_kwh":3102.24},"marginal_rates":{"excess_unit_cost_cents":39.95,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh997495mbe1eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH997495MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"If you�re on a Time of Use tariff and have a basic accumulation (type 6) meter, your peak, off-peak and shoulder times may be determined by your distributor and differ from the above times shown with the prices. To check applicable times, visit www.powershop.com.au/timings-information. For full offer terms and conditions, visit powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). We offer 10%, 25%, 50% and 100% GreenPower.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.62},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":39.95},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.62}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.1},{"plan_id":"powershop-psh997582mbe1eme-electricity","cdr_plan_id":"PSH997582MBE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":132.8,"peak_cents_per_kwh":39.95,"off_peak_cents_per_kwh":29.62,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1466.29,"at_4000_kwh":1793.48,"at_5000_kwh":2120.67,"at_8000_kwh":3102.24},"marginal_rates":{"excess_unit_cost_cents":39.95,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh997582mbe1eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH997582MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"If you�re on a Time of Use tariff and have a basic accumulation (type 6) meter, your peak, off-peak and shoulder times may be determined by your distributor and differ from the above times shown with the prices. To check applicable times, visit www.powershop.com.au/timings-information. For full offer terms and conditions, visit powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). We offer 10%, 25%, 50% and 100% GreenPower.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.62},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":39.95},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.62}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":22.1},{"plan_id":"origin-ori727566mre11eme-electricity","cdr_plan_id":"ORI727566MRE11@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Solar Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.23,"peak_cents_per_kwh":51.52,"off_peak_cents_per_kwh":30.43,"shoulder_cents_per_kwh":25.41,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1438.43,"at_4000_kwh":1795.96,"at_5000_kwh":2153.49,"at_8000_kwh":3226.08},"marginal_rates":{"excess_unit_cost_cents":51.52,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori727566mre11eme-electricity&source=ai","last_verified":"2025-11-20","source_doc":"CDR EnergyPlanDetailV3 ORI727566MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 5 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"A payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.52},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":25.41},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":51.52}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.9},{"plan_id":"origin-ori727571mre11eme-electricity","cdr_plan_id":"ORI727571MRE11@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Solar Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.23,"peak_cents_per_kwh":51.52,"off_peak_cents_per_kwh":30.43,"shoulder_cents_per_kwh":25.41,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1438.43,"at_4000_kwh":1795.96,"at_5000_kwh":2153.49,"at_8000_kwh":3226.08},"marginal_rates":{"excess_unit_cost_cents":51.52,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori727571mre11eme-electricity&source=ai","last_verified":"2025-11-20","source_doc":"CDR EnergyPlanDetailV3 ORI727571MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 5 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"A payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30.43},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.52},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":25.41},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":51.52}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.9},{"plan_id":"alinta-ali153096sre13eme-electricity","cdr_plan_id":"ALI153096SRE13@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"Standing Offer - Time of Use (Interval) + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.62,"peak_cents_per_kwh":51.2,"off_peak_cents_per_kwh":28.53,"shoulder_cents_per_kwh":23.47,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1458.88,"at_4000_kwh":1802.07,"at_5000_kwh":2145.26,"at_8000_kwh":3174.83},"marginal_rates":{"excess_unit_cost_cents":51.2,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali153096sre13eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI153096SRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.2},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.53},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.2},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":23.47},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.2}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.7},{"plan_id":"alinta-ali875577mre4eme-electricity","cdr_plan_id":"ALI875577MRE4@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SolarBalance Go - Time of Use (Interval)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.62,"peak_cents_per_kwh":51.2,"off_peak_cents_per_kwh":28.53,"shoulder_cents_per_kwh":23.47,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":9,"annual_cost_estimates":{"at_3000_kwh":1458.88,"at_4000_kwh":1802.07,"at_5000_kwh":2145.26,"at_8000_kwh":3174.83},"marginal_rates":{"excess_unit_cost_cents":51.2,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"System Size"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali875577mre4eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI875577MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Bonus FiT","description":"Solar Balance FiT","type":"single","rate_cents_per_kwh":9},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Stepped FiT","description":"This plan includes a stepped feed-in tariff, where you will receive a feed-in tariff of 9c/kWh for the first 10kW exported. For any export after that you will obtain Alinta Energys standard retailer feed-in tariff."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.2},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.53},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.2},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":23.47},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.2}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.7},{"plan_id":"alinta-ali153095sre12eme-electricity","cdr_plan_id":"ALI153095SRE12@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"Standing Offer - Time of Use (Interval)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.62,"peak_cents_per_kwh":51.2,"off_peak_cents_per_kwh":28.53,"shoulder_cents_per_kwh":23.47,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1458.88,"at_4000_kwh":1802.07,"at_5000_kwh":2145.26,"at_8000_kwh":3174.83},"marginal_rates":{"excess_unit_cost_cents":51.2,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali153095sre12eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI153095SRE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.2},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.53},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.2},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":23.47},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.2}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.7},{"plan_id":"alinta-ali875581mre5eme-electricity","cdr_plan_id":"ALI875581MRE5@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SolarBalance Go - Time of Use (Interval) + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.62,"peak_cents_per_kwh":51.2,"off_peak_cents_per_kwh":28.53,"shoulder_cents_per_kwh":23.47,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":9,"annual_cost_estimates":{"at_3000_kwh":1458.88,"at_4000_kwh":1802.07,"at_5000_kwh":2145.26,"at_8000_kwh":3174.83},"marginal_rates":{"excess_unit_cost_cents":51.2,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"System Size"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali875581mre5eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI875581MRE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Bonus FiT","description":"Solar Balance FiT","type":"single","rate_cents_per_kwh":9},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Stepped FiT","description":"This plan includes a stepped feed-in tariff, where you will receive a feed-in tariff of 9c/kWh for the first 10kW exported. For any export after that you will obtain Alinta Energys standard retailer feed-in tariff."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.2},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":28.53},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.2},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":23.47},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.2}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.7},{"plan_id":"kogan-kog1051333mre2eme-electricity","cdr_plan_id":"KOG1051333MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy for current FIRST members","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.48,"peak_cents_per_kwh":48.75,"off_peak_cents_per_kwh":28.35,"shoulder_cents_per_kwh":29.78,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1456.88,"at_4000_kwh":1804.44,"at_5000_kwh":2152,"at_8000_kwh":3194.68},"marginal_rates":{"excess_unit_cost_cents":48.75,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051333mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051333MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":28.35},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":29.78},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":28.35},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":28.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.6},{"plan_id":"kogan-kog1051316mre2eme-electricity","cdr_plan_id":"KOG1051316MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy with free FIRST","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.48,"peak_cents_per_kwh":48.75,"off_peak_cents_per_kwh":28.35,"shoulder_cents_per_kwh":29.78,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1456.88,"at_4000_kwh":1804.44,"at_5000_kwh":2152,"at_8000_kwh":3194.68},"marginal_rates":{"excess_unit_cost_cents":48.75,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051316mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051316MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":28.35},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":29.78},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":28.35},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":28.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.6},{"plan_id":"kogan-kog1051264mre2eme-electricity","cdr_plan_id":"KOG1051264MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy with free FIRST","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.48,"peak_cents_per_kwh":48.75,"off_peak_cents_per_kwh":28.35,"shoulder_cents_per_kwh":29.78,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1456.88,"at_4000_kwh":1804.44,"at_5000_kwh":2152,"at_8000_kwh":3194.68},"marginal_rates":{"excess_unit_cost_cents":48.75,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051264mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051264MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":28.35},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":29.78},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":28.35},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":28.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.6},{"plan_id":"kogan-kog1051271mre2eme-electricity","cdr_plan_id":"KOG1051271MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy for current FIRST members","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.48,"peak_cents_per_kwh":48.75,"off_peak_cents_per_kwh":28.35,"shoulder_cents_per_kwh":29.78,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1456.88,"at_4000_kwh":1804.44,"at_5000_kwh":2152,"at_8000_kwh":3194.68},"marginal_rates":{"excess_unit_cost_cents":48.75,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog1051271mre2eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 KOG1051271MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":28.35},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":29.78},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":28.35},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":28.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.6},{"plan_id":"powershop-psh1051117mre1eme-electricity","cdr_plan_id":"PSH1051117MRE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power House","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.48,"peak_cents_per_kwh":48.75,"off_peak_cents_per_kwh":28.35,"shoulder_cents_per_kwh":29.78,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1456.88,"at_4000_kwh":1804.44,"at_5000_kwh":2152,"at_8000_kwh":3194.68},"marginal_rates":{"excess_unit_cost_cents":48.75,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1051117mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 PSH1051117MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to Powershop automatically debiting your preferred payment method for any outstanding amounts due. Further information in relation to this offer, see our terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":28.35},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":29.78},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":28.35},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":28.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.6},{"plan_id":"powershop-psh1051116mre1eme-electricity","cdr_plan_id":"PSH1051116MRE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power House","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.48,"peak_cents_per_kwh":48.75,"off_peak_cents_per_kwh":28.35,"shoulder_cents_per_kwh":29.78,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1456.88,"at_4000_kwh":1804.44,"at_5000_kwh":2152,"at_8000_kwh":3194.68},"marginal_rates":{"excess_unit_cost_cents":48.75,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1051116mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 PSH1051116MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to Powershop automatically debiting your preferred payment method for any outstanding amounts due. Further information in relation to this offer, see our terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":28.35},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":29.78},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":28.35},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":28.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.6},{"plan_id":"blue-nrg-blu1052846mbe1eme-electricity","cdr_plan_id":"BLU1052846MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Business Edge","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.29,"supply_charge_cents_per_day":97.24},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1443.63,"at_4000_kwh":1806.53,"at_5000_kwh":2169.43,"at_8000_kwh":3258.13},"marginal_rates":{"excess_unit_cost_cents":36.29,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New customers only."},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1052846mbe1eme-electricity&source=ai","last_verified":"2026-05-01","source_doc":"CDR EnergyPlanDetailV3 BLU1052846MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due date","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.5},{"plan_id":"blue-nrg-blu1043606mbe1eme-electricity","cdr_plan_id":"BLU1043606MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Zembl Edge","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.29,"supply_charge_cents_per_day":97.24},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1443.63,"at_4000_kwh":1806.53,"at_5000_kwh":2169.43,"at_8000_kwh":3258.13},"marginal_rates":{"excess_unit_cost_cents":36.29,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1043606mbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 BLU1043606MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due date","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.5},{"plan_id":"energy-locals-retail-lcl1053786mre1eme-electricity","cdr_plan_id":"LCL1053786MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Home Energy Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":119.09,"peak_cents_per_kwh":51.36,"off_peak_cents_per_kwh":29.09,"shoulder_cents_per_kwh":22.27,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"$100 Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Stay on this plan for 6 months, and we'll credit $100 to your account. Terms apply - visit www.energylocalsretail.com.au/terms-and-conditions for full details."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1466.89,"at_4000_kwh":1810.96,"at_5000_kwh":2155.03,"at_8000_kwh":3187.24},"marginal_rates":{"excess_unit_cost_cents":51.36,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1053786mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 LCL1053786MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":29.09},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":22.27},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":29.09},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":51.36},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.3},{"plan_id":"lumo-energy-sa-lum203107mre22eme-electricity","cdr_plan_id":"LUM203107MRE22@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic (TOUCL)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.95,"supply_charge_cents_per_day":91.78},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1443.5,"at_4000_kwh":1813,"at_5000_kwh":2182.5,"at_8000_kwh":3291},"marginal_rates":{"excess_unit_cost_cents":36.95,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203107mre22eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203107MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.2},{"plan_id":"lumo-energy-sa-lum203109mre22eme-electricity","cdr_plan_id":"LUM203109MRE22@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.95,"supply_charge_cents_per_day":91.78},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1443.5,"at_4000_kwh":1813,"at_5000_kwh":2182.5,"at_8000_kwh":3291},"marginal_rates":{"excess_unit_cost_cents":36.95,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203109mre22eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203109MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.2},{"plan_id":"lumo-energy-sa-lum203101mre24eme-electricity","cdr_plan_id":"LUM203101MRE24@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.95,"supply_charge_cents_per_day":91.78},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1443.5,"at_4000_kwh":1813,"at_5000_kwh":2182.5,"at_8000_kwh":3291},"marginal_rates":{"excess_unit_cost_cents":36.95,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203101mre24eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203101MRE24@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21.2},{"plan_id":"blue-nrg-blu1033551mbe1eme-electricity","cdr_plan_id":"BLU1033551MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Diamond 2026","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":67.14,"peak_cents_per_kwh":53.01,"off_peak_cents_per_kwh":33.45,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1424.6,"at_4000_kwh":1817.78,"at_5000_kwh":2210.96,"at_8000_kwh":3390.5},"marginal_rates":{"excess_unit_cost_cents":53.01,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"No Restrictions"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1033551mbe1eme-electricity&source=ai","last_verified":"2026-01-28","source_doc":"CDR EnergyPlanDetailV3 BLU1033551MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due dat","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.45},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":53.01},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.45}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.45}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21},{"plan_id":"blue-nrg-blu1033550mbe1eme-electricity","cdr_plan_id":"BLU1033550MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Diamond 2026","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":67.14,"peak_cents_per_kwh":53.01,"off_peak_cents_per_kwh":33.45,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1424.6,"at_4000_kwh":1817.78,"at_5000_kwh":2210.96,"at_8000_kwh":3390.5},"marginal_rates":{"excess_unit_cost_cents":53.01,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"No Restrictions"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1033550mbe1eme-electricity&source=ai","last_verified":"2026-01-28","source_doc":"CDR EnergyPlanDetailV3 BLU1033550MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due dat","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.45},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":53.01},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.45}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.45}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21},{"plan_id":"agl-agl1059353mbe1eme-electricity","cdr_plan_id":"AGL1059353MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.52,"peak_cents_per_kwh":43.06,"off_peak_cents_per_kwh":29.77,"shoulder_cents_per_kwh":36.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1466.96,"at_4000_kwh":1817.83,"at_5000_kwh":2168.7,"at_8000_kwh":3221.31},"marginal_rates":{"excess_unit_cost_cents":43.06,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059353mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059353MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":36.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.77},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21},{"plan_id":"agl-agl1059347mbe1eme-electricity","cdr_plan_id":"AGL1059347MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.52,"peak_cents_per_kwh":43.06,"off_peak_cents_per_kwh":29.77,"shoulder_cents_per_kwh":36.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1466.96,"at_4000_kwh":1817.83,"at_5000_kwh":2168.7,"at_8000_kwh":3221.31},"marginal_rates":{"excess_unit_cost_cents":43.06,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059347mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059347MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":36.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.77},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21},{"plan_id":"agl-agl1059313mbe1eme-electricity","cdr_plan_id":"AGL1059313MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.52,"peak_cents_per_kwh":43.06,"off_peak_cents_per_kwh":29.77,"shoulder_cents_per_kwh":36.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1466.96,"at_4000_kwh":1817.83,"at_5000_kwh":2168.7,"at_8000_kwh":3221.31},"marginal_rates":{"excess_unit_cost_cents":43.06,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059313mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059313MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":36.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.77},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21},{"plan_id":"agl-agl1059383mbe1eme-electricity","cdr_plan_id":"AGL1059383MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.52,"peak_cents_per_kwh":43.06,"off_peak_cents_per_kwh":29.77,"shoulder_cents_per_kwh":36.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1466.96,"at_4000_kwh":1817.83,"at_5000_kwh":2168.7,"at_8000_kwh":3221.31},"marginal_rates":{"excess_unit_cost_cents":43.06,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059383mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059383MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":36.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.77},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21},{"plan_id":"agl-agl1059334mbe1eme-electricity","cdr_plan_id":"AGL1059334MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.52,"peak_cents_per_kwh":43.06,"off_peak_cents_per_kwh":29.77,"shoulder_cents_per_kwh":36.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1466.96,"at_4000_kwh":1817.83,"at_5000_kwh":2168.7,"at_8000_kwh":3221.31},"marginal_rates":{"excess_unit_cost_cents":43.06,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059334mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059334MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":36.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.77},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21},{"plan_id":"agl-agl1059315mbe1eme-electricity","cdr_plan_id":"AGL1059315MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.52,"peak_cents_per_kwh":43.06,"off_peak_cents_per_kwh":29.77,"shoulder_cents_per_kwh":36.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1466.96,"at_4000_kwh":1817.83,"at_5000_kwh":2168.7,"at_8000_kwh":3221.31},"marginal_rates":{"excess_unit_cost_cents":43.06,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059315mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059315MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":36.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.77},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.06},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":36.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":21},{"plan_id":"amber-electric-amb1042961sre1eme-electricity","cdr_plan_id":"AMB1042961SRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Standing Offer: Fixed Rate + Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.43,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1454.94,"at_4000_kwh":1819.24,"at_5000_kwh":2183.54,"at_8000_kwh":3276.44},"marginal_rates":{"excess_unit_cost_cents":36.43,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042961sre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042961SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Fixed feed in","description":"Fixed feed in of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. Available to residential customers in SA Power Network's distribution region with a flat rate tariff and controlled load. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"This is a fixed tariff. You will not get access to the wholesale rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these fixed rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.9},{"plan_id":"amber-electric-amb1042956sre1eme-electricity","cdr_plan_id":"AMB1042956SRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Standing Offer: Fixed Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.43,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1454.94,"at_4000_kwh":1819.24,"at_5000_kwh":2183.54,"at_8000_kwh":3276.44},"marginal_rates":{"excess_unit_cost_cents":36.43,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042956sre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042956SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Fixed feed in","description":"Fixed feed in of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. Available to residential customers in SA Power Network's distribution region with a flat rate tariff. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"This is a fixed tariff. You will not get access to the wholesale rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these fixed rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.9},{"plan_id":"lumo-energy-sa-lum203116mbe23eme-electricity","cdr_plan_id":"LUM203116MBE23@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":92.85,"peak_cents_per_kwh":44.35,"off_peak_cents_per_kwh":33.98,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1451.63,"at_4000_kwh":1822.54,"at_5000_kwh":2193.45,"at_8000_kwh":3306.18},"marginal_rates":{"excess_unit_cost_cents":44.35,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203116mbe23eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203116MBE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl)? generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.98},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":44.35},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.98}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.98},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":33.98},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.98}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.8},{"plan_id":"lumo-energy-sa-lum203091mbe21eme-electricity","cdr_plan_id":"LUM203091MBE21@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":92.85,"peak_cents_per_kwh":44.35,"off_peak_cents_per_kwh":33.98,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1451.63,"at_4000_kwh":1822.54,"at_5000_kwh":2193.45,"at_8000_kwh":3306.18},"marginal_rates":{"excess_unit_cost_cents":44.35,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203091mbe21eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203091MBE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.98},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":44.35},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.98}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.98},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":33.98},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.98}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.8},{"plan_id":"radian-ior1045453sre1eme-electricity","cdr_plan_id":"IOR1045453SRE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Standing Offer - Residential Anytime + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":37.27,"supply_charge_cents_per_day":90.91},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1449.92,"at_4000_kwh":1822.62,"at_5000_kwh":2195.32,"at_8000_kwh":3313.42},"marginal_rates":{"excess_unit_cost_cents":37.27,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1045453sre1eme-electricity&source=ai","last_verified":"2026-04-13","source_doc":"CDR EnergyPlanDetailV3 IOR1045453SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":5}],"terms":"For futher details on the terms and conditions of the offer and other fees and charges, please visit www.ioenergy.com.au or call 1300313463","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, please visit www.ioenergy.com.au or call 1300313463","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post.Includes GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments will incur a 0.46%. Waived for direct debit","term":"PERCENT_OF_BILL","rate":"0.0046"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percent of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.8},{"plan_id":"energy-locals-retail-lcl1053790mre1eme-electricity","cdr_plan_id":"LCL1053790MRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Home Energy Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.73,"peak_cents_per_kwh":51.82,"off_peak_cents_per_kwh":29.55,"shoulder_cents_per_kwh":22.73,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"$100 Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Stay on this plan for 6 months, and we'll credit $100 to your account. Terms apply - visit www.energylocalsretail.com.au/terms-and-conditions for full details."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1475.72,"at_4000_kwh":1824.39,"at_5000_kwh":2173.06,"at_8000_kwh":3219.07},"marginal_rates":{"excess_unit_cost_cents":51.82,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1053790mre1eme-electricity&source=ai","last_verified":"2026-05-14","source_doc":"CDR EnergyPlanDetailV3 LCL1053790MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"In some circumstances your distributor may charge fees for certain additional services such as a disconnection. See energylocalsretail.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocalsretail.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% GreenPower option.","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% GreenPower option.","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower option.","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":29.55},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":22.73},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":29.55},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":51.82},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.55}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.7},{"plan_id":"momentum-mom919937mre3eme-electricity","cdr_plan_id":"MOM919937MRE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Home Run Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":155.7,"peak_cents_per_kwh":47.4,"off_peak_cents_per_kwh":23.3,"shoulder_cents_per_kwh":28.8,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1517.21,"at_4000_kwh":1833.51,"at_5000_kwh":2149.8,"at_8000_kwh":3098.71},"marginal_rates":{"excess_unit_cost_cents":47.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919937mre3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919937MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, pay by direct debit, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from https://www.momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":28.8},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":23.3},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":28.8},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":47.4},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":28.8}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.3},{"plan_id":"momentum-mom919748mre3eme-electricity","cdr_plan_id":"MOM919748MRE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Warm Welcome","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":155.7,"peak_cents_per_kwh":47.4,"off_peak_cents_per_kwh":23.3,"shoulder_cents_per_kwh":28.8,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1517.21,"at_4000_kwh":1833.51,"at_5000_kwh":2149.8,"at_8000_kwh":3098.71},"marginal_rates":{"excess_unit_cost_cents":47.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919748mre3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919748MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. This plan is only available to residential customers who sign up a new supply address, agree to direct debit, eCommunications and eBilling and have the necessary metering system configuration. Full T&Cs can be obtained from https://www.momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"$50 Welcome credit (GST incl)","description":"A one-off $50 (GST incl) sign-up credit will be applied to your first electricity bill. This credit cannot be redeemed for cash or transferred to another supply address."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":28.8},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":23.3},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":28.8},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":47.4},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":28.8}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.3},{"plan_id":"flipped-fea1059497mre1eme-electricity","cdr_plan_id":"FEA1059497MRE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Anytime Switched On!","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.16,"supply_charge_cents_per_day":106.3},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1472.8,"at_4000_kwh":1834.4,"at_5000_kwh":2196,"at_8000_kwh":3280.8},"marginal_rates":{"excess_unit_cost_cents":36.16,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059497mre1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059497MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.3},{"plan_id":"momentum-mom919915mre3eme-electricity","cdr_plan_id":"MOM919915MRE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Home Run Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":32.1,"supply_charge_cents_per_day":151.1},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1514.52,"at_4000_kwh":1835.52,"at_5000_kwh":2156.52,"at_8000_kwh":3119.52},"marginal_rates":{"excess_unit_cost_cents":32.1,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919915mre3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919915MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, pay by direct debit, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from https://www.momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.2},{"plan_id":"momentum-mom919726mre3eme-electricity","cdr_plan_id":"MOM919726MRE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Warm Welcome","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":32.1,"supply_charge_cents_per_day":151.1},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1514.52,"at_4000_kwh":1835.52,"at_5000_kwh":2156.52,"at_8000_kwh":3119.52},"marginal_rates":{"excess_unit_cost_cents":32.1,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919726mre3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919726MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. This plan is only available to residential customers who sign up a new supply address, agree to direct debit, eCommunications and eBilling and have the necessary metering system configuration. Full T&Cs can be obtained from https://www.momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"$50 Welcome credit (GST incl)","description":"A one-off $50 (GST incl) sign-up credit will be applied to your first electricity bill. This credit cannot be redeemed for cash or transferred to another supply address."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":20.2},{"plan_id":"energyaustralia-ene996206mre3eme-electricity","cdr_plan_id":"ENE996206MRE3@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - My Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene996206mre3eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE996206MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene996207mre3eme-electricity","cdr_plan_id":"ENE996207MRE3@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - My Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene996207mre3eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE996207MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene996211mre3eme-electricity","cdr_plan_id":"ENE996211MRE3@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Residential Connections","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene996211mre3eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE996211MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene996210mre3eme-electricity","cdr_plan_id":"ENE996210MRE3@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Residential Connections","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene996210mre3eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE996210MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene94153sre32eme-electricity","cdr_plan_id":"ENE94153SRE32@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Standing Offer (Home)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene94153sre32eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE94153SRE32@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"The rates for Standing Offer (Home) may vary, either when the AER changes the reference price, or when we review our rates each year. We will notify you before any rate change occurs.","onExpiryDescription":"This contract continues for as long as you remain on the plan.","billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"10.9","description":"$10.90 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene681819mre11eme-electricity","cdr_plan_id":"ENE681819MRE11@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Rate Fix","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene681819mre11eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE681819MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","onExpiryDescription":"The Fixed Rate Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Fixed Rate Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene681811mre11eme-electricity","cdr_plan_id":"ENE681811MRE11@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Rate Fix","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene681811mre11eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE681811MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","onExpiryDescription":"The Fixed Rate Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Fixed Rate Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene676768mre10eme-electricity","cdr_plan_id":"ENE676768MRE10@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Third Party Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene676768mre10eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE676768MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene676772mre10eme-electricity","cdr_plan_id":"ENE676772MRE10@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Connect Now","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene676772mre10eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE676772MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene676773mre10eme-electricity","cdr_plan_id":"ENE676773MRE10@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Connect Now","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene676773mre10eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE676773MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene676762mre10eme-electricity","cdr_plan_id":"ENE676762MRE10@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Third Party Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene676762mre10eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE676762MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene379811mre22eme-electricity","cdr_plan_id":"ENE379811MRE22@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Flexi Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene379811mre22eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE379811MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene360428mre26eme-electricity","cdr_plan_id":"ENE360428MRE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Solar Max","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene360428mre26eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE360428MRE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Max Superior Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff for the first 10kWh per day (excl. GST if any)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff thereafter (excl. GST if any)","type":"single","rate_cents_per_kwh":3}],"terms":"The higher feed-in-tariff applies for the first 10kWh average solar export per day across your billing period, after which our standard feed-in-tariff rate will apply to the balance of solar export. The daily export is averaged by dividing the total solar export by the number of days in each billing period. Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene379838mre22eme-electricity","cdr_plan_id":"ENE379838MRE22@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Flexi Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene379838mre22eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE379838MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene360412mre26eme-electricity","cdr_plan_id":"ENE360412MRE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Solar Max","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene360412mre26eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE360412MRE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Max Superior Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff for the first 10kWh per day (excl. GST if any)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff thereafter (excl. GST if any)","type":"single","rate_cents_per_kwh":3}],"terms":"The higher feed-in-tariff applies for the first 10kWh average solar export per day across your billing period, after which our standard feed-in-tariff rate will apply to the balance of solar export. The daily export is averaged by dividing the total solar export by the number of days in each billing period. Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"energyaustralia-ene247405sre28eme-electricity","cdr_plan_id":"ENE247405SRE28@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Standing Offer (Home)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":120,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":16.5,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1491,"at_4000_kwh":1842,"at_5000_kwh":2193,"at_8000_kwh":3246},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene247405sre28eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE247405SRE28@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"The rates for Standing Offer (Home) may vary, either when the AER changes the reference price, or when we review our rates each year. We will notify you before any rate change occurs.","onExpiryDescription":"This contract continues for as long as you remain on the plan.","billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"10.9","description":"$10.90 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":30},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":16.5},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"lumo-energy-sa-lum203104mbe20eme-electricity","cdr_plan_id":"LUM203104MBE20@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic (TOU Seasonal)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":92.85,"peak_cents_per_kwh":48.75,"off_peak_cents_per_kwh":33.98,"shoulder_cents_per_kwh":29.98,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1467.23,"at_4000_kwh":1843.34,"at_5000_kwh":2219.45,"at_8000_kwh":3347.78},"marginal_rates":{"excess_unit_cost_cents":48.75,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203104mbe20eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203104MBE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.98},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":29.98},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.98}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":33.98},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.98}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.98},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":29.98},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.98}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.98}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.9},{"plan_id":"origin-ori1018763mbe1eme-electricity","cdr_plan_id":"ORI1018763MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018763mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018763MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori1018752mbe1eme-electricity","cdr_plan_id":"ORI1018752MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018752mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018752MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori953122mbe3eme-electricity","cdr_plan_id":"ORI953122MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953122mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953122MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori953108mbe3eme-electricity","cdr_plan_id":"ORI953108MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953108mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953108MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori953169mbe3eme-electricity","cdr_plan_id":"ORI953169MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953169mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953169MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori1007208mbe2eme-electricity","cdr_plan_id":"ORI1007208MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007208mbe2eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI1007208MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori953135mbe3eme-electricity","cdr_plan_id":"ORI953135MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953135mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953135MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori1007211mbe2eme-electricity","cdr_plan_id":"ORI1007211MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007211mbe2eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI1007211MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori953138mbe3eme-electricity","cdr_plan_id":"ORI953138MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953138mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953138MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori953159mbe3eme-electricity","cdr_plan_id":"ORI953159MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953159mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953159MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori953156mbe3eme-electricity","cdr_plan_id":"ORI953156MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953156mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953156MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori953125mbe3eme-electricity","cdr_plan_id":"ORI953125MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953125mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953125MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori953172mbe3eme-electricity","cdr_plan_id":"ORI953172MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953172mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953172MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"origin-ori953105mbe3eme-electricity","cdr_plan_id":"ORI953105MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":47.56,"off_peak_cents_per_kwh":30.77,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1490.02,"at_4000_kwh":1848.09,"at_5000_kwh":2206.16,"at_8000_kwh":3280.37},"marginal_rates":{"excess_unit_cost_cents":47.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953105mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953105MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.77},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":30.77},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.7},{"plan_id":"agl-agl1059314mbe1eme-electricity","cdr_plan_id":"AGL1059314MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.01,"supply_charge_cents_per_day":90.1,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":38.01},{"volume_kwh":null,"rate_cents_per_kwh":38.01}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1469.17,"at_4000_kwh":1849.26,"at_5000_kwh":2229.36,"at_8000_kwh":3369.66},"marginal_rates":{"excess_unit_cost_cents":38.01,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059314mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059314MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.6},{"plan_id":"agl-agl1059340mbe1eme-electricity","cdr_plan_id":"AGL1059340MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.01,"supply_charge_cents_per_day":90.1,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":38.01},{"volume_kwh":null,"rate_cents_per_kwh":38.01}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1469.17,"at_4000_kwh":1849.26,"at_5000_kwh":2229.36,"at_8000_kwh":3369.66},"marginal_rates":{"excess_unit_cost_cents":38.01,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059340mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059340MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.6},{"plan_id":"agl-agl1059379mbe1eme-electricity","cdr_plan_id":"AGL1059379MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.01,"supply_charge_cents_per_day":90.1,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":38.01},{"volume_kwh":null,"rate_cents_per_kwh":38.01}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1469.17,"at_4000_kwh":1849.26,"at_5000_kwh":2229.36,"at_8000_kwh":3369.66},"marginal_rates":{"excess_unit_cost_cents":38.01,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059379mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059379MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.6},{"plan_id":"agl-agl1059374mbe1eme-electricity","cdr_plan_id":"AGL1059374MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.01,"supply_charge_cents_per_day":90.1,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":38.01},{"volume_kwh":null,"rate_cents_per_kwh":38.01}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1469.17,"at_4000_kwh":1849.26,"at_5000_kwh":2229.36,"at_8000_kwh":3369.66},"marginal_rates":{"excess_unit_cost_cents":38.01,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059374mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059374MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.6},{"plan_id":"1st-energy-1st961477sre1eme-electricity","cdr_plan_id":"1ST961477SRE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"Standing Offer - Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":112,"peak_cents_per_kwh":50,"off_peak_cents_per_kwh":31.5,"shoulder_cents_per_kwh":26.4,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1489.7,"at_4000_kwh":1850,"at_5000_kwh":2210.3,"at_8000_kwh":3291.2},"marginal_rates":{"excess_unit_cost_cents":50,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st961477sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 1ST961477SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions.","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":50},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":31.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":50},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":26.4},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":50}]}]}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.6},{"plan_id":"next-business-nex1044172mbe1eme-electricity","cdr_plan_id":"NEX1044172MBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"Next Assured Bus 15% GTD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":96.5,"peak_cents_per_kwh":46.56,"off_peak_cents_per_kwh":33.86,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.1,"annual_cost_estimates":{"at_3000_kwh":1482.32,"at_4000_kwh":1859.03,"at_5000_kwh":2235.73,"at_8000_kwh":3365.83},"marginal_rates":{"excess_unit_cost_cents":46.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1044172mbe1eme-electricity&source=ai","last_verified":"2026-03-31","source_doc":"CDR EnergyPlanDetailV3 NEX1044172MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT Premium: Single Rate Feed In Tariff","description":"FiT Premium | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"RFIT: Single Rate Feed In Tariff","description":"RFIT | All kWh/day","type":"single","rate_cents_per_kwh":0.1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":7,"hours":"5pm-7:59pm","startHour":17,"endHour":20}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":0,"hours":"10am-2:59pm","startHour":10,"endHour":15}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":0,"endHour":10},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":15,"endHour":17},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":20,"endHour":24}]}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates at any time in accordance with our terms and conditions.","onExpiryDescription":"This contract continues for as long as you choose to remain on the plan.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"CC_PROCESSING","amount":"0.0195","description":"1.95% AMEX credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0195"},{"type":"RECONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0077","description":"0.77% Visa & Mastercard credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0077"},{"type":"OTHER","amount":"77.00","description":"COMMS3 Meter Charge","term":"FIXED"},{"type":"OTHER","amount":"77.00","description":"COMMS4 Meter Charge","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.86},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":46.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.2},{"plan_id":"next-business-nex1044174mbe1eme-electricity","cdr_plan_id":"NEX1044174MBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"Next Assured Bus 15% GTD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":96.5,"peak_cents_per_kwh":46.56,"off_peak_cents_per_kwh":33.86,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.1,"annual_cost_estimates":{"at_3000_kwh":1482.32,"at_4000_kwh":1859.03,"at_5000_kwh":2235.73,"at_8000_kwh":3365.83},"marginal_rates":{"excess_unit_cost_cents":46.56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1044174mbe1eme-electricity&source=ai","last_verified":"2026-03-31","source_doc":"CDR EnergyPlanDetailV3 NEX1044174MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT Premium: Single Rate Feed In Tariff","description":"FiT Premium | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"RFIT: Single Rate Feed In Tariff","description":"RFIT | All kWh/day","type":"single","rate_cents_per_kwh":0.1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":7,"hours":"5pm-7:59pm","startHour":17,"endHour":20}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":0,"hours":"10am-2:59pm","startHour":10,"endHour":15}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":0,"endHour":10},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":15,"endHour":17},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":20,"endHour":24}]}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates at any time in accordance with our terms and conditions.","onExpiryDescription":"This contract continues for as long as you choose to remain on the plan.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"CC_PROCESSING","amount":"0.0195","description":"1.95% AMEX credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0195"},{"type":"RECONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0077","description":"0.77% Visa & Mastercard credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0077"},{"type":"OTHER","amount":"77.00","description":"COMMS3 Meter Charge","term":"FIXED"},{"type":"OTHER","amount":"77.00","description":"COMMS4 Meter Charge","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.86},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":46.56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.2},{"plan_id":"agl-agl238822sre26eme-electricity","cdr_plan_id":"AGL238822SRE26@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Standing Offer - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.61,"peak_cents_per_kwh":51.46,"off_peak_cents_per_kwh":33.45,"shoulder_cents_per_kwh":23.65,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1492.27,"at_4000_kwh":1861.2,"at_5000_kwh":2230.13,"at_8000_kwh":3336.92},"marginal_rates":{"excess_unit_cost_cents":51.46,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl238822sre26eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL238822SRE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.46},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":33.45},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.46},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":23.65},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.46}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.1},{"plan_id":"agl-agl100552sre30eme-electricity","cdr_plan_id":"AGL100552SRE30@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Standing Offer - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.61,"peak_cents_per_kwh":51.46,"off_peak_cents_per_kwh":33.45,"shoulder_cents_per_kwh":23.65,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1492.27,"at_4000_kwh":1861.2,"at_5000_kwh":2230.13,"at_8000_kwh":3336.92},"marginal_rates":{"excess_unit_cost_cents":51.46,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl100552sre30eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL100552SRE30@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.46},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":33.45},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.46},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":23.65},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.46}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.1},{"plan_id":"agl-agl100553sre30eme-electricity","cdr_plan_id":"AGL100553SRE30@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Standing Offer - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.61,"peak_cents_per_kwh":51.46,"off_peak_cents_per_kwh":33.45,"shoulder_cents_per_kwh":23.65,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1492.27,"at_4000_kwh":1861.2,"at_5000_kwh":2230.13,"at_8000_kwh":3336.92},"marginal_rates":{"excess_unit_cost_cents":51.46,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl100553sre30eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL100553SRE30@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.46},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":33.45},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.46},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":23.65},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.46}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.1},{"plan_id":"origin-ori848793mre8eme-electricity","cdr_plan_id":"ORI848793MRE8@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable ePlus - One Big Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.15,"supply_charge_cents_per_day":91.84,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.15},{"volume_kwh":null,"rate_cents_per_kwh":41.23}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1479.72,"at_4000_kwh":1861.22,"at_5000_kwh":2273.52,"at_8000_kwh":3510.42},"marginal_rates":{"excess_unit_cost_cents":38.15,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Efulfillment"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori848793mre8eme-electricity&source=ai","last_verified":"2026-02-13","source_doc":"CDR EnergyPlanDetailV3 ORI848793MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.1},{"plan_id":"origin-ori848787mre8eme-electricity","cdr_plan_id":"ORI848787MRE8@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable ePlus - One Big Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.15,"supply_charge_cents_per_day":91.84,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.15},{"volume_kwh":null,"rate_cents_per_kwh":41.23}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1479.72,"at_4000_kwh":1861.22,"at_5000_kwh":2273.52,"at_8000_kwh":3510.42},"marginal_rates":{"excess_unit_cost_cents":38.15,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Efulfillment"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori848787mre8eme-electricity&source=ai","last_verified":"2026-02-13","source_doc":"CDR EnergyPlanDetailV3 ORI848787MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":19.1},{"plan_id":"origin-ori1057332mbe2eme-electricity","cdr_plan_id":"ORI1057332MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable (New and Moving Customers)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame; New and Moving Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1057332mbe2eme-electricity&source=ai","last_verified":"2026-05-19","source_doc":"CDR EnergyPlanDetailV3 ORI1057332MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$300 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori1057330mbe2eme-electricity","cdr_plan_id":"ORI1057330MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable (New and Moving Customers)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame; New and Moving Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1057330mbe2eme-electricity&source=ai","last_verified":"2026-05-19","source_doc":"CDR EnergyPlanDetailV3 ORI1057330MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$300 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori953079mbe6eme-electricity","cdr_plan_id":"ORI953079MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953079mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953079MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori953028mbe6eme-electricity","cdr_plan_id":"ORI953028MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953028mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953028MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori953050mbe6eme-electricity","cdr_plan_id":"ORI953050MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953050mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953050MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori953031mbe6eme-electricity","cdr_plan_id":"ORI953031MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953031mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953031MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori953082mbe6eme-electricity","cdr_plan_id":"ORI953082MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953082mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953082MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori1020148mbe4eme-electricity","cdr_plan_id":"ORI1020148MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Comparable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020148mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1020148MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori953053mbe6eme-electricity","cdr_plan_id":"ORI953053MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953053mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953053MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori953013mbe6eme-electricity","cdr_plan_id":"ORI953013MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953013mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953013MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori953010mbe6eme-electricity","cdr_plan_id":"ORI953010MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953010mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953010MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori1020159mbe4eme-electricity","cdr_plan_id":"ORI1020159MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Comparable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020159mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1020159MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori988114mbe5eme-electricity","cdr_plan_id":"ORI988114MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - One Click Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988114mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988114MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori988106mbe5eme-electricity","cdr_plan_id":"ORI988106MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Go Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988106mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988106MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori988102mbe5eme-electricity","cdr_plan_id":"ORI988102MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Go Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988102mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988102MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori988112mbe5eme-electricity","cdr_plan_id":"ORI988112MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - One Click Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988112mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988112MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori1007201mbe4eme-electricity","cdr_plan_id":"ORI1007201MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007201mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1007201MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori1007209mbe4eme-electricity","cdr_plan_id":"ORI1007209MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007209mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1007209MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori1018516mbe1eme-electricity","cdr_plan_id":"ORI1018516MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018516mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018516MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori1018511mbe1eme-electricity","cdr_plan_id":"ORI1018511MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018511mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018511MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori430642mbe17eme-electricity","cdr_plan_id":"ORI430642MBE17@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430642mbe17eme-electricity&source=ai","last_verified":"2025-10-23","source_doc":"CDR EnergyPlanDetailV3 ORI430642MBE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"origin-ori430650mbe17eme-electricity","cdr_plan_id":"ORI430650MBE17@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.25,"peak_cents_per_kwh":49.83,"off_peak_cents_per_kwh":32.23,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1491.21,"at_4000_kwh":1866.31,"at_5000_kwh":2241.41,"at_8000_kwh":3366.71},"marginal_rates":{"excess_unit_cost_cents":49.83,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430650mbe17eme-electricity&source=ai","last_verified":"2025-10-23","source_doc":"CDR EnergyPlanDetailV3 ORI430650MBE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.83},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.23},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":32.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.9},{"plan_id":"dodo-dod146947sre10eme-electricity","cdr_plan_id":"DOD146947SRE10@EME","retailer":"Dodo Power & Gas","retailer_slug":"dodo","retailer_logo_uri":"https://s0.2mdn.net/creatives/assets/4983616/Dodo_Logo_Aug23_V1.svg","plan_name":"Residential Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":156.52,"peak_cents_per_kwh":40.92,"off_peak_cents_per_kwh":30.49,"shoulder_cents_per_kwh":25.29,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1548.67,"at_4000_kwh":1874.46,"at_5000_kwh":2200.25,"at_8000_kwh":3177.62},"marginal_rates":{"excess_unit_cost_cents":40.92,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=dodo-dod146947sre10eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 DOD146947SRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"TOU Rate Solar FiT","description":"Solar FIT Scheme (DFIT1) & (DFIT1A)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"Retailer Feed-in Tariff - This plan is available to eligible small solar customers with a maximum 10kW panel size and an inverter system no greater than 10kW as part of an ongoing contract.","type":"single","rate_cents_per_kwh":1}],"terms":"See our Standing terms and conditions at www.dodo.com/energy/terms-prices-and-regulatory-information. If you are eligible, you can apply to the SA Government to receive applicable energy concessions.","variation":"We may vary these prices no more than once every 6 months, and provide you notice of any changes at least 5 business days before the change is effective. We will publish variations on our website and in a newspaper at least 10 business days prior.","onExpiryDescription":"Standing contracts do not expire until you notify us in accordance with our Standing Contract Terms and Conditions.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For further details on the information and fees presented, or the terms and conditions of the contract, please visit www.dodo.com/energy/terms-prices-and-regulatory-information or contact us on 13 dodo (13 36 36).","fees":[{"type":"DD_DISHONOUR","amount":"9.5","description":"Dishonoured Payment fee of $9.50 (inc GST) may apply to payments we attempt that are subsequently declined.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move into a property.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move out of a property.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply when moving into your property and connecting electricity to your property.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":40.92},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.49},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":40.92},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":25.29},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":40.92}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.5},{"plan_id":"lumo-energy-sa-lum763405sbe7eme-electricity","cdr_plan_id":"LUM763405SBE7@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer (Seasonal Demand)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":42.44,"off_peak_cents_per_kwh":23.55,"shoulder_cents_per_kwh":33.12,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Time of Use Seasonal Demand (CENT/kVA/DAY)","description":"Maximum Demand: maximum interval consumption over relevant bill period occurring anytime; Billable Maximum demand is the greater of: Bill Demand from bills within 365 days from the end date of the current bill; Network's Peak Demand values within 365 days from the end date of the current bill","amount_cents_per_kw":13.75,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1564.36,"at_4000_kwh":1875.67,"at_5000_kwh":2186.98,"at_8000_kwh":3120.91},"marginal_rates":{"excess_unit_cost_cents":42.44,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum763405sbe7eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM763405SBE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":23.55},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":33.12},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":42.44},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":23.55}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":23.55},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":42.44},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":23.55}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":23.55},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":33.12},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":23.55}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":23.55}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.5},{"plan_id":"red-energy-red763406sbe6eme-electricity","cdr_plan_id":"RED763406SBE6@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer (Seasonal Demand)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":42.44,"off_peak_cents_per_kwh":23.55,"shoulder_cents_per_kwh":33.12,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Time of Use Seasonal Demand (CENT/kVA/DAY)","description":"Maximum Demand: maximum interval consumption over relevant bill period occurring anytime; Billable Maximum demand is the greater of: Bill Demand from bills within 365 days from the end date of the current bill; Network's Peak Demand values within 365 days from the end date of the current bill","amount_cents_per_kw":13.75,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1564.36,"at_4000_kwh":1875.67,"at_5000_kwh":2186.98,"at_8000_kwh":3120.91},"marginal_rates":{"excess_unit_cost_cents":42.44,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red763406sbe6eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED763406SBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FiT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":23.55},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":33.12},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":42.44},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":23.55}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":23.55},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":42.44},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":23.55}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":23.55},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":33.12},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":23.55}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":23.55}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.5},{"plan_id":"1st-energy-1st1042498mbe1eme-electricity","cdr_plan_id":"1ST1042498MBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Ruby - Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":115,"peak_cents_per_kwh":51.1,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1511.75,"at_4000_kwh":1875.75,"at_5000_kwh":2239.75,"at_8000_kwh":3331.75},"marginal_rates":{"excess_unit_cost_cents":51.1,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042498mbe1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042498MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.1},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":51.1},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.1}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.1}]}]}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.5},{"plan_id":"1st-energy-1st1042499mbe1eme-electricity","cdr_plan_id":"1ST1042499MBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Ruby - Time of Use + Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":115,"peak_cents_per_kwh":51.1,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1511.75,"at_4000_kwh":1875.75,"at_5000_kwh":2239.75,"at_8000_kwh":3331.75},"marginal_rates":{"excess_unit_cost_cents":51.1,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042499mbe1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042499MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.1},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":51.1},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.1}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.1}]}]}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.5},{"plan_id":"blue-nrg-blu1043594mbe1eme-electricity","cdr_plan_id":"BLU1043594MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Zembl Edge","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.03,"supply_charge_cents_per_day":97.24},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1495.83,"at_4000_kwh":1876.13,"at_5000_kwh":2256.43,"at_8000_kwh":3397.33},"marginal_rates":{"excess_unit_cost_cents":38.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1043594mbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 BLU1043594MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due date","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.5},{"plan_id":"flipped-fea1059483mre1eme-electricity","cdr_plan_id":"FEA1059483MRE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Anytime Switched On! Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":37.24,"supply_charge_cents_per_day":106.3},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1505.2,"at_4000_kwh":1877.59,"at_5000_kwh":2250,"at_8000_kwh":3367.2},"marginal_rates":{"excess_unit_cost_cents":37.24,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059483mre1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059483MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.4},{"plan_id":"agl-agl1055714mre1eme-electricity","cdr_plan_id":"AGL1055714MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055714mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055714MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055710mre1eme-electricity","cdr_plan_id":"AGL1055710MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055710mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055710MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055684mre1eme-electricity","cdr_plan_id":"AGL1055684MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055684mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055684MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"3,000 Velocity Points","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055674mre1eme-electricity","cdr_plan_id":"AGL1055674MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055674mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055674MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055678mre1eme-electricity","cdr_plan_id":"AGL1055678MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055678mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055678MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055692mre1eme-electricity","cdr_plan_id":"AGL1055692MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055692mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055692MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $50 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $50 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055690mre1eme-electricity","cdr_plan_id":"AGL1055690MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055690mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055690MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $50 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $50 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055682mre1eme-electricity","cdr_plan_id":"AGL1055682MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055682mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055682MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055686mre1eme-electricity","cdr_plan_id":"AGL1055686MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055686mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055686MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"3,000 Velocity Points","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055679mre1eme-electricity","cdr_plan_id":"AGL1055679MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055679mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055679MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055653mre1eme-electricity","cdr_plan_id":"AGL1055653MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac New to AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer; New to AGL & Move-in customers"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055653mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055653MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055647mre1eme-electricity","cdr_plan_id":"AGL1055647MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055647mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055647MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Sign-Up Velocity Points:20,000","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses. Offer ends on 30/06/26."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055648mre1eme-electricity","cdr_plan_id":"AGL1055648MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055648mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055648MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Sign-Up Velocity Points:20,000","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses. Offer ends on 30/06/26."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055639mre1eme-electricity","cdr_plan_id":"AGL1055639MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055639mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055639MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055651mre1eme-electricity","cdr_plan_id":"AGL1055651MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac New to AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer; New to AGL & Move-in customers"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055651mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055651MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055637mre1eme-electricity","cdr_plan_id":"AGL1055637MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055637mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055637MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055642mre1eme-electricity","cdr_plan_id":"AGL1055642MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055642mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055642MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl1055640mre1eme-electricity","cdr_plan_id":"AGL1055640MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055640mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055640MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl726434mre31eme-electricity","cdr_plan_id":"AGL726434MRE31@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl726434mre31eme-electricity&source=ai","last_verified":"2026-04-20","source_doc":"CDR EnergyPlanDetailV3 AGL726434MRE31@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Sign-Up Velocity Points:20,000","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses. Offer ends on 30/06/26."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl726437mre31eme-electricity","cdr_plan_id":"AGL726437MRE31@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl726437mre31eme-electricity&source=ai","last_verified":"2026-04-20","source_doc":"CDR EnergyPlanDetailV3 AGL726437MRE31@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Sign-Up Velocity Points:20,000","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses. Offer ends on 30/06/26."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl907796mre6eme-electricity","cdr_plan_id":"AGL907796MRE6@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907796mre6eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907796MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl907770mre7eme-electricity","cdr_plan_id":"AGL907770MRE7@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907770mre7eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907770MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl907779mre8eme-electricity","cdr_plan_id":"AGL907779MRE8@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907779mre8eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907779MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl907768mre7eme-electricity","cdr_plan_id":"AGL907768MRE7@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907768mre7eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907768MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl907792mre8eme-electricity","cdr_plan_id":"AGL907792MRE8@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only)"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907792mre8eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907792MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl907789mre6eme-electricity","cdr_plan_id":"AGL907789MRE6@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907789mre6eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL907789MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl898817mre7eme-electricity","cdr_plan_id":"AGL898817MRE7@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898817mre7eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898817MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl827775mre10eme-electricity","cdr_plan_id":"AGL827775MRE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl827775mre10eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL827775MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl898819mre7eme-electricity","cdr_plan_id":"AGL898819MRE7@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel New To AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New AGL Customers (only); BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898819mre7eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898819MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl827770mre10eme-electricity","cdr_plan_id":"AGL827770MRE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - BP Fuel","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"BP Rewards Member"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl827770mre10eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL827770MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Prepaid Visa","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Visa per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl726432mre22eme-electricity","cdr_plan_id":"AGL726432MRE22@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl726432mre22eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL726432MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"3,000 Velocity Points","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl726427mre22eme-electricity","cdr_plan_id":"AGL726427MRE22@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Velocity (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Velocity members"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl726427mre22eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL726427MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"3,000 Velocity Points","description":"Eligibility criteria and Terms & Conditions  apply. Points in T&Cs. Limit per customer: One Offer per fuel and a maximum of two supply addresses"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl733561mre21eme-electricity","cdr_plan_id":"AGL733561MRE21@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac New to AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer; New to AGL & Move-in customers"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl733561mre21eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL733561MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl733557mre21eme-electricity","cdr_plan_id":"AGL733557MRE21@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac New to AGL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer; New to AGL & Move-in customers"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl733557mre21eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL733557MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $100 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $100 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl360644mre36eme-electricity","cdr_plan_id":"AGL360644MRE36@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl360644mre36eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL360644MRE36@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $50 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $50 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"agl-agl360642mre36eme-electricity","cdr_plan_id":"AGL360642MRE36@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Smart Saver - Westpac (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":95.04,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1498.3,"at_4000_kwh":1882.1,"at_5000_kwh":2265.9,"at_8000_kwh":3417.3},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You're a Westpac customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl360642mre36eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL360642MRE36@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Bonus $50 Digital Mastercard","description":"Remain with AGL for at least 30 days from sign up to receive one $50 Prepaid Digital Mastercard per customer"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori1054224mre1eme-electricity","cdr_plan_id":"ORI1054224MRE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Variable - New and Moving Customers only","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New and Moving Customers Only; Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1054224mre1eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 ORI1054224MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"One credit per electricity account. If this Origin Go Variable electricity plan is still active with the customer on 30 June 2026, $100 (Incl. GST) credit will be applied to the customer's electricity account after that date. If the customer ends this Origin Go Variable electricity plan before that date, the customer will not receive any credit. Credit is not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori1054209mre1eme-electricity","cdr_plan_id":"ORI1054209MRE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Variable - New and Moving Customers only","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"New and Moving Customers Only; Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1054209mre1eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 ORI1054209MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"One credit per electricity account. If this Origin Go Variable electricity plan is still active with the customer on 30 June 2026, $100 (Incl. GST) credit will be applied to the customer's electricity account after that date. If the customer ends this Origin Go Variable electricity plan before that date, the customer will not receive any credit. Credit is not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori733569mre13eme-electricity","cdr_plan_id":"ORI733569MRE13@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Compare Club","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori733569mre13eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 ORI733569MRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori733590mre13eme-electricity","cdr_plan_id":"ORI733590MRE13@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Compare Club","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori733590mre13eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 ORI733590MRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori909015mre6eme-electricity","cdr_plan_id":"ORI909015MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - One Click Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori909015mre6eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI909015MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori909023mre6eme-electricity","cdr_plan_id":"ORI909023MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - One Click Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori909023mre6eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI909023MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori997830mre3eme-electricity","cdr_plan_id":"ORI997830MRE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Residential Connections","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori997830mre3eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI997830MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori997829mre3eme-electricity","cdr_plan_id":"ORI997829MRE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Residential Connections","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori997829mre3eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI997829MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori724781mre11eme-electricity","cdr_plan_id":"ORI724781MRE11@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - My Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori724781mre11eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI724781MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori724734mre11eme-electricity","cdr_plan_id":"ORI724734MRE11@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - My Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori724734mre11eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI724734MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori539506mre21eme-electricity","cdr_plan_id":"ORI539506MRE21@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - iSelect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539506mre21eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539506MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori539482mre21eme-electricity","cdr_plan_id":"ORI539482MRE21@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - iSelect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539482mre21eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539482MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori539428mre22eme-electricity","cdr_plan_id":"ORI539428MRE22@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Go Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539428mre22eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539428MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori539383mre22eme-electricity","cdr_plan_id":"ORI539383MRE22@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Go Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539383mre22eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539383MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori539308mre22eme-electricity","cdr_plan_id":"ORI539308MRE22@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539308mre22eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539308MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori539294mre22eme-electricity","cdr_plan_id":"ORI539294MRE22@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539294mre22eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539294MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori539137mre21eme-electricity","cdr_plan_id":"ORI539137MRE21@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Compare the Market","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539137mre21eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539137MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori539146mre21eme-electricity","cdr_plan_id":"ORI539146MRE21@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Compare the Market","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori539146mre21eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI539146MRE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori1020043mre2eme-electricity","cdr_plan_id":"ORI1020043MRE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Comparable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020043mre2eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI1020043MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori1020022mre2eme-electricity","cdr_plan_id":"ORI1020022MRE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Affinity Variable - Comparable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020022mre2eme-electricity&source=ai","last_verified":"2025-12-18","source_doc":"CDR EnergyPlanDetailV3 ORI1020022MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori1002466mre2eme-electricity","cdr_plan_id":"ORI1002466MRE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1002466mre2eme-electricity&source=ai","last_verified":"2025-10-15","source_doc":"CDR EnergyPlanDetailV3 ORI1002466MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"origin-ori1002465mre2eme-electricity","cdr_plan_id":"ORI1002465MRE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.58,"supply_charge_cents_per_day":92.87,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":38.58},{"volume_kwh":null,"rate_cents_per_kwh":41.7}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1496.38,"at_4000_kwh":1882.18,"at_5000_kwh":2299.18,"at_8000_kwh":3550.18},"marginal_rates":{"excess_unit_cost_cents":38.58,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1002465mre2eme-electricity&source=ai","last_verified":"2025-10-15","source_doc":"CDR EnergyPlanDetailV3 ORI1002465MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.2},{"plan_id":"globird-glo1054004mre1eme-electricity","cdr_plan_id":"GLO1054004MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"BOOST Residential (Flexible Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":137,"peak_cents_per_kwh":45.1,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":30.1,"peak_hours":"3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1538.05,"at_4000_kwh":1884.05,"at_5000_kwh":2230.05,"at_8000_kwh":3268.05},"marginal_rates":{"excess_unit_cost_cents":45.1,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054004mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054004MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers with an applicable network tariff. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":45.1},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":45.1},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":45.1}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"globird-glo1054003mre1eme-electricity","cdr_plan_id":"GLO1054003MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"BOOST Residential (Flexible Rate CTL)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":137,"peak_cents_per_kwh":45.1,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":30.1,"peak_hours":"3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1538.05,"at_4000_kwh":1884.05,"at_5000_kwh":2230.05,"at_8000_kwh":3268.05},"marginal_rates":{"excess_unit_cost_cents":45.1,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054003mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054003MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers with an applicable network tariff. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":45.1},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.1},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":45.1},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.1},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":45.1}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"agl-agl1041980mbe1eme-electricity","cdr_plan_id":"AGL1041980MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.68,"peak_cents_per_kwh":44.64,"off_peak_cents_per_kwh":30.86,"shoulder_cents_per_kwh":37.75,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1520.69,"at_4000_kwh":1884.41,"at_5000_kwh":2248.13,"at_8000_kwh":3339.29},"marginal_rates":{"excess_unit_cost_cents":44.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1041980mbe1eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL1041980MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.75},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"agl-agl1041982mbe1eme-electricity","cdr_plan_id":"AGL1041982MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.68,"peak_cents_per_kwh":44.64,"off_peak_cents_per_kwh":30.86,"shoulder_cents_per_kwh":37.75,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1520.69,"at_4000_kwh":1884.41,"at_5000_kwh":2248.13,"at_8000_kwh":3339.29},"marginal_rates":{"excess_unit_cost_cents":44.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1041982mbe1eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL1041982MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.75},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"agl-agl1041984mbe1eme-electricity","cdr_plan_id":"AGL1041984MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.68,"peak_cents_per_kwh":44.64,"off_peak_cents_per_kwh":30.86,"shoulder_cents_per_kwh":37.75,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1520.69,"at_4000_kwh":1884.41,"at_5000_kwh":2248.13,"at_8000_kwh":3339.29},"marginal_rates":{"excess_unit_cost_cents":44.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1041984mbe1eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL1041984MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.75},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"agl-agl907778mbe4eme-electricity","cdr_plan_id":"AGL907778MBE4@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - 3rd Party (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.68,"peak_cents_per_kwh":44.64,"off_peak_cents_per_kwh":30.86,"shoulder_cents_per_kwh":37.75,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1520.69,"at_4000_kwh":1884.41,"at_5000_kwh":2248.13,"at_8000_kwh":3339.29},"marginal_rates":{"excess_unit_cost_cents":44.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907778mbe4eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 AGL907778MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.75},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"agl-agl907782mbe4eme-electricity","cdr_plan_id":"AGL907782MBE4@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - 3rd Party (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.68,"peak_cents_per_kwh":44.64,"off_peak_cents_per_kwh":30.86,"shoulder_cents_per_kwh":37.75,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1520.69,"at_4000_kwh":1884.41,"at_5000_kwh":2248.13,"at_8000_kwh":3339.29},"marginal_rates":{"excess_unit_cost_cents":44.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907782mbe4eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 AGL907782MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.75},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"agl-agl907777mbe4eme-electricity","cdr_plan_id":"AGL907777MBE4@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - 3rd Party (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.68,"peak_cents_per_kwh":44.64,"off_peak_cents_per_kwh":30.86,"shoulder_cents_per_kwh":37.75,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1520.69,"at_4000_kwh":1884.41,"at_5000_kwh":2248.13,"at_8000_kwh":3339.29},"marginal_rates":{"excess_unit_cost_cents":44.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907777mbe4eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 AGL907777MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.75},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"agl-agl907793mbe3eme-electricity","cdr_plan_id":"AGL907793MBE3@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.68,"peak_cents_per_kwh":44.64,"off_peak_cents_per_kwh":30.86,"shoulder_cents_per_kwh":37.75,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1520.69,"at_4000_kwh":1884.41,"at_5000_kwh":2248.13,"at_8000_kwh":3339.29},"marginal_rates":{"excess_unit_cost_cents":44.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907793mbe3eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL907793MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.75},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"agl-agl907795mbe3eme-electricity","cdr_plan_id":"AGL907795MBE3@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.68,"peak_cents_per_kwh":44.64,"off_peak_cents_per_kwh":30.86,"shoulder_cents_per_kwh":37.75,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1520.69,"at_4000_kwh":1884.41,"at_5000_kwh":2248.13,"at_8000_kwh":3339.29},"marginal_rates":{"excess_unit_cost_cents":44.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907795mbe3eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL907795MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.75},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"agl-agl907774mbe3eme-electricity","cdr_plan_id":"AGL907774MBE3@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":117.68,"peak_cents_per_kwh":44.64,"off_peak_cents_per_kwh":30.86,"shoulder_cents_per_kwh":37.75,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1520.69,"at_4000_kwh":1884.41,"at_5000_kwh":2248.13,"at_8000_kwh":3339.29},"marginal_rates":{"excess_unit_cost_cents":44.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907774mbe3eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL907774MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.75},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.75},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18.1},{"plan_id":"diamond-dia933996mre3eme-electricity","cdr_plan_id":"DIA933996MRE3@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday - T73","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":99.45,"peak_cents_per_kwh":49.5,"off_peak_cents_per_kwh":36.5,"shoulder_cents_per_kwh":24.89,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1505.33,"at_4000_kwh":1886.11,"at_5000_kwh":2266.89,"at_8000_kwh":3409.23},"marginal_rates":{"excess_unit_cost_cents":49.5,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia933996mre3eme-electricity&source=ai","last_verified":"2025-10-24","source_doc":"CDR EnergyPlanDetailV3 DIA933996MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. Full terms & conditions and solar feed in tariff eligibility available on our website. Ongoing discounts of 2% to daily supply and consumption charges for each customer / property you refer for period referee stays with us. Discounts are additive. Pay on Time conditions apply. Your friend also receives $35 (incl. GST) sign up credit.","variation":"We may vary the charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":36.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.5},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":24.89},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18},{"plan_id":"diamond-dia786881mre4eme-electricity","cdr_plan_id":"DIA786881MRE4@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday - T73","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":99.45,"peak_cents_per_kwh":49.5,"off_peak_cents_per_kwh":36.5,"shoulder_cents_per_kwh":24.89,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1505.33,"at_4000_kwh":1886.11,"at_5000_kwh":2266.89,"at_8000_kwh":3409.23},"marginal_rates":{"excess_unit_cost_cents":49.5,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia786881mre4eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 DIA786881MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. Full terms & conditions and solar feed in tariff eligibility available on our website. Ongoing discounts of 2% to daily supply and consumption charges for each customer / property you refer for period referee stays with us. Discounts are additive. Pay on Time conditions apply. Your friend also receives $35 (incl. GST) sign up credit.","variation":"We may vary the charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":36.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":49.5},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":24.89},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":49.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":18},{"plan_id":"radian-ior1009968mre1eme-electricity","cdr_plan_id":"IOR1009968MRE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Sustainable Home: RESELE","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":150,"peak_cents_per_kwh":77.27,"off_peak_cents_per_kwh":7.27,"shoulder_cents_per_kwh":33.64,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"6am-8:59am mon, tue, wed, thu, fri, sat, sun · 12am-5:59am mon, tue, wed, thu, fri, sat, sun; 9am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1553.82,"at_4000_kwh":1889.26,"at_5000_kwh":2224.7,"at_8000_kwh":3231.02},"marginal_rates":{"excess_unit_cost_cents":77.27,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009968mre1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009968MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Off-peak","description":"Daytime Usage - Everyday - 10:00am–3:59pm","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":-2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Peak","description":"Evening Usage - Everyday - 6:00pm–8:59pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":30,"hours":"6pm-8:59pm","startHour":18,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Shoulder","description":"Other Usage - Everyday - All other times","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":0,"endHour":10},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":16,"endHour":18},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":21,"endHour":24}]}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER2","startHour":0,"endHour":6,"rateCents":33.64},{"type":"SHOULDER1","startHour":6,"endHour":9,"rateCents":33.64},{"type":"SHOULDER2","startHour":9,"endHour":10,"rateCents":33.64},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":7.27},{"type":"SHOULDER2","startHour":16,"endHour":17,"rateCents":33.64},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":77.27},{"type":"SHOULDER2","startHour":21,"endHour":24,"rateCents":33.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.9},{"plan_id":"radian-ior1009961mre1eme-electricity","cdr_plan_id":"IOR1009961MRE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Sustainable Home: RESELECL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":150,"peak_cents_per_kwh":77.27,"off_peak_cents_per_kwh":7.27,"shoulder_cents_per_kwh":33.64,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"6am-8:59am mon, tue, wed, thu, fri, sat, sun · 12am-5:59am mon, tue, wed, thu, fri, sat, sun; 9am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1553.82,"at_4000_kwh":1889.26,"at_5000_kwh":2224.7,"at_8000_kwh":3231.02},"marginal_rates":{"excess_unit_cost_cents":77.27,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009961mre1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009961MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Off-peak","description":"Daytime Usage - Everyday - 10:00am–3:59pm","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":-2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Peak","description":"Evening Usage - Everyday - 6:00pm–8:59pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":30,"hours":"6pm-8:59pm","startHour":18,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Shoulder","description":"Other Usage - Everyday - All other times","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":0,"endHour":10},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":16,"endHour":18},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":21,"endHour":24}]}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER2","startHour":0,"endHour":6,"rateCents":33.64},{"type":"SHOULDER1","startHour":6,"endHour":9,"rateCents":33.64},{"type":"SHOULDER2","startHour":9,"endHour":10,"rateCents":33.64},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":7.27},{"type":"SHOULDER2","startHour":16,"endHour":17,"rateCents":33.64},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":77.27},{"type":"SHOULDER2","startHour":21,"endHour":24,"rateCents":33.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.9},{"plan_id":"origin-ori1019994mre1eme-electricity","cdr_plan_id":"ORI1019994MRE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Solar Boost","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1019994mre1eme-electricity&source=ai","last_verified":"2025-11-20","source_doc":"CDR EnergyPlanDetailV3 ORI1019994MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 8 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori1020000mre1eme-electricity","cdr_plan_id":"ORI1020000MRE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Solar Boost","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020000mre1eme-electricity&source=ai","last_verified":"2025-11-20","source_doc":"CDR EnergyPlanDetailV3 ORI1020000MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 8 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori848686mre7eme-electricity","cdr_plan_id":"ORI848686MRE7@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Solar Partner Plus","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":12,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system; Solar System"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori848686mre7eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI848686MRE7@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 12 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":12},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori848688mre6eme-electricity","cdr_plan_id":"ORI848688MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Solar Partner Plus","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":12,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system; Solar System"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori848688mre6eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI848688MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 12 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":12},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori474159mre16eme-electricity","cdr_plan_id":"ORI474159MRE16@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Home Support","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori474159mre16eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI474159MRE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"AGA EHA Program Membership","description":"You will receive an Emergency Home Assistance Program membership provided to you by Allianz Global Assistance for the 12 month benefit period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori474143mre15eme-electricity","cdr_plan_id":"ORI474143MRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Home Support","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori474143mre15eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI474143MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"AGA EHA Program Membership","description":"You will receive an Emergency Home Assistance Program membership provided to you by Allianz Global Assistance for the 12 month benefit period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori698164mre6eme-electricity","cdr_plan_id":"ORI698164MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Essentials Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori698164mre6eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI698164MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"AGA EHA Program Membership","description":"You will receive an Emergency Home Assistance Program membership provided to you by Allianz Global Assistance for the 12 month benefit period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori698152mre6eme-electricity","cdr_plan_id":"ORI698152MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Essentials Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori698152mre6eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI698152MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"AGA EHA Program Membership","description":"You will receive an Emergency Home Assistance Program membership provided to you by Allianz Global Assistance for the 12 month benefit period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori429277sre15eme-electricity","cdr_plan_id":"ORI429277SRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429277sre15eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429277SRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori429276sre15eme-electricity","cdr_plan_id":"ORI429276SRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429276sre15eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429276SRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori429202mre15eme-electricity","cdr_plan_id":"ORI429202MRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429202mre15eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429202MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori429201mre15eme-electricity","cdr_plan_id":"ORI429201MRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429201mre15eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429201MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"origin-ori429210mre15eme-electricity","cdr_plan_id":"ORI429210MRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.5,"peak_cents_per_kwh":54.23,"off_peak_cents_per_kwh":32.03,"shoulder_cents_per_kwh":26.75,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1514.1,"at_4000_kwh":1890.44,"at_5000_kwh":2266.78,"at_8000_kwh":3395.79},"marginal_rates":{"excess_unit_cost_cents":54.23,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429210mre15eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429210MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.03},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":54.23},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":26.75},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":54.23}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.8},{"plan_id":"engie-eng1053730mre1eme-electricity","cdr_plan_id":"ENG1053730MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA _ENGIE Perks Plus Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1053730mre1eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 ENG1053730MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"My NRMA Membership","description":"Your My NRMA membership will be complimentary, a program that helps inspire you to explore new places and experiences, great deals on fuel, shopping, travel, entertainment and more along the way."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1053731mre1eme-electricity","cdr_plan_id":"ENG1053731MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA _ENGIE Perks Plus Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1053731mre1eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 ENG1053731MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"My NRMA Membership","description":"Your My NRMA membership will be complimentary, a program that helps inspire you to explore new places and experiences, great deals on fuel, shopping, travel, entertainment and more along the way."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048448mre2eme-electricity","cdr_plan_id":"ENG1048448MRE2@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA -ENGIE VPP Advantage Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Internet"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048448mre2eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048448MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE VPP Credits","description":"Receive $200 (GST exempt) sign-up credit as well as approx $20 monthly credit per battery for participating in our VPP, which is calculated by multiplying 0.657534c (GST exempt) by the number of days in a month applied on your next bill."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048447mre2eme-electricity","cdr_plan_id":"ENG1048447MRE2@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA -ENGIE VPP Advantage Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Internet"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048447mre2eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048447MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE VPP Credits","description":"Receive $200 (GST exempt) sign-up credit as well as approx $20 monthly credit per battery for participating in our VPP, which is calculated by multiplying 0.657534c (GST exempt) by the number of days in a month applied on your next bill."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048984mre1eme-electricity","cdr_plan_id":"ENG1048984MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048984mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048984MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048989mre1eme-electricity","cdr_plan_id":"ENG1048989MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE SOHO Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048989mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048989MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048990mre1eme-electricity","cdr_plan_id":"ENG1048990MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE SOHO Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048990mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048990MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048985mre1eme-electricity","cdr_plan_id":"ENG1048985MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048985mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048985MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048299mre1eme-electricity","cdr_plan_id":"ENG1048299MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Home Business Flyer Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048299mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048299MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Velocity Points","description":"You'll receive an upfront bonus of 15,000 Velocity Points, and then you'll receive 3 Velocity Points for every $1 you pay for electricity."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048298mre1eme-electricity","cdr_plan_id":"ENG1048298MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Home Business Flyer Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048298mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048298MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Velocity Points","description":"You'll receive an upfront bonus of 15,000 Velocity Points, and then you'll receive 3 Velocity Points for every $1 you pay for electricity."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048198mre1eme-electricity","cdr_plan_id":"ENG1048198MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048198mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048198MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048197mre1eme-electricity","cdr_plan_id":"ENG1048197MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048197mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048197MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048888mre1eme-electricity","cdr_plan_id":"ENG1048888MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA _ ENGIE Solar Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048888mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048888MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048889mre1eme-electricity","cdr_plan_id":"ENG1048889MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA _ ENGIE Solar Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048889mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048889MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048883mre1eme-electricity","cdr_plan_id":"ENG1048883MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Movie Perks Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048883mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048883MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Movie tickets","description":"With ENGIE Movie Perks, you can enjoy movie tickets, two when you join and two more every six months. You will also get access to exclusive offers on additional tickets, food and beverages, all while enjoying great value on your electricity."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048884mre1eme-electricity","cdr_plan_id":"ENG1048884MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Movie Perks Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048884mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048884MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Movie tickets","description":"With ENGIE Movie Perks, you can enjoy movie tickets, two when you join and two more every six months. You will also get access to exclusive offers on additional tickets, food and beverages, all while enjoying great value on your electricity."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1049594mre1eme-electricity","cdr_plan_id":"ENG1049594MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Home Business GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049594mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049594MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1049593mre1eme-electricity","cdr_plan_id":"ENG1049593MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Home Business GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049593mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049593MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1049409mre1eme-electricity","cdr_plan_id":"ENG1049409MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE EV Flex Charge Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric vehicle"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049409mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049409MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Flex Charge","description":"Get the flexibility of charging when you're out or at home. Receive a prepaid $100 Chargefox public charging voucher for when you're out, and from 12am to 6am AEST we'll credit back 10c per kwh of energy you use at home."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1049408mre1eme-electricity","cdr_plan_id":"ENG1049408MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE EV Flex Charge Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric vehicle"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049408mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049408MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Flex Charge","description":"Get the flexibility of charging when you're out or at home. Receive a prepaid $100 Chargefox public charging voucher for when you're out, and from 12am to 6am AEST we'll credit back 10c per kwh of energy you use at home."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1047809mre1eme-electricity","cdr_plan_id":"ENG1047809MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1047809mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1047809MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1047808mre1eme-electricity","cdr_plan_id":"ENG1047808MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1047808mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1047808MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1047788mre1eme-electricity","cdr_plan_id":"ENG1047788MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Seniors Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1047788mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1047788MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1047787mre1eme-electricity","cdr_plan_id":"ENG1047787MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Seniors Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1047787mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1047787MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng938049sre4eme-electricity","cdr_plan_id":"ENG938049SRE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng938049sre4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG938049SRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng938050sre4eme-electricity","cdr_plan_id":"ENG938050SRE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng938050sre4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG938050SRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048573mre1eme-electricity","cdr_plan_id":"ENG1048573MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Perks Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048573mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048573MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"My NRMA membership","description":"Your My NRMA membership will be complimentary, a program that helps inspire you to explore new places and experiences, great deals on fuel, shopping, travel, entertainment and more along the way."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048605mre1eme-electricity","cdr_plan_id":"ENG1048605MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048605mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048605MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048606mre1eme-electricity","cdr_plan_id":"ENG1048606MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048606mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048606MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048574mre1eme-electricity","cdr_plan_id":"ENG1048574MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Perks Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048574mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048574MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"My NRMA membership","description":"Your My NRMA membership will be complimentary, a program that helps inspire you to explore new places and experiences, great deals on fuel, shopping, travel, entertainment and more along the way."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048509mre1eme-electricity","cdr_plan_id":"ENG1048509MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048509mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048509MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1048508mre1eme-electricity","cdr_plan_id":"ENG1048508MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048508mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048508MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1049179mre1eme-electricity","cdr_plan_id":"ENG1049179MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049179mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049179MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng1049180mre1eme-electricity","cdr_plan_id":"ENG1049180MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049180mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049180MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng937896sre4eme-electricity","cdr_plan_id":"ENG937896SRE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng937896sre4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG937896SRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.ENGIE.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"engie-eng937897sre4eme-electricity","cdr_plan_id":"ENG937897SRE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.95,"peak_cents_per_kwh":51.12,"off_peak_cents_per_kwh":35.86,"shoulder_cents_per_kwh":18.53,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1525.08,"at_4000_kwh":1894.8,"at_5000_kwh":2264.52,"at_8000_kwh":3373.68},"marginal_rates":{"excess_unit_cost_cents":51.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng937897sre4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG937897SRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.ENGIE.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":51.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":51.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":18.53},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":51.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.7},{"plan_id":"flipped-fea1059527sre1eme-electricity","cdr_plan_id":"FEA1059527SRE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Freedom Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":182.08,"peak_cents_per_kwh":57.62,"off_peak_cents_per_kwh":12.79,"shoulder_cents_per_kwh":35.99,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9am-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"9pm-8:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1590.96,"at_4000_kwh":1899.75,"at_5000_kwh":2208.54,"at_8000_kwh":3134.91},"marginal_rates":{"excess_unit_cost_cents":57.62,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059527sre1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059527SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":9,"rateCents":35.99},{"type":"OFF_PEAK","startHour":9,"endHour":17,"rateCents":12.79},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.62},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":35.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.4},{"plan_id":"radian-ior1009959mre1eme-electricity","cdr_plan_id":"IOR1009959MRE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Sustainable Home: RTOUCL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":150,"peak_cents_per_kwh":52.73,"off_peak_cents_per_kwh":32.73,"shoulder_cents_per_kwh":9.09,"peak_hours":"12am-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1567.56,"at_4000_kwh":1907.58,"at_5000_kwh":2247.6,"at_8000_kwh":3267.66},"marginal_rates":{"excess_unit_cost_cents":52.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009959mre1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009959MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Off-peak","description":"Daytime Usage - Everyday - 10:00am–3:59pm","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":-2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Peak","description":"Evening Usage - Everyday - 6:00pm–8:59pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":30,"hours":"6pm-8:59pm","startHour":18,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Shoulder","description":"Other Usage - Everyday - All other times","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":0,"endHour":10},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":16,"endHour":18},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":21,"endHour":24}]}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":52.73},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.73},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":52.73},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":9.09},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":52.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"radian-ior1009960mre1eme-electricity","cdr_plan_id":"IOR1009960MRE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Sustainable Home: RTOU","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":150,"peak_cents_per_kwh":52.73,"off_peak_cents_per_kwh":32.73,"shoulder_cents_per_kwh":9.09,"peak_hours":"12am-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1567.56,"at_4000_kwh":1907.58,"at_5000_kwh":2247.6,"at_8000_kwh":3267.66},"marginal_rates":{"excess_unit_cost_cents":52.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009960mre1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009960MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Off-peak","description":"Daytime Usage - Everyday - 10:00am–3:59pm","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":-2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Peak","description":"Evening Usage - Everyday - 6:00pm–8:59pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":30,"hours":"6pm-8:59pm","startHour":18,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Shoulder","description":"Other Usage - Everyday - All other times","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":0,"endHour":10},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":16,"endHour":18},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":21,"endHour":24}]}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":52.73},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.73},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":52.73},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":9.09},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":52.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"ovo-energy-ovo704519mre20eme-electricity","cdr_plan_id":"OVO704519MRE20@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The One Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":134,"peak_cents_per_kwh":42.6,"off_peak_cents_per_kwh":33.7,"shoulder_cents_per_kwh":29.2,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1553.2,"at_4000_kwh":1907.9,"at_5000_kwh":2262.6,"at_8000_kwh":3326.7},"marginal_rates":{"excess_unit_cost_cents":42.6,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704519mre20eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704519MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 5","Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":42.6},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":33.7},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":42.6},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":29.2},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":42.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"ovo-energy-ovo704518mre20eme-electricity","cdr_plan_id":"OVO704518MRE20@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The One Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":134,"peak_cents_per_kwh":42.6,"off_peak_cents_per_kwh":33.7,"shoulder_cents_per_kwh":29.2,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1553.2,"at_4000_kwh":1907.9,"at_5000_kwh":2262.6,"at_8000_kwh":3326.7},"marginal_rates":{"excess_unit_cost_cents":42.6,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704518mre20eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704518MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 5","Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":42.6},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":33.7},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":42.6},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":29.2},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":42.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl1055716mre1eme-electricity","cdr_plan_id":"AGL1055716MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - 3rd Party No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055716mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055716MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl1055715mre1eme-electricity","cdr_plan_id":"AGL1055715MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - 3rd Party No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055715mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055715MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl1055704mre1eme-electricity","cdr_plan_id":"AGL1055704MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055704mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055704MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl1055700mre1eme-electricity","cdr_plan_id":"AGL1055700MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055700mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055700MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl1055662mre1eme-electricity","cdr_plan_id":"AGL1055662MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; New AGL Customers (only); Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055662mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055662MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl1055660mre1eme-electricity","cdr_plan_id":"AGL1055660MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; New AGL Customers (only); Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055660mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055660MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl898844mre9eme-electricity","cdr_plan_id":"AGL898844MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; New AGL Customers (only); Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898844mre9eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898844MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl898845mre9eme-electricity","cdr_plan_id":"AGL898845MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; New AGL Customers (only); Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898845mre9eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898845MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl840899mre11eme-electricity","cdr_plan_id":"AGL840899MRE11@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - 3rd Party No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl840899mre11eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL840899MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl840898mre11eme-electricity","cdr_plan_id":"AGL840898MRE11@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - 3rd Party No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl840898mre11eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL840898MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃ¢â‚¬â„¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl686238mre23eme-electricity","cdr_plan_id":"AGL686238MRE23@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl686238mre23eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL686238MRE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"agl-agl686234mre23eme-electricity","cdr_plan_id":"AGL686234MRE23@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Netflix Plan - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.38,"supply_charge_cents_per_day":102.26,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":38.38},{"volume_kwh":null,"rate_cents_per_kwh":38.38}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.65,"at_4000_kwh":1908.45,"at_5000_kwh":2292.25,"at_8000_kwh":3443.65},"marginal_rates":{"excess_unit_cost_cents":38.38,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Eligible Residential Customers; Mandatory eBilling"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl686234mre23eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL686234MRE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Netflix Standard with ads","description":"Netflix Standard with ads is included in this plan. Optional: upgrade your Netflix tier to Standard or Premium at an additional cost"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17.1},{"plan_id":"sumo-sum1034965sre1eme-electricity","cdr_plan_id":"SUM1034965SRE1@EME","retailer":"Sumo","retailer_slug":"sumo","retailer_logo_uri":"https://sumo-public-share.s3.ap-southeast-2.amazonaws.com/SumoIT/URI/Sumo_Logo.png","plan_name":"Sumo Standing Offer TOU + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":116.28,"peak_cents_per_kwh":45.9,"off_peak_cents_per_kwh":33.66,"shoulder_cents_per_kwh":32.6,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1538.02,"at_4000_kwh":1909.22,"at_5000_kwh":2280.42,"at_8000_kwh":3394.02},"marginal_rates":{"excess_unit_cost_cents":45.9,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=sumo-sum1034965sre1eme-electricity&source=ai","last_verified":"2026-02-13","source_doc":"CDR EnergyPlanDetailV3 SUM1034965SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed in Tariff","description":"If you have installed solar PV at the Premises, you may be eligible to be paid for excess electricity you feed back into the grid. Maximum system size of 10KW.","type":"single","rate_cents_per_kwh":0}],"terms":"Offer not available in all areas or properties. You must be a residential customer with an applicable network tariff for a premises where Sumo supplies Electricity. Please refer to our website https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions for full terms and conditions.","variation":"Prices, fees and charges are subject to change. We will give you at least 5 business days prior notice.","onExpiryDescription":"No contract term.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 5","Type 4"],"additionalFeeInformation":"We pass through any fee from your distributor, including fees for disconnection or reconnection, or special meter read (move-out). Distributor fees at https://www.sumo.com.au/help-and-support/rates-and-other-charges/other-fees-and-charges. Fee applied to your next bill.","fees":[{"type":"OTHER","amount":"2.75","description":"Dishonoured Payment Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.007","description":"This fee is only applicable for payments made by credit card.","term":"PERCENT_OF_BILL","rate":"0.007"},{"type":"CONNECTION","amount":"63.71","description":"A standard connection fee of $63.71 (ex GST) applies when you requested a connection of your electricity supply during standard business hours (Monday to Friday, excluding public holidays) when the site is already connected. All fees are subject to change and may vary depending on your distribution network or specific property requirements. Additional charges may apply for urgent, after-hours, or complex connections.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.1","description":"Bills can be issued by email for no cost, or alternatively by post at a cost of $3.10 (inc GST) per bill.","term":"FIXED"},{"type":"OTHER","amount":"2.00","description":"Over the counter fee at Australia Post","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":33.66},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":45.9},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":32.6},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":45.9}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17},{"plan_id":"sumo-sum1034969sre1eme-electricity","cdr_plan_id":"SUM1034969SRE1@EME","retailer":"Sumo","retailer_slug":"sumo","retailer_logo_uri":"https://sumo-public-share.s3.ap-southeast-2.amazonaws.com/SumoIT/URI/Sumo_Logo.png","plan_name":"Sumo Standing Offer TOU","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":116.28,"peak_cents_per_kwh":45.9,"off_peak_cents_per_kwh":33.66,"shoulder_cents_per_kwh":32.6,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1538.02,"at_4000_kwh":1909.22,"at_5000_kwh":2280.42,"at_8000_kwh":3394.02},"marginal_rates":{"excess_unit_cost_cents":45.9,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=sumo-sum1034969sre1eme-electricity&source=ai","last_verified":"2026-02-13","source_doc":"CDR EnergyPlanDetailV3 SUM1034969SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed in Tariff","description":"If you have installed solar PV at the Premises, you may be eligible to be paid for excess electricity you feed back into the grid. Maximum system size of 10KW.","type":"single","rate_cents_per_kwh":0}],"terms":"Offer not available in all areas or properties. You must be a residential customer with an applicable network tariff for a premises where Sumo supplies Electricity. Please refer to our website https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions for full terms and conditions.","variation":"Prices, fees and charges are subject to change. We will give you at least 5 business days prior notice.","onExpiryDescription":"No contract term.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 5","Type 4"],"additionalFeeInformation":"We pass through any fee from your distributor, including fees for disconnection or reconnection, or special meter read (move-out). Distributor fees at https://www.sumo.com.au/help-and-support/rates-and-other-charges/other-fees-and-charges. Fee applied to your next bill.","fees":[{"type":"OTHER","amount":"2.75","description":"Dishonoured Payment Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.007","description":"This fee is only applicable for payments made by credit card.","term":"PERCENT_OF_BILL","rate":"0.007"},{"type":"CONNECTION","amount":"63.71","description":"A standard connection fee of $63.71 (ex GST) applies when you requested a connection of your electricity supply during standard business hours (Monday to Friday, excluding public holidays) when the site is already connected. All fees are subject to change and may vary depending on your distribution network or specific property requirements. Additional charges may apply for urgent, after-hours, or complex connections.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.1","description":"Bills can be issued by email for no cost, or alternatively by post at a cost of $3.10 (inc GST) per bill.","term":"FIXED"},{"type":"OTHER","amount":"2.00","description":"Over the counter fee at Australia Post","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":33.66},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":45.9},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":32.6},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":45.9}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":17},{"plan_id":"lumo-energy-sa-lum203100mbe21eme-electricity","cdr_plan_id":"LUM203100MBE21@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.35,"supply_charge_cents_per_day":92.85},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1519.4,"at_4000_kwh":1912.9,"at_5000_kwh":2306.4,"at_8000_kwh":3486.9},"marginal_rates":{"excess_unit_cost_cents":39.35,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203100mbe21eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203100MBE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.9},{"plan_id":"lumo-energy-sa-lum203090mbe23eme-electricity","cdr_plan_id":"LUM203090MBE23@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Lumo Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.35,"supply_charge_cents_per_day":92.85},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1519.4,"at_4000_kwh":1912.9,"at_5000_kwh":2306.4,"at_8000_kwh":3486.9},"marginal_rates":{"excess_unit_cost_cents":39.35,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum203090mbe23eme-electricity&source=ai","last_verified":"2025-07-29","source_doc":"CDR EnergyPlanDetailV3 LUM203090MBE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 3.3 cents per kWh Lumo will purchase 10% of your consumption from GreenPower accredited sources.","tiers":[{"percentGreen":10,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.9},{"plan_id":"kogan-kog919297mre2eme-electricity","cdr_plan_id":"KOG919297MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":160,"peak_cents_per_kwh":38,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":34.3,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1581.8,"at_4000_kwh":1914.4,"at_5000_kwh":2247,"at_8000_kwh":3244.8},"marginal_rates":{"excess_unit_cost_cents":38,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog919297mre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 KOG919297MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":30},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":34.3},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":30},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":38},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"kogan-kog919298mre2eme-electricity","cdr_plan_id":"KOG919298MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":160,"peak_cents_per_kwh":38,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":34.3,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1581.8,"at_4000_kwh":1914.4,"at_5000_kwh":2247,"at_8000_kwh":3244.8},"marginal_rates":{"excess_unit_cost_cents":38,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog919298mre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 KOG919298MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":30},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":34.3},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":30},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":38},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"powershop-psh925670sre2eme-electricity","cdr_plan_id":"PSH925670SRE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":160,"peak_cents_per_kwh":38,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":34.3,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1581.8,"at_4000_kwh":1914.4,"at_5000_kwh":2247,"at_8000_kwh":3244.8},"marginal_rates":{"excess_unit_cost_cents":38,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925670sre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925670SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"This offer is available to customers within the SA Power Networks distribution zone with the applicable network tariff and meter configuration, and where Powershop is the retailer responsible for electricity supplied at the premises. We require a credit card or bank details. For further information in relation to Powershop and this offer - see our full terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We?ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":30},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":34.3},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":30},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":38},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"powershop-psh925683sre2eme-electricity","cdr_plan_id":"PSH925683SRE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":160,"peak_cents_per_kwh":38,"off_peak_cents_per_kwh":30,"shoulder_cents_per_kwh":34.3,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1581.8,"at_4000_kwh":1914.4,"at_5000_kwh":2247,"at_8000_kwh":3244.8},"marginal_rates":{"excess_unit_cost_cents":38,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925683sre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925683SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"This offer is available to customers within the SA Power Networks distribution zone with the applicable network tariff and meter configuration, and where Powershop is the retailer responsible for electricity supplied at the premises. We require a credit card or bank details. For further information in relation to Powershop and this offer - see our full terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We?ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":30},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":34.3},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":30},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":38},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552414mre16eme-electricity","cdr_plan_id":"RED552414MRE16@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Saver (Bundled)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552414mre16eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552414MRE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552409mre17eme-electricity","cdr_plan_id":"RED552409MRE17@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Saver (Bundled)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552409mre17eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552409MRE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552378mre17eme-electricity","cdr_plan_id":"RED552378MRE17@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Saver (Bundled)(TOUCL)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552378mre17eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552378MRE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552326mre16eme-electricity","cdr_plan_id":"RED552326MRE16@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552326mre16eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552326MRE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552297mre17eme-electricity","cdr_plan_id":"RED552297MRE17@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Saver (TOUCL)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552297mre17eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552297MRE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552328mre17eme-electricity","cdr_plan_id":"RED552328MRE17@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552328mre17eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552328MRE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552771mre14eme-electricity","cdr_plan_id":"RED552771MRE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red BCNA Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552771mre14eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552771MRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Contributions to BCNA","description":"Red will contribute $5 to Breast Cancer Network Australia for each calendar month you are on the Red BCNA Saver electricity plan, starting from the date we become responsible for your electricity supply."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552769mre15eme-electricity","cdr_plan_id":"RED552769MRE15@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red BCNA Saver (TOUCL)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552769mre15eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552769MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Contributions to BCNA","description":"Red will contribute $5 to Breast Cancer Network Australia for each calendar month you are on the Red BCNA Saver electricity plan, starting from the date we become responsible for your electricity supply."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red899412mre3eme-electricity","cdr_plan_id":"RED899412MRE3@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Rotary D9815 Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red899412mre3eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED899412MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Contributions to Rotary D9815","description":"Red will contribute $5 to Rotary International District 9815 Incorporated (ABN 11 298 508 921) for each calendar month you are on the Red Rotary D9815 Saver electricity plan, starting from the date we become responsible for your electricity supply."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552209mre14eme-electricity","cdr_plan_id":"RED552209MRE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Living Energy Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552209mre14eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552209MRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552710mre15eme-electricity","cdr_plan_id":"RED552710MRE15@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red BCNA Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552710mre15eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552710MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Contributions to BCNA","description":"Red will contribute $5 to Breast Cancer Network Australia for each calendar month you are on the Red BCNA Saver electricity plan, starting from the date we become responsible for your electricity supply."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552198mre13eme-electricity","cdr_plan_id":"RED552198MRE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Living Energy Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552198mre13eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552198MRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red899396mre3eme-electricity","cdr_plan_id":"RED899396MRE3@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Rotary D9815 Saver (TOUCL)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red899396mre3eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED899396MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Contributions to Rotary D9815","description":"Red will contribute $5 to Rotary International District 9815 Incorporated (ABN 11 298 508 921) for each calendar month you are on the Red Rotary D9815 Saver electricity plan, starting from the date we become responsible for your electricity supply."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red899377mre3eme-electricity","cdr_plan_id":"RED899377MRE3@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Rotary D9815 Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red899377mre3eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED899377MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Contributions to Rotary D9815","description":"Red will contribute $5 to Rotary International District 9815 Incorporated (ABN 11 298 508 921) for each calendar month you are on the Red Rotary D9815 Saver electricity plan, starting from the date we become responsible for your electricity supply."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552675mre15eme-electricity","cdr_plan_id":"RED552675MRE15@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Wildlife Saver (TOUCL)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are a residential customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552675mre15eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552675MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Supporting Taronga & Wildlife","description":"Red will contribute $5 to Taronga Conservation Society Australia for each calendar month you are on the Red Wildlife Saver plan, starting from the date we become responsible for your electricity supply."},{"category":"OTHER","displayName":"Renewable Matching Promise","description":"For every unit of electricity you buy from Red Energy, Snowy Hydro Limited will match it by generating one unit of electricity from a renewable source."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552641mre14eme-electricity","cdr_plan_id":"RED552641MRE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Wildlife Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are a residential customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552641mre14eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552641MRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Supporting Taronga & Wildlife","description":"Red will contribute $5 to Taronga Conservation Society Australia for each calendar month you are on the Red Wildlife Saver plan, starting from the date we become responsible for your electricity supply."},{"category":"OTHER","displayName":"Renewable Matching Promise","description":"For every unit of electricity you buy from Red Energy, Snowy Hydro Limited will match it by generating one unit of electricity from a renewable source."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552133mre14eme-electricity","cdr_plan_id":"RED552133MRE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Living Energy Saver (TOUCL)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552133mre14eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552133MRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"red-energy-red552649mre15eme-electricity","cdr_plan_id":"RED552649MRE15@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Wildlife Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.03,"supply_charge_cents_per_day":97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1524.95,"at_4000_kwh":1915.25,"at_5000_kwh":2305.55,"at_8000_kwh":3476.45},"marginal_rates":{"excess_unit_cost_cents":39.03,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are a residential customer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552649mre15eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552649MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Supporting Taronga & Wildlife","description":"Red will contribute $5 to Taronga Conservation Society Australia for each calendar month you are on the Red Wildlife Saver plan, starting from the date we become responsible for your electricity supply."},{"category":"OTHER","displayName":"Renewable Matching Promise","description":"For every unit of electricity you buy from Red Energy, Snowy Hydro Limited will match it by generating one unit of electricity from a renewable source."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.8},{"plan_id":"agl-agl1041978mbe1eme-electricity","cdr_plan_id":"AGL1041978MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.4,"supply_charge_cents_per_day":93.4,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":39.4},{"volume_kwh":null,"rate_cents_per_kwh":39.4}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1522.91,"at_4000_kwh":1916.91,"at_5000_kwh":2310.91,"at_8000_kwh":3492.91},"marginal_rates":{"excess_unit_cost_cents":39.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1041978mbe1eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL1041978MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.7},{"plan_id":"agl-agl1041983mbe1eme-electricity","cdr_plan_id":"AGL1041983MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.4,"supply_charge_cents_per_day":93.4,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":39.4},{"volume_kwh":null,"rate_cents_per_kwh":39.4}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1522.91,"at_4000_kwh":1916.91,"at_5000_kwh":2310.91,"at_8000_kwh":3492.91},"marginal_rates":{"excess_unit_cost_cents":39.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1041983mbe1eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL1041983MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.7},{"plan_id":"agl-agl907783mbe4eme-electricity","cdr_plan_id":"AGL907783MBE4@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - 3rd Party (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.4,"supply_charge_cents_per_day":93.4,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":39.4},{"volume_kwh":null,"rate_cents_per_kwh":39.4}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1522.91,"at_4000_kwh":1916.91,"at_5000_kwh":2310.91,"at_8000_kwh":3492.91},"marginal_rates":{"excess_unit_cost_cents":39.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907783mbe4eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 AGL907783MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.7},{"plan_id":"agl-agl907775mbe4eme-electricity","cdr_plan_id":"AGL907775MBE4@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - 3rd Party (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.4,"supply_charge_cents_per_day":93.4,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":39.4},{"volume_kwh":null,"rate_cents_per_kwh":39.4}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1522.91,"at_4000_kwh":1916.91,"at_5000_kwh":2310.91,"at_8000_kwh":3492.91},"marginal_rates":{"excess_unit_cost_cents":39.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907775mbe4eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 AGL907775MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.7},{"plan_id":"agl-agl907788mbe3eme-electricity","cdr_plan_id":"AGL907788MBE3@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.4,"supply_charge_cents_per_day":93.4,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":39.4},{"volume_kwh":null,"rate_cents_per_kwh":39.4}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1522.91,"at_4000_kwh":1916.91,"at_5000_kwh":2310.91,"at_8000_kwh":3492.91},"marginal_rates":{"excess_unit_cost_cents":39.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907788mbe3eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL907788MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.7},{"plan_id":"agl-agl907781mbe3eme-electricity","cdr_plan_id":"AGL907781MBE3@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.4,"supply_charge_cents_per_day":93.4,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":39.4},{"volume_kwh":null,"rate_cents_per_kwh":39.4}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1522.91,"at_4000_kwh":1916.91,"at_5000_kwh":2310.91,"at_8000_kwh":3492.91},"marginal_rates":{"excess_unit_cost_cents":39.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907781mbe3eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL907781MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.7},{"plan_id":"globird-glo1054007mre1eme-electricity","cdr_plan_id":"GLO1054007MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"GLOSAVE Residential (Flexible Rate CTL)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":137,"peak_cents_per_kwh":47,"off_peak_cents_per_kwh":30.5,"shoulder_cents_per_kwh":30.5,"peak_hours":"3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1563.55,"at_4000_kwh":1918.05,"at_5000_kwh":2272.55,"at_8000_kwh":3336.05},"marginal_rates":{"excess_unit_cost_cents":47,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054007mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054007MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers with an applicable network tariff. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.5},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.6},{"plan_id":"globird-glo1054008mre1eme-electricity","cdr_plan_id":"GLO1054008MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"GLOSAVE Residential (Flexible Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":137,"peak_cents_per_kwh":47,"off_peak_cents_per_kwh":30.5,"shoulder_cents_per_kwh":30.5,"peak_hours":"3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1563.55,"at_4000_kwh":1918.05,"at_5000_kwh":2272.55,"at_8000_kwh":3336.05},"marginal_rates":{"excess_unit_cost_cents":47,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054008mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054008MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers with an applicable network tariff. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":47},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":47},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.5},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":47}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.6},{"plan_id":"energy-locals-retail-lcl986537mbe1eme-electricity","cdr_plan_id":"LCL986537MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Member - Bonus Credit","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.82,"supply_charge_cents_per_day":123.18},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Sign Up Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$175 credit is available for new customers only, and is applied if your electricity supply remains with us for 6 months."}],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1554.21,"at_4000_kwh":1922.41,"at_5000_kwh":2290.61,"at_8000_kwh":3395.21},"marginal_rates":{"excess_unit_cost_cents":36.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986537mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986537MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"389.88","description":"Access wholesale energy rates with a $32.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.5},{"plan_id":"energy-locals-retail-lcl986535mbe1eme-electricity","cdr_plan_id":"LCL986535MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Member - Bonus Credit","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.82,"supply_charge_cents_per_day":123.18},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Sign Up Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$175 credit is available for new customers only, and is applied if your electricity supply remains with us for 6 months."}],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1554.21,"at_4000_kwh":1922.41,"at_5000_kwh":2290.61,"at_8000_kwh":3395.21},"marginal_rates":{"excess_unit_cost_cents":36.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986535mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986535MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"389.88","description":"Access wholesale energy rates with a $32.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.5},{"plan_id":"flipped-fea1059491sre1eme-electricity","cdr_plan_id":"FEA1059491SRE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Freedom Standing Offer - Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":189.9,"peak_cents_per_kwh":59.81,"off_peak_cents_per_kwh":11.6,"shoulder_cents_per_kwh":35.07,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9am-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"9pm-8:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1615.85,"at_4000_kwh":1923.42,"at_5000_kwh":2230.98,"at_8000_kwh":3153.7},"marginal_rates":{"excess_unit_cost_cents":59.81,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059491sre1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059491SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":9,"rateCents":35.07},{"type":"OFF_PEAK","startHour":9,"endHour":17,"rateCents":11.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.81},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":35.07}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.4},{"plan_id":"zen-energy-zen926427sre1eme-electricity","cdr_plan_id":"ZEN926427SRE1@EME","retailer":"ZEN Energy","retailer_slug":"zen-energy","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/1fc3b6168abbd718eab34718a4faac54.png","plan_name":"ZEN Energy TOU Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":152.12,"peak_cents_per_kwh":44.43,"off_peak_cents_per_kwh":31.35,"shoulder_cents_per_kwh":26.13,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1582.14,"at_4000_kwh":1924.44,"at_5000_kwh":2266.74,"at_8000_kwh":3293.64},"marginal_rates":{"excess_unit_cost_cents":44.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=zen-energy-zen926427sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 ZEN926427SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"Only available to customers with an applicable network tariff and meter type.  Not available in all areas or property types. Residential customers only. Full terms and conditions available at https://www.zenenergy.com.au/knowledge-base/reports-policies-manuals/","variation":"We may vary your rates, fees and charges at any time in accordance with the applicable regulatory requirements. We will give you advance notice of any changes, which may be on your bill.","billFrequency":["P1M"],"paymentOption":["BPAY","DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply. For more information on additional fees and charges, please visit https://www.zenenergy.com.au/knowledge-base/reports-policies-manuals/","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"$21.23 (incl. GST) Standard move-out fee. This fee may apply when you move out and require a final meter read. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"$63.71 (incl. GST) This fee may apply when reconnecting power to your property where you have been disconnected due to non-payment. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"$63.71 (incl.GST) This fee may be charged when disconnecting your power for non-payment. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":44.43},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":31.35},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":44.43},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":26.13},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":44.43}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.4},{"plan_id":"energy-locals-retail-lcl986572mbe1eme-electricity","cdr_plan_id":"LCL986572MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":155.91,"peak_cents_per_kwh":40.91,"off_peak_cents_per_kwh":30.91,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1586.37,"at_4000_kwh":1925.47,"at_5000_kwh":2264.57,"at_8000_kwh":3281.87},"marginal_rates":{"excess_unit_cost_cents":40.91,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986572mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986572MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.91},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":40.91},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.91}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.3},{"plan_id":"powershop-psh997507mbe1eme-electricity","cdr_plan_id":"PSH997507MBE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":127.59,"peak_cents_per_kwh":46.8,"off_peak_cents_per_kwh":29.64,"shoulder_cents_per_kwh":38.44,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-6:59am mon, tue, wed, thu, fri; 12am-4:59pm sat, sun · Winter: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1562.14,"at_4000_kwh":1927.62,"at_5000_kwh":2293.1,"at_8000_kwh":3389.54},"marginal_rates":{"excess_unit_cost_cents":46.8,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh997507mbe1eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH997507MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to Powershop automatically debiting your preferred payment method for any outstanding amounts due. Further information in relation to this offer, see our terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). We offer 10%, 25%, 50% and 100% GreenPower.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.64},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":38.44},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.8},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.64}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.64},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.8},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.64}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.64},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":38.44},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.64}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.2},{"plan_id":"powershop-psh997552mbe1eme-electricity","cdr_plan_id":"PSH997552MBE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":127.59,"peak_cents_per_kwh":46.8,"off_peak_cents_per_kwh":29.64,"shoulder_cents_per_kwh":38.44,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-6:59am mon, tue, wed, thu, fri; 12am-4:59pm sat, sun · Winter: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1562.14,"at_4000_kwh":1927.62,"at_5000_kwh":2293.1,"at_8000_kwh":3389.54},"marginal_rates":{"excess_unit_cost_cents":46.8,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh997552mbe1eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH997552MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to Powershop automatically debiting your preferred payment method for any outstanding amounts due. Further information in relation to this offer, see our terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). We offer 10%, 25%, 50% and 100% GreenPower.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.64},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":38.44},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.8},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.64}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.64},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.8},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.64}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.64},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":38.44},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.64}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.2},{"plan_id":"momentum-mom916066sre1eme-electricity","cdr_plan_id":"MOM916066SRE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":163.85,"peak_cents_per_kwh":41.98,"off_peak_cents_per_kwh":28.25,"shoulder_cents_per_kwh":32.8,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1596.42,"at_4000_kwh":1929.21,"at_5000_kwh":2262,"at_8000_kwh":3260.37},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916066sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916066SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":32.8},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":41.98},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":28.25},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":41.98}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":16.2},{"plan_id":"agl-agl1055672mre1eme-electricity","cdr_plan_id":"AGL1055672MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":41.99,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":41.99},{"volume_kwh":null,"rate_cents_per_kwh":41.99}],"original_tariff_type":"flat","peak_cents_per_kwh":41.99,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1555.45,"at_4000_kwh":1937.26,"at_5000_kwh":2319.08,"at_8000_kwh":3464.53},"marginal_rates":{"excess_unit_cost_cents":41.99,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055672mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055672MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":41.99},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":41.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.8},{"plan_id":"agl-agl1055670mre1eme-electricity","cdr_plan_id":"AGL1055670MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":41.99,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":41.99},{"volume_kwh":null,"rate_cents_per_kwh":41.99}],"original_tariff_type":"flat","peak_cents_per_kwh":41.99,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1555.45,"at_4000_kwh":1937.26,"at_5000_kwh":2319.08,"at_8000_kwh":3464.53},"marginal_rates":{"excess_unit_cost_cents":41.99,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055670mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055670MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply and controlled load charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":41.99},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":41.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.8},{"plan_id":"agl-agl1055633mre1eme-electricity","cdr_plan_id":"AGL1055633MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":41.99,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":41.99},{"volume_kwh":null,"rate_cents_per_kwh":41.99}],"original_tariff_type":"flat","peak_cents_per_kwh":41.99,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1555.45,"at_4000_kwh":1937.26,"at_5000_kwh":2319.08,"at_8000_kwh":3464.53},"marginal_rates":{"excess_unit_cost_cents":41.99,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055633mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055633MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply and controlled load charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":41.99},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":41.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.8},{"plan_id":"agl-agl1055632mre1eme-electricity","cdr_plan_id":"AGL1055632MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":41.99,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":41.99},{"volume_kwh":null,"rate_cents_per_kwh":41.99}],"original_tariff_type":"flat","peak_cents_per_kwh":41.99,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1555.45,"at_4000_kwh":1937.26,"at_5000_kwh":2319.08,"at_8000_kwh":3464.53},"marginal_rates":{"excess_unit_cost_cents":41.99,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055632mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055632MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":41.99},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":41.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.8},{"plan_id":"agl-agl979830mre9eme-electricity","cdr_plan_id":"AGL979830MRE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":41.99,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":41.99},{"volume_kwh":null,"rate_cents_per_kwh":41.99}],"original_tariff_type":"flat","peak_cents_per_kwh":41.99,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1555.45,"at_4000_kwh":1937.26,"at_5000_kwh":2319.08,"at_8000_kwh":3464.53},"marginal_rates":{"excess_unit_cost_cents":41.99,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl979830mre9eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 AGL979830MRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"RETAILER","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply and controlled load charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":41.99},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":41.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.8},{"plan_id":"agl-agl978232mre13eme-electricity","cdr_plan_id":"AGL978232MRE13@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":41.99,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":41.99},{"volume_kwh":null,"rate_cents_per_kwh":41.99}],"original_tariff_type":"flat","peak_cents_per_kwh":41.99,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1555.45,"at_4000_kwh":1937.26,"at_5000_kwh":2319.08,"at_8000_kwh":3464.53},"marginal_rates":{"excess_unit_cost_cents":41.99,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl978232mre13eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 AGL978232MRE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"RETAILER","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":41.99},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":41.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.8},{"plan_id":"agl-agl978231mre14eme-electricity","cdr_plan_id":"AGL978231MRE14@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":41.99,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":41.99},{"volume_kwh":null,"rate_cents_per_kwh":41.99}],"original_tariff_type":"flat","peak_cents_per_kwh":41.99,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1555.45,"at_4000_kwh":1937.26,"at_5000_kwh":2319.08,"at_8000_kwh":3464.53},"marginal_rates":{"excess_unit_cost_cents":41.99,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl978231mre14eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 AGL978231MRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"RETAILER","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply and controlled load charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":41.99},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":41.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.8},{"plan_id":"agl-agl979829mre8eme-electricity","cdr_plan_id":"AGL979829MRE8@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":41.99,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":41.99},{"volume_kwh":null,"rate_cents_per_kwh":41.99}],"original_tariff_type":"flat","peak_cents_per_kwh":41.99,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1555.45,"at_4000_kwh":1937.26,"at_5000_kwh":2319.08,"at_8000_kwh":3464.53},"marginal_rates":{"excess_unit_cost_cents":41.99,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl979829mre8eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 AGL979829MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"RETAILER","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":41.99},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":41.99}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.8},{"plan_id":"dodo-dod146946sre9eme-electricity","cdr_plan_id":"DOD146946SRE9@EME","retailer":"Dodo Power & Gas","retailer_slug":"dodo","retailer_logo_uri":"https://s0.2mdn.net/creatives/assets/4983616/Dodo_Logo_Aug23_V1.svg","plan_name":"Residential Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":174.31,"peak_cents_per_kwh":40.92,"off_peak_cents_per_kwh":30.49,"shoulder_cents_per_kwh":25.29,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1613.6,"at_4000_kwh":1939.39,"at_5000_kwh":2265.18,"at_8000_kwh":3242.55},"marginal_rates":{"excess_unit_cost_cents":40.92,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=dodo-dod146946sre9eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 DOD146946SRE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"TOU Rate Solar FiT","description":"Solar FIT Scheme (DFIT1) & (DFIT1A)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"Retailer Feed-in Tariff - This plan is available to eligible small solar customers with a maximum 10kW panel size and an inverter system no greater than 10kW as part of an ongoing contract.","type":"single","rate_cents_per_kwh":1}],"terms":"See our Standing terms and conditions at www.dodo.com/energy/terms-prices-and-regulatory-information. If you are eligible, you can apply to the SA Government to receive applicable energy concessions.","variation":"We may vary these prices no more than once every 6 months, and provide you notice of any changes at least 5 business days before the change is effective. We will publish variations on our website and in a newspaper at least 10 business days prior.","onExpiryDescription":"Standing contracts do not expire until you notify us in accordance with our Standing Contract Terms and Conditions.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For further details on the information and fees presented, or the terms and conditions of the contract, please visit www.dodo.com/energy/terms-prices-and-regulatory-information or contact us on 13 dodo (13 36 36).","fees":[{"type":"DD_DISHONOUR","amount":"9.5","description":"Dishonoured Payment fee of $9.50 (inc GST) may apply to payments we attempt that are subsequently declined.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move into a property.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move out of a property.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply when moving into your property and connecting electricity to your property.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":40.92},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":30.49},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":40.92},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":25.29},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":40.92}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.7},{"plan_id":"nectr-ntr1013076mre1eme-electricity","cdr_plan_id":"NTR1013076MRE1@EME","retailer":"Nectr","retailer_slug":"nectr","retailer_logo_uri":"https://nectr.com.au/wp-content/uploads/2023/04/header-logo.svg","plan_name":"Nectr Home Buzz Time of Use + CL 1","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":132.82,"peak_cents_per_kwh":46.96,"off_peak_cents_per_kwh":32.86,"shoulder_cents_per_kwh":29.68,"peak_hours":"4pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Refer a Friend Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$50 credit on your 2nd bill, if you sign up using a Refer a Friend link from an existing Nectr customer. Applies to new customers only. T&Cs apply, refer to nectr.com.au/terms-and-conditions/nectr-refer-a-friend-program/"}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1578.41,"at_4000_kwh":1942.95,"at_5000_kwh":2307.49,"at_8000_kwh":3401.11},"marginal_rates":{"excess_unit_cost_cents":46.96,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=nectr-ntr1013076mre1eme-electricity&source=ai","last_verified":"2025-10-21","source_doc":"CDR EnergyPlanDetailV3 NTR1013076MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"Retailer feed-in tariffs","type":"single","rate_cents_per_kwh":0}],"terms":"This offer is available to customers with an applicable network tariff. If you are not sure which network tariff you have, please contact us or sign up online to check this offer is available to you. Billing will be either monthly or quarterly, depending on your meter type. For more details on the terms and conditions, visit nectr.com.au/terms-and-conditions/#contracts, contact Nectr on hello@nectr.com.au or call 1300 111 211.","variation":"We may vary your rates and charges by providing you notice of any changes at least 5 business days before they become effective.","onExpiryDescription":"Your contract is ongoing","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the Nectr fee schedules at https://nectr.com.au/plans-and-fees/sa-power/","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"This fee may apply when disconnecting power to your property. Additional charges may be incurred for after hours requests, site-visits and non-payment cases.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"This fee may apply when reconnecting power to your property. Additional charges may be incurred for after hours requests or site-visits.","term":"FIXED"},{"type":"OTHER","amount":"21.23","description":"This fee may apply when a customer requests the network undertake a special meter read.","term":"FIXED"},{"type":"CONNECTION","amount":"21.23","description":"This fee may apply when you move into a property. A reconnection fee may apply if your move-in requires reconnection.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.013","description":"This fee applies to payments made by debit and credit cards, excluding direct debit.","term":"PERCENT_OF_BILL","rate":"0.013"},{"type":"PAYMENT_PROCESSING","amount":"0.88","description":"BPay payments incur a $0.88(inc GST) fee per transaction.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.96},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":29.68},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":46.96}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.6},{"plan_id":"nectr-ntr1013077mre1eme-electricity","cdr_plan_id":"NTR1013077MRE1@EME","retailer":"Nectr","retailer_slug":"nectr","retailer_logo_uri":"https://nectr.com.au/wp-content/uploads/2023/04/header-logo.svg","plan_name":"Nectr Home Buzz Time of Use + CL 2","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":132.82,"peak_cents_per_kwh":46.96,"off_peak_cents_per_kwh":32.86,"shoulder_cents_per_kwh":29.68,"peak_hours":"4pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Refer a Friend Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$50 credit on your 2nd bill, if you sign up using a Refer a Friend link from an existing Nectr customer. Applies to new customers only. T&Cs apply, refer to nectr.com.au/terms-and-conditions/nectr-refer-a-friend-program/"}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1578.41,"at_4000_kwh":1942.95,"at_5000_kwh":2307.49,"at_8000_kwh":3401.11},"marginal_rates":{"excess_unit_cost_cents":46.96,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=nectr-ntr1013077mre1eme-electricity&source=ai","last_verified":"2025-10-21","source_doc":"CDR EnergyPlanDetailV3 NTR1013077MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"Retailer feed-in tariffs","type":"single","rate_cents_per_kwh":0}],"terms":"This offer is available to customers with an applicable network tariff. If you are not sure which network tariff you have, please contact us or sign up online to check this offer is available to you. Billing will be either monthly or quarterly, depending on your meter type. For more details on the terms and conditions, visit nectr.com.au/terms-and-conditions/#contracts, contact Nectr on hello@nectr.com.au or call 1300 111 211.","variation":"We may vary your rates and charges by providing you notice of any changes at least 5 business days before they become effective.","onExpiryDescription":"Your contract is ongoing","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the Nectr fee schedules at https://nectr.com.au/plans-and-fees/sa-power/","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"This fee may apply when disconnecting power to your property. Additional charges may be incurred for after hours requests, site-visits and non-payment cases.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"This fee may apply when reconnecting power to your property. Additional charges may be incurred for after hours requests or site-visits.","term":"FIXED"},{"type":"OTHER","amount":"21.23","description":"This fee may apply when a customer requests the network undertake a special meter read.","term":"FIXED"},{"type":"CONNECTION","amount":"21.23","description":"This fee may apply when you move into a property. A reconnection fee may apply if your move-in requires reconnection.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.013","description":"This fee applies to payments made by debit and credit cards, excluding direct debit.","term":"PERCENT_OF_BILL","rate":"0.013"},{"type":"PAYMENT_PROCESSING","amount":"0.88","description":"BPay payments incur a $0.88(inc GST) fee per transaction.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.96},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":29.68},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":46.96}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.6},{"plan_id":"nectr-ntr1013075mre1eme-electricity","cdr_plan_id":"NTR1013075MRE1@EME","retailer":"Nectr","retailer_slug":"nectr","retailer_logo_uri":"https://nectr.com.au/wp-content/uploads/2023/04/header-logo.svg","plan_name":"Nectr Home Buzz Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":132.82,"peak_cents_per_kwh":46.96,"off_peak_cents_per_kwh":32.86,"shoulder_cents_per_kwh":29.68,"peak_hours":"4pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Refer a Friend Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$50 credit on your 2nd bill, if you sign up using a Refer a Friend link from an existing Nectr customer. Applies to new customers only. T&Cs apply, refer to nectr.com.au/terms-and-conditions/nectr-refer-a-friend-program/"}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1578.41,"at_4000_kwh":1942.95,"at_5000_kwh":2307.49,"at_8000_kwh":3401.11},"marginal_rates":{"excess_unit_cost_cents":46.96,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=nectr-ntr1013075mre1eme-electricity&source=ai","last_verified":"2025-10-21","source_doc":"CDR EnergyPlanDetailV3 NTR1013075MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"Retailer feed-in tariffs","type":"single","rate_cents_per_kwh":0}],"terms":"This offer is available to customers with an applicable network tariff. If you are not sure which network tariff you have, please contact us or sign up online to check this offer is available to you. Billing will be either monthly or quarterly, depending on your meter type. For more details on the terms and conditions, visit nectr.com.au/terms-and-conditions/#contracts, contact Nectr on hello@nectr.com.au or call 1300 111 211.","variation":"We may vary your rates and charges by providing you notice of any changes at least 5 business days before they become effective.","onExpiryDescription":"Your contract is ongoing","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the Nectr fee schedules at https://nectr.com.au/plans-and-fees/sa-power/","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"This fee may apply when disconnecting power to your property. Additional charges may be incurred for after hours requests, site-visits and non-payment cases.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"This fee may apply when reconnecting power to your property. Additional charges may be incurred for after hours requests or site-visits.","term":"FIXED"},{"type":"OTHER","amount":"21.23","description":"This fee may apply when a customer requests the network undertake a special meter read.","term":"FIXED"},{"type":"CONNECTION","amount":"21.23","description":"This fee may apply when you move into a property. A reconnection fee may apply if your move-in requires reconnection.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.013","description":"This fee applies to payments made by debit and credit cards, excluding direct debit.","term":"PERCENT_OF_BILL","rate":"0.013"},{"type":"PAYMENT_PROCESSING","amount":"0.88","description":"BPay payments incur a $0.88(inc GST) fee per transaction.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":32.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":46.96},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":29.68},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":46.96}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.6},{"plan_id":"flow-power-fp11034989mre1eme-electricity","cdr_plan_id":"FP11034989MRE1@EME","retailer":"Flow Power","retailer_slug":"flow-power","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/a2e3b81a479f4c3ea9434600700a3b67.png","plan_name":"Flow Home FY26: Variable Prices (estimate)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":139.76,"peak_cents_per_kwh":35.97,"off_peak_cents_per_kwh":35.97,"shoulder_cents_per_kwh":35.97,"peak_hours":"3pm-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1589.22,"at_4000_kwh":1948.92,"at_5000_kwh":2308.62,"at_8000_kwh":3387.72},"marginal_rates":{"excess_unit_cost_cents":35.97,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flow-power-fp11034989mre1eme-electricity&source=ai","last_verified":"2026-02-16","source_doc":"CDR EnergyPlanDetailV3 FP11034989MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Peak FiT","description":"Flow Power offers 45 cents per kWh exported between 5:30PM to 7:30PM and 0 cents per kWh exported all other times. All amounts are GST-inclusive.","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":45,"hours":"5:30pm-7:29pm","startHour":17.5,"endHour":19.483333333333334}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Off-Peak FiT","description":"Flow Power offers 45 cents per kWh exported between 5:30PM to 7:30PM and 0 cents per kWh exported all other times. All amounts are GST-inclusive.","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"7:30pm-5:29pm","startHour":19.5,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"7:30pm-5:29pm","startHour":0,"endHour":17.483333333333334}]}],"terms":"See Flow Power Market Retail Contract Agreement Terms at flowpower.com.au/residential/policies/","variation":"Usage rates are not fixed. For more information about our pricing visit flowpower.com.au/residential/pricing/our-pricing","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"Additional fees may apply. For more information, please visit the retailer's website at flowpower.com.au/residential/policies/","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection fee","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Disconnection fee","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0066","description":"Payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0066"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"PERCENT_OF_USE","description":"This offer has 100% green power included in the offer rates.","tiers":[{"percentGreen":100,"amount":"0"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":35.97},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.97},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":35.97},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":35.97},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":35.97}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.3},{"plan_id":"energy-locals-retail-lcl1042412sre1eme-electricity","cdr_plan_id":"LCL1042412SRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":210,"peak_cents_per_kwh":37.27,"off_peak_cents_per_kwh":27.73,"shoulder_cents_per_kwh":23.18,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1656.96,"at_4000_kwh":1953.78,"at_5000_kwh":2250.6,"at_8000_kwh":3141.06},"marginal_rates":{"excess_unit_cost_cents":37.27,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1042412sre1eme-electricity&source=ai","last_verified":"2026-03-20","source_doc":"CDR EnergyPlanDetailV3 LCL1042412SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocalsretail.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX payments via energylocalsretail.com.au/pay-by-card. Debit card transactions are subject to a 0.46% fee, and credit card payments incur a 0.81% fee. Card processing fees are waived for Direct Debit payments.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":27.73},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":37.27},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":23.18},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":37.27}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.1},{"plan_id":"ovo-energy-ovo704517mre20eme-electricity","cdr_plan_id":"OVO704517MRE20@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The One Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39,"supply_charge_cents_per_day":108},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1564.2,"at_4000_kwh":1954.2,"at_5000_kwh":2344.2,"at_8000_kwh":3514.2},"marginal_rates":{"excess_unit_cost_cents":39,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704517mre20eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704517MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.1},{"plan_id":"ovo-energy-ovo704516mre20eme-electricity","cdr_plan_id":"OVO704516MRE20@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The One Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39,"supply_charge_cents_per_day":108},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1564.2,"at_4000_kwh":1954.2,"at_5000_kwh":2344.2,"at_8000_kwh":3514.2},"marginal_rates":{"excess_unit_cost_cents":39,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704516mre20eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704516MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15.1},{"plan_id":"momentum-mom921220mre3eme-electricity","cdr_plan_id":"MOM921220MRE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Bill Boss Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":164.5,"peak_cents_per_kwh":42.6,"off_peak_cents_per_kwh":28.8,"shoulder_cents_per_kwh":33.4,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1616.23,"at_4000_kwh":1954.83,"at_5000_kwh":2293.43,"at_8000_kwh":3309.23},"marginal_rates":{"excess_unit_cost_cents":42.6,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921220mre3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921220MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, sign up via our third party sales channels or call Momentum directly, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":33.4},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":42.6},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":28.8},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":42.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15},{"plan_id":"momentum-mom921169mre2eme-electricity","cdr_plan_id":"MOM921169MRE2@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Suit Yourself Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":164.5,"peak_cents_per_kwh":42.6,"off_peak_cents_per_kwh":28.8,"shoulder_cents_per_kwh":33.4,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1616.23,"at_4000_kwh":1954.83,"at_5000_kwh":2293.43,"at_8000_kwh":3309.23},"marginal_rates":{"excess_unit_cost_cents":42.6,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921169mre2eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921169MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, have necessary metering configuration. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"10% GreenPower included","description":"GreenPower comes with this plan. That means you offset 10% of your electricity usage with renewable energy."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":33.4},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":42.6},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":28.8},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":42.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15},{"plan_id":"momentum-mom916064sre1eme-electricity","cdr_plan_id":"MOM916064SRE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":164.51,"peak_cents_per_kwh":42.57,"off_peak_cents_per_kwh":28.85,"shoulder_cents_per_kwh":33.39,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1616.68,"at_4000_kwh":1955.42,"at_5000_kwh":2294.16,"at_8000_kwh":3310.38},"marginal_rates":{"excess_unit_cost_cents":42.57,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916064sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916064SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":33.39},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":42.57},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":28.85},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":42.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":15},{"plan_id":"energy-locals-retail-lcl987121sbe1eme-electricity","cdr_plan_id":"LCL987121SBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":295,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":29.09,"shoulder_cents_per_kwh":37.73,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Winter: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Summer: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-4:59pm sat, sun","shoulder_hours":"Winter: 7am-8:59pm mon, tue, wed, thu, fri · Summer: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1739.48,"at_4000_kwh":1960.39,"at_5000_kwh":2181.3,"at_8000_kwh":2844.03},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl987121sbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL987121SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"touSchedule":[{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.09},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.73},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.09}]}]},{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.09},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.73},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.36},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.09},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.36},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.8},{"plan_id":"zen-energy-zen926426sre1eme-electricity","cdr_plan_id":"ZEN926426SRE1@EME","retailer":"ZEN Energy","retailer_slug":"zen-energy","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/1fc3b6168abbd718eab34718a4faac54.png","plan_name":"ZEN Energy TOU + CL Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":156.12,"peak_cents_per_kwh":45.13,"off_peak_cents_per_kwh":31.86,"shoulder_cents_per_kwh":26.55,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1613.21,"at_4000_kwh":1961,"at_5000_kwh":2308.79,"at_8000_kwh":3352.16},"marginal_rates":{"excess_unit_cost_cents":45.13,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=zen-energy-zen926426sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 ZEN926426SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"Only available to customers with an applicable network tariff and meter type.  Not available in all areas or property types. Residential customers only. Full terms and conditions available at https://www.zenenergy.com.au/knowledge-base/reports-policies-manuals/","variation":"We may vary your rates, fees and charges at any time in accordance with the applicable regulatory requirements. We will give you advance notice of any changes, which may be on your bill.","billFrequency":["P1M"],"paymentOption":["BPAY","DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply. For more information on additional fees and charges, please visit https://www.zenenergy.com.au/knowledge-base/reports-policies-manuals/","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"$21.23 (incl. GST) Standard move-out fee. This fee may apply when you move out and require a final meter read. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"$63.71 (incl. GST) This fee may apply when reconnecting power to your property where you have been disconnected due to non-payment. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"$63.71 (incl.GST) This fee may be charged when disconnecting your power for non-payment. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":45.13},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":31.86},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":45.13},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":26.55},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":45.13}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.8},{"plan_id":"momentum-mom916076sre1eme-electricity","cdr_plan_id":"MOM916076SRE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":156.27,"peak_cents_per_kwh":53.22,"off_peak_cents_per_kwh":25.05,"shoulder_cents_per_kwh":31.5,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1614.12,"at_4000_kwh":1962.03,"at_5000_kwh":2309.94,"at_8000_kwh":3353.67},"marginal_rates":{"excess_unit_cost_cents":53.22,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916076sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916076SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":31.5},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":25.05},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":31.5},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":53.22},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":31.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.7},{"plan_id":"ovo-energy-ovo934296sre1eme-electricity","cdr_plan_id":"OVO934296SRE1@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"Basic Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":144.9,"peak_cents_per_kwh":43.4,"off_peak_cents_per_kwh":33.9,"shoulder_cents_per_kwh":29.4,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1604.39,"at_4000_kwh":1962.89,"at_5000_kwh":2321.39,"at_8000_kwh":3396.89},"marginal_rates":{"excess_unit_cost_cents":43.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo934296sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 OVO934296SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 5","Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":33.9},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":29.4},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.7},{"plan_id":"ovo-energy-ovo934259sre1eme-electricity","cdr_plan_id":"OVO934259SRE1@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"Basic Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":144.9,"peak_cents_per_kwh":43.4,"off_peak_cents_per_kwh":33.9,"shoulder_cents_per_kwh":29.4,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1604.39,"at_4000_kwh":1962.89,"at_5000_kwh":2321.39,"at_8000_kwh":3396.89},"marginal_rates":{"excess_unit_cost_cents":43.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo934259sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 OVO934259SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 5","Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":43.4},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":33.9},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":43.4},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":29.4},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":43.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.7},{"plan_id":"globird-glo964319sre1eme-electricity","cdr_plan_id":"GLO964319SRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"Resi Standing Offer Prices (Flex Rate CTL)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":155,"peak_cents_per_kwh":42.8,"off_peak_cents_per_kwh":32.9,"shoulder_cents_per_kwh":28.4,"peak_hours":"3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1614.85,"at_4000_kwh":1964.55,"at_5000_kwh":2314.25,"at_8000_kwh":3363.35},"marginal_rates":{"excess_unit_cost_cents":42.8,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo964319sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 GLO964319SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 0.00 cents per kWh solar feed-in (inc. GST if any).","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.0000 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"For further information about this offer call GloBird on 133456 or visit www.globirdenergy.com.au or see our full terms and conditions here: www.globirdenergy.com.au/legal/","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","onExpiryDescription":"You will be notified of a new plan 1 month before the expiry date","billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"CONNECTION","amount":"70.00","description":"Min connection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"70.00","description":"Min disconnection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":42.8},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.9},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":42.8},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":28.4},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":42.8}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.6},{"plan_id":"globird-glo964318sre1eme-electricity","cdr_plan_id":"GLO964318SRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"Resi Standing Offer Prices (Flex Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":155,"peak_cents_per_kwh":42.8,"off_peak_cents_per_kwh":32.9,"shoulder_cents_per_kwh":28.4,"peak_hours":"3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1614.85,"at_4000_kwh":1964.55,"at_5000_kwh":2314.25,"at_8000_kwh":3363.35},"marginal_rates":{"excess_unit_cost_cents":42.8,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo964318sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 GLO964318SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 0.00 cents per kWh solar feed-in (inc. GST if any).","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.0000 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"For further information about this offer call GloBird on 133456 or visit www.globirdenergy.com.au or see our full terms and conditions here: www.globirdenergy.com.au/legal/","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","onExpiryDescription":"You will be notified of a new plan 1 month before the expiry date","billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"CONNECTION","amount":"70.00","description":"Min connection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"70.00","description":"Min disconnection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":42.8},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":32.9},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":42.8},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":28.4},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":42.8}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.6},{"plan_id":"origin-ori665067mre15eme-electricity","cdr_plan_id":"ORI665067MRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Everyday Rewards Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.3,"supply_charge_cents_per_day":97,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":40.3},{"volume_kwh":null,"rate_cents_per_kwh":43.55}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1563.05,"at_4000_kwh":1966.05,"at_5000_kwh":2401.55,"at_8000_kwh":3708.05},"marginal_rates":{"excess_unit_cost_cents":40.3,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Everyday Rewards Membership"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori665067mre15eme-electricity&source=ai","last_verified":"2025-10-15","source_doc":"CDR EnergyPlanDetailV3 ORI665067MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"Your usage and supply Charges and other charges such as charges for Add-ons and any solar feed-in tariff may change during the Energy Plan period. If they do change, we�ll let you know at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Everyday Rewards Points","description":"You will receive up to 5000 one-off Everyday Rewards points, approximately 45 days after your Acceptance date and ongoing 1 Everyday Rewards point per $1 (incl GST) charged on your bill for your usage and supply during energy plan period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.6},{"plan_id":"origin-ori665059mre15eme-electricity","cdr_plan_id":"ORI665059MRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Everyday Rewards Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.3,"supply_charge_cents_per_day":97,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":40.3},{"volume_kwh":null,"rate_cents_per_kwh":43.55}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1563.05,"at_4000_kwh":1966.05,"at_5000_kwh":2401.55,"at_8000_kwh":3708.05},"marginal_rates":{"excess_unit_cost_cents":40.3,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Everyday Rewards Membership"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori665059mre15eme-electricity&source=ai","last_verified":"2025-10-15","source_doc":"CDR EnergyPlanDetailV3 ORI665059MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Offer not available in all areas or properties connecting for first time. Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions for more.","variation":"Your usage and supply Charges and other charges such as charges for Add-ons and any solar feed-in tariff may change during the Energy Plan period. If they do change, we�ll let you know at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Everyday Rewards Points","description":"You will receive up to 5000 one-off Everyday Rewards points, approximately 45 days after your Acceptance date and ongoing 1 Everyday Rewards point per $1 (incl GST) charged on your bill for your usage and supply during energy plan period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.6},{"plan_id":"origin-ori1018760mbe1eme-electricity","cdr_plan_id":"ORI1018760MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018760mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018760MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori1018754mbe1eme-electricity","cdr_plan_id":"ORI1018754MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018754mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018754MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori1007207mbe2eme-electricity","cdr_plan_id":"ORI1007207MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007207mbe2eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI1007207MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori953124mbe3eme-electricity","cdr_plan_id":"ORI953124MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953124mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953124MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori953154mbe3eme-electricity","cdr_plan_id":"ORI953154MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953154mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953154MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori953120mbe3eme-electricity","cdr_plan_id":"ORI953120MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953120mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953120MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori1007203mbe2eme-electricity","cdr_plan_id":"ORI1007203MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007203mbe2eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI1007203MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori953167mbe3eme-electricity","cdr_plan_id":"ORI953167MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953167mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953167MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori953158mbe3eme-electricity","cdr_plan_id":"ORI953158MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953158mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953158MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori953103mbe3eme-electricity","cdr_plan_id":"ORI953103MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953103mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953103MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori953133mbe3eme-electricity","cdr_plan_id":"ORI953133MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953133mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953133MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori953171mbe3eme-electricity","cdr_plan_id":"ORI953171MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953171mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953171MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori953107mbe3eme-electricity","cdr_plan_id":"ORI953107MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953107mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953107MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"origin-ori953137mbe3eme-electricity","cdr_plan_id":"ORI953137MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.82,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1580.59,"at_4000_kwh":1968.79,"at_5000_kwh":2356.99,"at_8000_kwh":3521.59},"marginal_rates":{"excess_unit_cost_cents":38.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953137mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953137MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"globird-glo1054013mre1eme-electricity","cdr_plan_id":"GLO1054013MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"ULTRASAVE Residential (Flexible Rate CTL Load)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":140,"peak_cents_per_kwh":48,"off_peak_cents_per_kwh":31.5,"shoulder_cents_per_kwh":31.5,"peak_hours":"3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1604.5,"at_4000_kwh":1969,"at_5000_kwh":2333.5,"at_8000_kwh":3427},"marginal_rates":{"excess_unit_cost_cents":48,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054013mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054013MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar feed-in (inc. GST if any).","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers without an eligible smart meter and with an applicable network tariff. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":48},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":31.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":31.5},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":48}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"globird-glo1054014mre1eme-electricity","cdr_plan_id":"GLO1054014MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"ULTRASAVE Residential (Flexible Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":140,"peak_cents_per_kwh":48,"off_peak_cents_per_kwh":31.5,"shoulder_cents_per_kwh":31.5,"peak_hours":"3pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-12:59am mon, tue, wed, thu, fri, sat, sun; 6am-9:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1604.5,"at_4000_kwh":1969,"at_5000_kwh":2333.5,"at_8000_kwh":3427},"marginal_rates":{"excess_unit_cost_cents":48,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054014mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054014MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar feed-in (inc. GST if any).","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers without an eligible smart meter and with an applicable network tariff. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":48},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":31.5},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":48},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":31.5},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":48}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"blue-nrg-blu1033547mbe1eme-electricity","cdr_plan_id":"BLU1033547MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Diamond 2026","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.11,"supply_charge_cents_per_day":67.14},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1538.36,"at_4000_kwh":1969.46,"at_5000_kwh":2400.56,"at_8000_kwh":3693.86},"marginal_rates":{"excess_unit_cost_cents":43.11,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"No Restrictions"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1033547mbe1eme-electricity&source=ai","last_verified":"2026-01-28","source_doc":"CDR EnergyPlanDetailV3 BLU1033547MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due dat","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"blue-nrg-blu1033552mbe1eme-electricity","cdr_plan_id":"BLU1033552MBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"Blue Diamond 2026","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.11,"supply_charge_cents_per_day":67.14},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1538.36,"at_4000_kwh":1969.46,"at_5000_kwh":2400.56,"at_8000_kwh":3693.86},"marginal_rates":{"excess_unit_cost_cents":43.11,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"No Restrictions"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu1033552mbe1eme-electricity&source=ai","last_verified":"2026-01-28","source_doc":"CDR EnergyPlanDetailV3 BLU1033552MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"21.23","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.89","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.00","description":"Paper Bill Fee","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"13.2","description":"A late payment fee may be charged when full payment has not been received by the bill due dat","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"energy-locals-retail-lcl986599mbe1eme-electricity","cdr_plan_id":"LCL986599MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Member - Bonus Credit","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":123.18,"peak_cents_per_kwh":53.64,"off_peak_cents_per_kwh":29.09,"shoulder_cents_per_kwh":36.82,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 10am-3:59pm mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-4:59pm sat, sun; 9pm-11:59pm sat, sun","shoulder_hours":"7am-9:59am mon, tue, wed, thu, fri; 4pm-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Sign Up Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$175 credit is available for new customers only, and is applied if your electricity supply remains with us for 6 months."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1589.64,"at_4000_kwh":1969.65,"at_5000_kwh":2349.66,"at_8000_kwh":3489.69},"marginal_rates":{"excess_unit_cost_cents":53.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986599mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986599MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"MEMBERSHIP","amount":"389.88","description":"Access wholesale energy rates with a $32.49/month membership fee.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.09},{"type":"SHOULDER","startHour":7,"endHour":10,"rateCents":36.82},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":29.09},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":36.82},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":53.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.09},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":53.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"diamond-dia934003sre1eme-electricity","cdr_plan_id":"DIA934003SRE1@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Standing TOU","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.12,"peak_cents_per_kwh":50,"off_peak_cents_per_kwh":39,"shoulder_cents_per_kwh":28.15,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1569.34,"at_4000_kwh":1970.64,"at_5000_kwh":2371.94,"at_8000_kwh":3575.84},"marginal_rates":{"excess_unit_cost_cents":50,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia934003sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 DIA934003SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms & conditions, visit our website www.diamondenergy.com.au or contact us on 1300 838 009.","variation":"Variations to energy rates will be published on our website at least 10 business days prior to commencement and we'll provide written notice at least 5 days prior to commencement. Standing offer prices will not be varied more often than once every 6 months. Other charges may be varied with notice.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":39},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":50},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":28.15},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":50}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"diamond-dia786918sre3eme-electricity","cdr_plan_id":"DIA786918SRE3@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Standing TOU","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":100.12,"peak_cents_per_kwh":50,"off_peak_cents_per_kwh":39,"shoulder_cents_per_kwh":28.15,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1569.34,"at_4000_kwh":1970.64,"at_5000_kwh":2371.94,"at_8000_kwh":3575.84},"marginal_rates":{"excess_unit_cost_cents":50,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia786918sre3eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 DIA786918SRE3@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms & conditions, visit our website www.diamondenergy.com.au or contact us on 1300 838 009.","variation":"Variations to energy rates will be published on our website at least 10 business days prior to commencement and we'll provide written notice at least 5 days prior to commencement. Standing offer prices will not be varied more often than once every 6 months. Other charges may be varied with notice.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":39},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":50},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":28.15},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":50}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.4},{"plan_id":"diamond-dia786883mbe4eme-electricity","cdr_plan_id":"DIA786883MBE4@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday - T52","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":128.07,"peak_cents_per_kwh":49.97,"off_peak_cents_per_kwh":32.46,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1598.85,"at_4000_kwh":1975.98,"at_5000_kwh":2353.11,"at_8000_kwh":3484.5},"marginal_rates":{"excess_unit_cost_cents":49.97,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia786883mbe4eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 DIA786883MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For full terms & conditions and solar feed in tariff eligibility, visit our website www.diamondenergy.com.au.","variation":"We may vary the Charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.46},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.97},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.46}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":32.46}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.1},{"plan_id":"diamond-dia933990mbe2eme-electricity","cdr_plan_id":"DIA933990MBE2@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday - T52","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":128.07,"peak_cents_per_kwh":49.97,"off_peak_cents_per_kwh":32.46,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1598.85,"at_4000_kwh":1975.98,"at_5000_kwh":2353.11,"at_8000_kwh":3484.5},"marginal_rates":{"excess_unit_cost_cents":49.97,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia933990mbe2eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 DIA933990MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For full terms & conditions and solar feed in tariff eligibility, visit our website www.diamondenergy.com.au.","variation":"We may vary the Charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.46},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.97},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.46}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":32.46}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.1},{"plan_id":"diamond-dia786930sbe3eme-electricity","cdr_plan_id":"DIA786930SBE3@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Standing TOU","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":128.07,"peak_cents_per_kwh":49.97,"off_peak_cents_per_kwh":32.46,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1598.85,"at_4000_kwh":1975.98,"at_5000_kwh":2353.11,"at_8000_kwh":3484.5},"marginal_rates":{"excess_unit_cost_cents":49.97,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia786930sbe3eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 DIA786930SBE3@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms & conditions, visit our website www.diamondenergy.com.au or contact us on 1300 838 009.","variation":"Variations to energy rates will be published on our website at least 10 business days prior to commencement and we'll provide written notice at least 5 days prior to commencement. Standing offer prices will not be varied more often than once every 6 months. Other charges may be varied with notice.","onExpiryDescription":"No fixed term. The agreement continues on a rolling monthly or quarterly basis as per the bill frequency.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.46},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":49.97},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.46}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":32.46}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14.1},{"plan_id":"energy-locals-retail-lcl986574mbe1eme-electricity","cdr_plan_id":"LCL986574MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":175.45,"peak_cents_per_kwh":40.45,"off_peak_cents_per_kwh":30.45,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1643.89,"at_4000_kwh":1978.39,"at_5000_kwh":2312.89,"at_8000_kwh":3316.39},"marginal_rates":{"excess_unit_cost_cents":40.45,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986574mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986574MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.45},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":40.45},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.45}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.45}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":14},{"plan_id":"1st-energy-1st961474sbe1eme-electricity","cdr_plan_id":"1ST961474SBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"Standing Offer - Time of Use + Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":123,"peak_cents_per_kwh":53.9,"off_peak_cents_per_kwh":31.8,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1601.85,"at_4000_kwh":1986.15,"at_5000_kwh":2370.45,"at_8000_kwh":3523.35},"marginal_rates":{"excess_unit_cost_cents":53.9,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st961474sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 1ST961474SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions.","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":31.8},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":53.9},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":31.8}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":31.8}]}]}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.7},{"plan_id":"1st-energy-1st961473sbe1eme-electricity","cdr_plan_id":"1ST961473SBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"Standing Offer - Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":123,"peak_cents_per_kwh":53.9,"off_peak_cents_per_kwh":31.8,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1601.85,"at_4000_kwh":1986.15,"at_5000_kwh":2370.45,"at_8000_kwh":3523.35},"marginal_rates":{"excess_unit_cost_cents":53.9,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st961473sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 1ST961473SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions.","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":31.8},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":53.9},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":31.8}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":31.8}]}]}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.7},{"plan_id":"alinta-ali1008594mre3eme-electricity","cdr_plan_id":"ALI1008594MRE3@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Advantage - Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.85,"supply_charge_cents_per_day":107.64,"block_rates":[{"volume_kwh":3.2877,"rate_cents_per_kwh":39.85},{"volume_kwh":7.6712,"rate_cents_per_kwh":39.85},{"volume_kwh":16.44,"rate_cents_per_kwh":39.85},{"volume_kwh":27.3973,"rate_cents_per_kwh":39.85},{"volume_kwh":null,"rate_cents_per_kwh":39.85}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1588.39,"at_4000_kwh":1986.89,"at_5000_kwh":2385.39,"at_8000_kwh":3580.89},"marginal_rates":{"excess_unit_cost_cents":39.85,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1008594mre3eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 ALI1008594MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.7},{"plan_id":"alinta-ali1008593mre3eme-electricity","cdr_plan_id":"ALI1008593MRE3@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Advantage - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.85,"supply_charge_cents_per_day":107.64,"block_rates":[{"volume_kwh":3.2877,"rate_cents_per_kwh":39.85},{"volume_kwh":7.6712,"rate_cents_per_kwh":39.85},{"volume_kwh":16.44,"rate_cents_per_kwh":39.85},{"volume_kwh":27.3973,"rate_cents_per_kwh":39.85},{"volume_kwh":null,"rate_cents_per_kwh":39.85}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1588.39,"at_4000_kwh":1986.89,"at_5000_kwh":2385.39,"at_8000_kwh":3580.89},"marginal_rates":{"excess_unit_cost_cents":39.85,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1008593mre3eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 ALI1008593MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.7},{"plan_id":"origin-ori727579mre11eme-electricity","cdr_plan_id":"ORI727579MRE11@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Solar Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.73,"supply_charge_cents_per_day":98.03,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":40.73},{"volume_kwh":null,"rate_cents_per_kwh":44.01}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1579.71,"at_4000_kwh":1987.01,"at_5000_kwh":2427.11,"at_8000_kwh":3747.41},"marginal_rates":{"excess_unit_cost_cents":40.73,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori727579mre11eme-electricity&source=ai","last_verified":"2025-11-20","source_doc":"CDR EnergyPlanDetailV3 ORI727579MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 5 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"A payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.6},{"plan_id":"origin-ori727565mre11eme-electricity","cdr_plan_id":"ORI727565MRE11@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Go Solar Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.73,"supply_charge_cents_per_day":98.03,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":40.73},{"volume_kwh":null,"rate_cents_per_kwh":44.01}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1579.71,"at_4000_kwh":1987.01,"at_5000_kwh":2427.11,"at_8000_kwh":3747.41},"marginal_rates":{"excess_unit_cost_cents":40.73,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori727565mre11eme-electricity&source=ai","last_verified":"2025-11-20","source_doc":"CDR EnergyPlanDetailV3 ORI727565MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 5 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"A payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.6},{"plan_id":"powershop-psh997577mbe1eme-electricity","cdr_plan_id":"PSH997577MBE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":37.63,"supply_charge_cents_per_day":132.8},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1613.62,"at_4000_kwh":1989.92,"at_5000_kwh":2366.22,"at_8000_kwh":3495.12},"marginal_rates":{"excess_unit_cost_cents":37.63,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh997577mbe1eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH997577MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to Powershop automatically debiting your preferred payment method for any outstanding amounts due. Further information in relation to this offer, see our terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). We offer 10%, 25%, 50% and 100% GreenPower.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.5},{"plan_id":"powershop-psh997567mbe1eme-electricity","cdr_plan_id":"PSH997567MBE1@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Power Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":37.63,"supply_charge_cents_per_day":132.8},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1613.62,"at_4000_kwh":1989.92,"at_5000_kwh":2366.22,"at_8000_kwh":3495.12},"marginal_rates":{"excess_unit_cost_cents":37.63,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh997567mbe1eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH997567MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to Powershop automatically debiting your preferred payment method for any outstanding amounts due. Further information in relation to this offer, see our terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). We offer 10%, 25%, 50% and 100% GreenPower.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.5},{"plan_id":"origin-ori1057331mbe2eme-electricity","cdr_plan_id":"ORI1057331MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable (New and Moving Customers)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame; New and Moving Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1057331mbe2eme-electricity&source=ai","last_verified":"2026-05-19","source_doc":"CDR EnergyPlanDetailV3 ORI1057331MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$300 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori1057333mbe2eme-electricity","cdr_plan_id":"ORI1057333MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable (New and Moving Customers)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame; New and Moving Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1057333mbe2eme-electricity&source=ai","last_verified":"2026-05-19","source_doc":"CDR EnergyPlanDetailV3 ORI1057333MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$300 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori953008mbe6eme-electricity","cdr_plan_id":"ORI953008MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953008mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953008MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori953052mbe6eme-electricity","cdr_plan_id":"ORI953052MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953052mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953052MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori953077mbe6eme-electricity","cdr_plan_id":"ORI953077MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953077mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953077MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori953026mbe6eme-electricity","cdr_plan_id":"ORI953026MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953026mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953026MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori953012mbe6eme-electricity","cdr_plan_id":"ORI953012MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953012mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953012MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori953030mbe6eme-electricity","cdr_plan_id":"ORI953030MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953030mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953030MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori1020156mbe4eme-electricity","cdr_plan_id":"ORI1020156MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Comparable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020156mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1020156MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori1020154mbe4eme-electricity","cdr_plan_id":"ORI1020154MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Comparable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020154mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1020154MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori953048mbe6eme-electricity","cdr_plan_id":"ORI953048MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953048mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953048MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori953081mbe6eme-electricity","cdr_plan_id":"ORI953081MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953081mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953081MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori988094mbe5eme-electricity","cdr_plan_id":"ORI988094MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Go Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988094mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988094MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori988104mbe5eme-electricity","cdr_plan_id":"ORI988104MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Go Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988104mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988104MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori988110mbe5eme-electricity","cdr_plan_id":"ORI988110MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - One Click Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988110mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988110MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori988121mbe5eme-electricity","cdr_plan_id":"ORI988121MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - One Click Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988121mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988121MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori1007205mbe4eme-electricity","cdr_plan_id":"ORI1007205MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007205mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1007205MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori1007206mbe4eme-electricity","cdr_plan_id":"ORI1007206MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007206mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1007206MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori1018513mbe1eme-electricity","cdr_plan_id":"ORI1018513MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018513mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018513MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori1018518mbe1eme-electricity","cdr_plan_id":"ORI1018518MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018518mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018518MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori430658mbe17eme-electricity","cdr_plan_id":"ORI430658MBE17@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430658mbe17eme-electricity&source=ai","last_verified":"2025-10-23","source_doc":"CDR EnergyPlanDetailV3 ORI430658MBE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"origin-ori430659mbe17eme-electricity","cdr_plan_id":"ORI430659MBE17@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.66,"supply_charge_cents_per_day":100.29},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1585.86,"at_4000_kwh":1992.46,"at_5000_kwh":2399.06,"at_8000_kwh":3618.86},"marginal_rates":{"excess_unit_cost_cents":40.66,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430659mbe17eme-electricity&source=ai","last_verified":"2025-10-23","source_doc":"CDR EnergyPlanDetailV3 ORI430659MBE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.4},{"plan_id":"dodo-dod14015sre11eme-electricity","cdr_plan_id":"DOD14015SRE11@EME","retailer":"Dodo Power & Gas","retailer_slug":"dodo","retailer_logo_uri":"https://s0.2mdn.net/creatives/assets/4983616/Dodo_Logo_Aug23_V1.svg","plan_name":"Residential Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.04,"supply_charge_cents_per_day":152.96},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1639.5,"at_4000_kwh":1999.9,"at_5000_kwh":2360.3,"at_8000_kwh":3441.5},"marginal_rates":{"excess_unit_cost_cents":36.04,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=dodo-dod14015sre11eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 DOD14015SRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Solar FIT Scheme (DFIT1) & (DFIT1A)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer Feed-in Tariff - This plan is available to eligible small solar customers with a maximum 10kW panel size and an inverter system no greater than 10kW as part of an ongoing contract.","type":"single","rate_cents_per_kwh":1}],"terms":"See our Standing terms and conditions at www.dodo.com/energy/terms-prices-and-regulatory-information. If you are eligible, you can apply to the SA Government to receive applicable energy concessions.","variation":"We may vary these prices no more than once every 6 months, and provide you notice of any changes at least 5 business days before the change is effective. We will publish variations on our website and in a newspaper at least 10 business days prior.","onExpiryDescription":"Standing contracts do not expire until you notify us in accordance with our Standing Contract Terms and Conditions.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For further details on the information and fees presented, or the terms and conditions of the contract, please visit www.dodo.com/energy/terms-prices-and-regulatory-information or contact us on 13 dodo (13 36 36).","fees":[{"type":"DD_DISHONOUR","amount":"9.5","description":"Dishonoured Payment fee of $9.50 (inc GST) may apply to payments we attempt that are subsequently declined.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move into a property.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move out of a property.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply when moving into your property and connecting electricity to your property.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13.1},{"plan_id":"energy-locals-retail-lcl987117sre1eme-electricity","cdr_plan_id":"LCL987117SRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":219.09,"peak_cents_per_kwh":37.73,"off_peak_cents_per_kwh":28.18,"shoulder_cents_per_kwh":23.18,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-11:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1701.03,"at_4000_kwh":2001.48,"at_5000_kwh":2301.93,"at_8000_kwh":3203.28},"marginal_rates":{"excess_unit_cost_cents":37.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl987117sre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL987117SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6,"rateCents":28.18},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":37.73},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":23.18},{"type":"PEAK","startHour":16,"endHour":24,"rateCents":37.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":13},{"plan_id":"ovo-energy-ovo704388mre20eme-electricity","cdr_plan_id":"OVO704388MRE20@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":140.7,"peak_cents_per_kwh":44.73,"off_peak_cents_per_kwh":35.39,"shoulder_cents_per_kwh":30.66,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1630.94,"at_4000_kwh":2003.39,"at_5000_kwh":2375.85,"at_8000_kwh":3493.23},"marginal_rates":{"excess_unit_cost_cents":44.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704388mre20eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704388MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":44.73},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.39},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":44.73},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.66},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":44.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.9},{"plan_id":"ovo-energy-ovo704387mre20eme-electricity","cdr_plan_id":"OVO704387MRE20@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":140.7,"peak_cents_per_kwh":44.73,"off_peak_cents_per_kwh":35.39,"shoulder_cents_per_kwh":30.66,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1630.94,"at_4000_kwh":2003.39,"at_5000_kwh":2375.85,"at_8000_kwh":3493.23},"marginal_rates":{"excess_unit_cost_cents":44.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704387mre20eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704387MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":44.73},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":35.39},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":44.73},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.66},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":44.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.9},{"plan_id":"agl-agl1055723mre1eme-electricity","cdr_plan_id":"AGL1055723MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055723mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055723MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃƒÂ¢Ã¢â€šÂ¬Ã¢â€žÂ¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl1055720mre1eme-electricity","cdr_plan_id":"AGL1055720MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055720mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055720MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃƒÂ¢Ã¢â€šÂ¬Ã¢â€žÂ¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl1055666mre1eme-electricity","cdr_plan_id":"AGL1055666MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055666mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055666MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl1055709mre1eme-electricity","cdr_plan_id":"AGL1055709MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055709mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055709MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl1055706mre1eme-electricity","cdr_plan_id":"AGL1055706MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055706mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055706MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl1055669mre1eme-electricity","cdr_plan_id":"AGL1055669MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055669mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055669MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":1}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl898910mre10eme-electricity","cdr_plan_id":"AGL898910MRE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898910mre10eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898910MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl898911mre10eme-electricity","cdr_plan_id":"AGL898911MRE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - New To AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl898911mre10eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL898911MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl698047mre23eme-electricity","cdr_plan_id":"AGL698047MRE23@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl698047mre23eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL698047MRE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl698051mre23eme-electricity","cdr_plan_id":"AGL698051MRE23@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl698051mre23eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL698051MRE23@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl15406mre52eme-electricity","cdr_plan_id":"AGL15406MRE52@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl15406mre52eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL15406MRE52@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃƒÂ¢Ã¢â€šÂ¬Ã¢â€žÂ¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"agl-agl15407mre52eme-electricity","cdr_plan_id":"AGL15407MRE52@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Solar Savers - 3rd Party","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.94,"supply_charge_cents_per_day":101.38,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":40.94},{"volume_kwh":null,"rate_cents_per_kwh":40.94}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1598.24,"at_4000_kwh":2007.64,"at_5000_kwh":2417.04,"at_8000_kwh":3645.24},"marginal_rates":{"excess_unit_cost_cents":40.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl15407mre52eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL15407MRE52@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff for the first 10kWh per day (<10kWh per day)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"For the first 10kwh","description":"AGL Retailer Feed-in Tariff Thereafter (>10kWh per day)","type":"single","rate_cents_per_kwh":2}],"terms":"Offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the T&Cs applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"Energy rates may be varied at any time by giving you written notice at least 5 business days prior to the change. Other charges and tariffs, including daily export caps and Solar Feed-in Tarriffs, may be varied with notice to you","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLÃƒÂ¢Ã¢â€šÂ¬Ã¢â€žÂ¢s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"powershop-psh1012889mre4eme-electricity","cdr_plan_id":"PSH1012889MRE4@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Switch Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.61,"supply_charge_cents_per_day":116.42},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Conditional Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$200 sign up credit is available to new and moving customers only, and is applied to your bill 180 days after your Powershop online account has become active. We will send you an email letting you know when you're officially a customer."}],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1613.23,"at_4000_kwh":2009.33,"at_5000_kwh":2405.43,"at_8000_kwh":3593.73},"marginal_rates":{"excess_unit_cost_cents":39.61,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are eligible"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1012889mre4eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 PSH1012889MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"We do not issue paper bills and require a credit card or bank details��. For more information in relation to Powershop and this offer, see full terms and conditions at: www.powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"powershop-psh1012871mre4eme-electricity","cdr_plan_id":"PSH1012871MRE4@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Switch Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.61,"supply_charge_cents_per_day":116.42},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Conditional Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$200 sign up credit is available to new and moving customers only, and is applied to your bill 180 days after your Powershop online account has become active. We will send you an email letting you know when you're officially a customer."}],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1613.23,"at_4000_kwh":2009.33,"at_5000_kwh":2405.43,"at_8000_kwh":3593.73},"marginal_rates":{"excess_unit_cost_cents":39.61,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are eligible"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1012871mre4eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 PSH1012871MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"We do not issue paper bills and require a credit card or bank details��. For more information in relation to Powershop and this offer, see full terms and conditions at: www.powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"covau-cov1030370sre1eme-electricity","cdr_plan_id":"COV1030370SRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"CovaU Basics Residential Single","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.4,"supply_charge_cents_per_day":118.8},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1615.62,"at_4000_kwh":2009.62,"at_5000_kwh":2403.62,"at_8000_kwh":3585.62},"marginal_rates":{"excess_unit_cost_cents":39.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1030370sre1eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 COV1030370SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-In Tariff: Single Rate Feed In Tariff","description":"Feed-In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"covau-cov1030373sre1eme-electricity","cdr_plan_id":"COV1030373SRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"CovaU Basics Residential Single + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.4,"supply_charge_cents_per_day":118.8},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1615.62,"at_4000_kwh":2009.62,"at_5000_kwh":2403.62,"at_8000_kwh":3585.62},"marginal_rates":{"excess_unit_cost_cents":39.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1030373sre1eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 COV1030373SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-In Tariff: Single Rate Feed In Tariff","description":"Feed-In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.7},{"plan_id":"tango-tan918721mre1eme-electricity","cdr_plan_id":"TAN918721MRE1@EME","retailer":"Tango Energy","retailer_slug":"tango","retailer_logo_uri":"https://www.tangoenergy.com/sites/default/files/2022-08/Default-Logo-Tango.png","plan_name":"Home Select","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.23,"supply_charge_cents_per_day":99},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1598.25,"at_4000_kwh":2010.55,"at_5000_kwh":2422.85,"at_8000_kwh":3659.75},"marginal_rates":{"excess_unit_cost_cents":41.23,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=tango-tan918721mre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 TAN918721MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Distributor feed-in tariff: Single Rate Solar FiT","description":"Distributor feed-in tariff | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer FIT: Single Rate Solar FiT","description":"Voluntary | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"This contract is ongoing and may be terminated by you or us in accordance with the terms of our Market Agreement. The full terms and conditions applicable to this offer are available at http://tangoenergy.com/terms-and-conditions. For further information about this offer, our market terms or solar feed-in eligibility, call Tango Energy on 1800 010 648.","variation":"Prices are variable and may be varied by notice to you. We will provide you with information about any variations to your prices in accordance with Energy Laws. A network tariff change may be required if you have a solar system installed.","onExpiryDescription":"Our market agreement is ongoing and may be ended by you or us in accordance with the terms of our agreement.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Usage aggregated according to Australian Eastern Standard Time (AEST). Your usage may be adjusted for local time (Australian Daylight Savings Time). Further information on our charges is available at: http://tangoenergy.com/additional-charges","fees":[{"type":"PAYMENT_PROCESSING","amount":"0.006","description":"For payments made by MasterCard or Visa where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"OTHER","amount":"0.0075","description":"For payments made by AMEX or any other payment where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.0075"},{"type":"OTHER","amount":"7.5","description":"This fee will apply if a direct debit, credit card or cheque payment is dishonoured or reversed.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with a basic meter with the power off. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving out and disconnecting with a smart meter or a basic meter. Does not apply to customers switching to another retailer at the same supply address.","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with smart meter or basic meter with the power on. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.3","description":"Paper bill fee $3.30 (inc. GST) for each paper bill.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.6},{"plan_id":"tango-tan918722mre1eme-electricity","cdr_plan_id":"TAN918722MRE1@EME","retailer":"Tango Energy","retailer_slug":"tango","retailer_logo_uri":"https://www.tangoenergy.com/sites/default/files/2022-08/Default-Logo-Tango.png","plan_name":"Home Select","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.23,"supply_charge_cents_per_day":99},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1598.25,"at_4000_kwh":2010.55,"at_5000_kwh":2422.85,"at_8000_kwh":3659.75},"marginal_rates":{"excess_unit_cost_cents":41.23,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=tango-tan918722mre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 TAN918722MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Distributor feed-in tariff: Single Rate Solar FiT","description":"Distributor feed-in tariff | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer FIT: Single Rate Solar FiT","description":"Voluntary | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"This contract is ongoing and may be terminated by you or us in accordance with the terms of our Market Agreement. The full terms and conditions applicable to this offer are available at http://tangoenergy.com/terms-and-conditions. For further information about this offer, our market terms or solar feed-in eligibility, call Tango Energy on 1800 010 648.","variation":"Prices are variable and may be varied by notice to you. We will provide you with information about any variations to your prices in accordance with Energy Laws. A network tariff change may be required if you have a solar system installed.","onExpiryDescription":"Our market agreement is ongoing and may be ended by you or us in accordance with the terms of our agreement.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Usage aggregated according to Australian Eastern Standard Time (AEST). Your usage may be adjusted for local time (Australian Daylight Savings Time). Further information on our charges is available at: http://tangoenergy.com/additional-charges","fees":[{"type":"PAYMENT_PROCESSING","amount":"0.006","description":"For payments made by MasterCard or Visa where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"OTHER","amount":"0.0075","description":"For payments made by AMEX or any other payment where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.0075"},{"type":"OTHER","amount":"7.5","description":"This fee will apply if a direct debit, credit card or cheque payment is dishonoured or reversed.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with a basic meter with the power off. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving out and disconnecting with a smart meter or a basic meter. Does not apply to customers switching to another retailer at the same supply address.","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with smart meter or basic meter with the power on. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.3","description":"Paper bill fee $3.30 (inc. GST) for each paper bill.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.6},{"plan_id":"1st-energy-1st1042501mre1eme-electricity","cdr_plan_id":"1ST1042501MRE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Ruby - Single Rate + Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.5,"supply_charge_cents_per_day":107,"block_rates":[{"volume_kwh":10.95,"rate_cents_per_kwh":40.5},{"volume_kwh":null,"rate_cents_per_kwh":44.1}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1605.55,"at_4000_kwh":2010.67,"at_5000_kwh":2451.67,"at_8000_kwh":3774.67},"marginal_rates":{"excess_unit_cost_cents":40.5,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042501mre1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042501MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.6},{"plan_id":"1st-energy-1st1042500mre1eme-electricity","cdr_plan_id":"1ST1042500MRE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Ruby - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.5,"supply_charge_cents_per_day":107,"block_rates":[{"volume_kwh":10.95,"rate_cents_per_kwh":40.5},{"volume_kwh":null,"rate_cents_per_kwh":44.1}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1605.55,"at_4000_kwh":2010.67,"at_5000_kwh":2451.67,"at_8000_kwh":3774.67},"marginal_rates":{"excess_unit_cost_cents":40.5,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042500mre1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042500MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.6},{"plan_id":"amber-electric-amb1042914mre1eme-electricity","cdr_plan_id":"AMB1042914MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"CommBank Yello Gold","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Gold Offer","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $180 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Gold segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042914mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042914MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region with a flat rate or demand tariff. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"amber-electric-amb1042920mre1eme-electricity","cdr_plan_id":"AMB1042920MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"CommBank Yello Diamond","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Diamond Offer","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $210 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Diamond segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042920mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042920MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region with a flat rate or demand tariff. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"amber-electric-amb1042921mre1eme-electricity","cdr_plan_id":"AMB1042921MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Amber Plan for Energy Masters","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Amber for Energy Masters Sign Up Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome discount of $100 over 4 months. New residential customers only who are selected to join the Energy Masters project. Additional eligibility criteria apply, see the Energy Masters website at saenergymasters.com.au."},{"type":"other","description":"SA Power Networks Energy Masters Diversify Rebate","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Energy Masters participation Diversify Rebate of $0.33/day for the duration of participation in the Energy Masters project. New residential customers only who are selected to join the Energy Masters project. SA Power Networks Diversify Rebate of $0.33/day is based on households agreeing to trial a flexible network connection. Additional eligibility criteria may apply for more information see the Energy Masters website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042921mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042921MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region selected to participate in the Energy Masters project with a flat rate or demand tariff. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"amber-electric-amb1042902mre1eme-electricity","cdr_plan_id":"AMB1042902MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"CommBank Yello","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Offer","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $120 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042902mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042902MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region with a flat rate or demand tariff. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"amber-electric-amb1042866mre1eme-electricity","cdr_plan_id":"AMB1042866MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Amber Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042866mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042866MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region with a flat rate or demand tariff. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"amber-electric-amb1042872mre1eme-electricity","cdr_plan_id":"AMB1042872MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Amber Plan + Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042872mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042872MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region with a flat rate or demand tariff and controlled load. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"amber-electric-amb1042878mre1eme-electricity","cdr_plan_id":"AMB1042878MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"CL + CommBank Yello","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Offer","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $120 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042878mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042878MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region with a flat rate or demand tariff and controlled load. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"amber-electric-amb1042884mre1eme-electricity","cdr_plan_id":"AMB1042884MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"CL + CommBank Yello Plus","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Plus Offer","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $150 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Plus segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042884mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042884MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region with a flat rate or demand tariff and controlled load. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"amber-electric-amb1042908mre1eme-electricity","cdr_plan_id":"AMB1042908MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"CommBank Yello Plus","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Plus Offer","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $150 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Plus segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042908mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042908MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region with a flat rate or demand tariff. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"amber-electric-amb1042890mre1eme-electricity","cdr_plan_id":"AMB1042890MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"CL + CommBank Yello Gold","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Gold Offer","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $180 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Gold segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042890mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042890MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region with a flat rate or demand tariff and controlled load. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"amber-electric-amb1042896mre1eme-electricity","cdr_plan_id":"AMB1042896MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"CL + CommBank Yello Diamond","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.37,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Diamond Offer","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $210 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Diamond segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1603.14,"at_4000_kwh":2016.84,"at_5000_kwh":2430.54,"at_8000_kwh":3671.64},"marginal_rates":{"excess_unit_cost_cents":41.37,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042896mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042896MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to residential customers in SA Power's distribution region with a flat rate or demand tariff and controlled load. For illustrative purposes, tariff RSR assumed. Feed-In Tariffs are only valid if applicable","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card.","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12.3},{"plan_id":"energy-locals-retail-lcl987127sre1eme-electricity","cdr_plan_id":"LCL987127SRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":33.18,"supply_charge_cents_per_day":191.36},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1693.86,"at_4000_kwh":2025.66,"at_5000_kwh":2357.46,"at_8000_kwh":3352.86},"marginal_rates":{"excess_unit_cost_cents":33.18,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl987127sre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL987127SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":12},{"plan_id":"engie-eng1048441mbe1eme-electricity","cdr_plan_id":"ENG1048441MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Business GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048441mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048441MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_DAY","description":"To participate in the GreenPower accredited program a daily charge of $1.50 (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.5"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng1048442mbe1eme-electricity","cdr_plan_id":"ENG1048442MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Business GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048442mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048442MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_DAY","description":"To participate in the GreenPower accredited program a daily charge of $1.50 (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.5"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng1048978mbe1eme-electricity","cdr_plan_id":"ENG1048978MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Business Flyer Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Virgin Australia BusinessFlyer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048978mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048978MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Velocity Points","description":"You'll receive an upfront bonus of 15,000 Velocity Points, and then you'll receive 3 Velocity Points for every $1 you pay for electricity."}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng1048979mbe1eme-electricity","cdr_plan_id":"ENG1048979MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Business Flyer Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Virgin Australia BusinessFlyer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048979mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048979MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Velocity Points","description":"You'll receive an upfront bonus of 15,000 Velocity Points, and then you'll receive 3 Velocity Points for every $1 you pay for electricity."}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng1048193mbe1eme-electricity","cdr_plan_id":"ENG1048193MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Business GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048193mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048193MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_DAY","description":"To participate in the GreenPower accredited program a daily charge of $1.50 (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.5"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng1048192mbe1eme-electricity","cdr_plan_id":"ENG1048192MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Business GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048192mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048192MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_DAY","description":"To participate in the GreenPower accredited program a daily charge of $1.50 (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.5"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng1049238mbe1eme-electricity","cdr_plan_id":"ENG1049238MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049238mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049238MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng1048626mbe1eme-electricity","cdr_plan_id":"ENG1048626MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048626mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048626MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng1048627mbe1eme-electricity","cdr_plan_id":"ENG1048627MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048627mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048627MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng1049237mbe1eme-electricity","cdr_plan_id":"ENG1049237MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049237mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049237MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng937952sbe4eme-electricity","cdr_plan_id":"ENG937952SBE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng937952sbe4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG937952SBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"engie-eng937951sbe4eme-electricity","cdr_plan_id":"ENG937951SBE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":51.71,"off_peak_cents_per_kwh":35.32,"shoulder_cents_per_kwh":null,"peak_hours":"6:30am-8:29pm mon, tue, wed, thu, fri","off_peak_hours":"8:30pm-6:29am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1626.28,"at_4000_kwh":2028.65,"at_5000_kwh":2431.02,"at_8000_kwh":3638.13},"marginal_rates":{"excess_unit_cost_cents":51.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng937951sbe4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG937951SBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":6.483333333333333,"rateCents":35.32},{"type":"PEAK","startHour":6.5,"endHour":20.483333333333334,"rateCents":51.71},{"type":"OFF_PEAK","startHour":20.5,"endHour":24,"rateCents":35.32}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.32}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"diamond-dia933992mre2eme-electricity","cdr_plan_id":"DIA933992MRE2@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.02,"supply_charge_cents_per_day":84.45},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1598.84,"at_4000_kwh":2029.04,"at_5000_kwh":2459.24,"at_8000_kwh":3749.84},"marginal_rates":{"excess_unit_cost_cents":43.02,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia933992mre2eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 DIA933992MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to customers with a flat-rate network tariff. If your network tariff is amended by your distributor, we will notify you of options available. Full terms & conditions and solar feed in tariff eligibility available on our website. Ongoing discounts of 2% to daily supply and consumption charges for each customer/property you refer for period referee stays with us. Discounts are additive. Pay on Time conditions apply. Your friend also receives $35 (incl. GST) sign up credit.","variation":"We may vary the Charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured payment fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late Payment Fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"diamond-dia786927mre5eme-electricity","cdr_plan_id":"DIA786927MRE5@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.02,"supply_charge_cents_per_day":84.45},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1598.84,"at_4000_kwh":2029.04,"at_5000_kwh":2459.24,"at_8000_kwh":3749.84},"marginal_rates":{"excess_unit_cost_cents":43.02,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia786927mre5eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 DIA786927MRE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to customers with a flat-rate network tariff. If your network tariff is amended by your distributor, we will notify you of options available. Full terms & conditions and solar feed in tariff eligibility available on our website. Ongoing discounts of 2% to daily supply and consumption charges for each customer/property you refer for period referee stays with us. Discounts are additive. Pay on Time conditions apply. Your friend also receives $35 (incl. GST) sign up credit.","variation":"We may vary the Charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured payment fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late Payment Fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"flipped-fea1059494sre1eme-electricity","cdr_plan_id":"FEA1059494SRE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Anytime Standing Offer - Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":33.41,"supply_charge_cents_per_day":189.9},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1695.44,"at_4000_kwh":2029.54,"at_5000_kwh":2363.63,"at_8000_kwh":3365.94},"marginal_rates":{"excess_unit_cost_cents":33.41,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059494sre1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059494SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.8},{"plan_id":"lumo-energy-sa-lum1002049sre2eme-electricity","cdr_plan_id":"LUM1002049SRE2@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer Flat Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":108.75,"peak_cents_per_kwh":40.89,"off_peak_cents_per_kwh":40.89,"shoulder_cents_per_kwh":40.89,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1623.64,"at_4000_kwh":2032.54,"at_5000_kwh":2441.44,"at_8000_kwh":3668.14},"marginal_rates":{"excess_unit_cost_cents":40.89,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum1002049sre2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM1002049SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":40.89},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":40.89},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":40.89},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":40.89},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":40.89}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.7},{"plan_id":"lumo-energy-sa-lum19153sre18eme-electricity","cdr_plan_id":"LUM19153SRE18@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.89,"supply_charge_cents_per_day":108.75},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1623.64,"at_4000_kwh":2032.54,"at_5000_kwh":2441.44,"at_8000_kwh":3668.14},"marginal_rates":{"excess_unit_cost_cents":40.89,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum19153sre18eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM19153SRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.7},{"plan_id":"lumo-energy-sa-lum1002053sre2eme-electricity","cdr_plan_id":"LUM1002053SRE2@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer Flat Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":108.75,"peak_cents_per_kwh":40.89,"off_peak_cents_per_kwh":40.89,"shoulder_cents_per_kwh":40.89,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1623.64,"at_4000_kwh":2032.54,"at_5000_kwh":2441.44,"at_8000_kwh":3668.14},"marginal_rates":{"excess_unit_cost_cents":40.89,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum1002053sre2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM1002053SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":40.89},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":40.89},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":40.89},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":40.89},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":40.89}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.7},{"plan_id":"lumo-energy-sa-lum145165sre15eme-electricity","cdr_plan_id":"LUM145165SRE15@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer (TOUCL)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.89,"supply_charge_cents_per_day":108.75},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1623.64,"at_4000_kwh":2032.54,"at_5000_kwh":2441.44,"at_8000_kwh":3668.14},"marginal_rates":{"excess_unit_cost_cents":40.89,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum145165sre15eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM145165SRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.7},{"plan_id":"lumo-energy-sa-lum19152sre20eme-electricity","cdr_plan_id":"LUM19152SRE20@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.89,"supply_charge_cents_per_day":108.75},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1623.64,"at_4000_kwh":2032.54,"at_5000_kwh":2441.44,"at_8000_kwh":3668.14},"marginal_rates":{"excess_unit_cost_cents":40.89,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum19152sre20eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM19152SRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.7},{"plan_id":"red-energy-red1002056sre2eme-electricity","cdr_plan_id":"RED1002056SRE2@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer Flat Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":108.75,"peak_cents_per_kwh":40.89,"off_peak_cents_per_kwh":40.89,"shoulder_cents_per_kwh":40.89,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1623.64,"at_4000_kwh":2032.54,"at_5000_kwh":2441.44,"at_8000_kwh":3668.14},"marginal_rates":{"excess_unit_cost_cents":40.89,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red1002056sre2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED1002056SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":40.89},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":40.89},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":40.89},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":40.89},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":40.89}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.7},{"plan_id":"red-energy-red21278sre15eme-electricity","cdr_plan_id":"RED21278SRE15@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.89,"supply_charge_cents_per_day":108.75},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1623.64,"at_4000_kwh":2032.54,"at_5000_kwh":2441.44,"at_8000_kwh":3668.14},"marginal_rates":{"excess_unit_cost_cents":40.89,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red21278sre15eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED21278SRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.7},{"plan_id":"red-energy-red1002058sre2eme-electricity","cdr_plan_id":"RED1002058SRE2@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer Flat Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":108.75,"peak_cents_per_kwh":40.89,"off_peak_cents_per_kwh":40.89,"shoulder_cents_per_kwh":40.89,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1623.64,"at_4000_kwh":2032.54,"at_5000_kwh":2441.44,"at_8000_kwh":3668.14},"marginal_rates":{"excess_unit_cost_cents":40.89,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red1002058sre2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED1002058SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":40.89},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":40.89},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":40.89},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":40.89},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":40.89}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.7},{"plan_id":"red-energy-red145169sre14eme-electricity","cdr_plan_id":"RED145169SRE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer (TOUCL)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.89,"supply_charge_cents_per_day":108.75},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1623.64,"at_4000_kwh":2032.54,"at_5000_kwh":2441.44,"at_8000_kwh":3668.14},"marginal_rates":{"excess_unit_cost_cents":40.89,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red145169sre14eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED145169SRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.7},{"plan_id":"red-energy-red21277sre16eme-electricity","cdr_plan_id":"RED21277SRE16@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.89,"supply_charge_cents_per_day":108.75},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1623.64,"at_4000_kwh":2032.54,"at_5000_kwh":2441.44,"at_8000_kwh":3668.14},"marginal_rates":{"excess_unit_cost_cents":40.89,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red21277sre16eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED21277SRE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.7},{"plan_id":"momentum-mom919635mbe6eme-electricity","cdr_plan_id":"MOM919635MBE6@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Pure Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.8,"supply_charge_cents_per_day":153.7},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1665,"at_4000_kwh":2033.01,"at_5000_kwh":2401.01,"at_8000_kwh":3505.01},"marginal_rates":{"excess_unit_cost_cents":36.8,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919635mbe6eme-electricity&source=ai","last_verified":"2026-05-20","source_doc":"CDR EnergyPlanDetailV3 MOM919635MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must have an ABN, communicate with us and receive your bills electronically, have the necessary metering configuration and meet all eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"red-energy-red927291mre2eme-electricity","cdr_plan_id":"RED927291MRE2@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red EV Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":47.7,"supply_charge_cents_per_day":97,"free_window_start":"12:00","free_window_end":"14:00","free_window_fraction":0.12,"original_tariff_type":"time_of_use","peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"12pm–2pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1613.33,"at_4000_kwh":2033.09,"at_5000_kwh":2452.85,"at_8000_kwh":3712.13},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Online or phone sign up; You own an electric vehicle"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red927291mre2eme-electricity&source=ai","last_verified":"2025-12-16","source_doc":"CDR EnergyPlanDetailV3 RED927291MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"Red Energy may withdraw this offer at any time. This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free Electricity Use Period","description":"Between 12pm and 2pm Saturday and Sunday, your electricity usage charges will be waived for any electricity consumed at your Supply Address. Excludes Service to Property charges and GreenPower charges (if applicable)."},{"category":"OTHER","displayName":"Renewable Matching Promise","description":"For every unit of electricity you buy from Red Energy, Snowy Hydro Limited will match it by generating one unit of electricity from a renewable source."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":12,"rateCents":47.7},{"type":"OFF_PEAK","startHour":12,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"red-energy-red927290mre2eme-electricity","cdr_plan_id":"RED927290MRE2@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red EV Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":47.7,"supply_charge_cents_per_day":97,"free_window_start":"12:00","free_window_end":"14:00","free_window_fraction":0.12,"original_tariff_type":"time_of_use","peak_cents_per_kwh":47.7,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"12pm–2pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1613.33,"at_4000_kwh":2033.09,"at_5000_kwh":2452.85,"at_8000_kwh":3712.13},"marginal_rates":{"excess_unit_cost_cents":47.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Online or phone sign up; You own an electric vehicle"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red927290mre2eme-electricity&source=ai","last_verified":"2025-12-16","source_doc":"CDR EnergyPlanDetailV3 RED927290MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"Red Energy may withdraw this offer at any time. This offer is available to residential customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free Electricity Use Period","description":"Between 12pm and 2pm Saturday and Sunday, your electricity usage charges will be waived for any electricity consumed at your Supply Address. Excludes Service to Property charges and GreenPower charges (if applicable)."},{"category":"OTHER","displayName":"Renewable Matching Promise","description":"For every unit of electricity you buy from Red Energy, Snowy Hydro Limited will match it by generating one unit of electricity from a renewable source."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":12,"rateCents":47.7},{"type":"OFF_PEAK","startHour":12,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":47.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"amber-electric-amb1043518mre1eme-electricity","cdr_plan_id":"AMB1043518MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Solar + CBA Yello Plus: Variable Prices (estimate only)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.82,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Plus","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $150 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Plus segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1616.64,"at_4000_kwh":2034.84,"at_5000_kwh":2453.04,"at_8000_kwh":3707.64},"marginal_rates":{"excess_unit_cost_cents":41.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"CommBank Yello Plus; Smart Meter Installation"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043518mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043518MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Estimated wholesale export price","description":"Feed-in price is a 12 month average estimate, based on a typical household solar (5kW) without battery set up in your network with an annual load of 8000kWh and annual exports of 3900kWh (assumes tariff RTOU). Prices are not fixed. Amber passes through wholesale electricity prices directly at cost and has a guaranteed minimum feed-in price of 0c/kWh over a financial year. See www.amber.com.au/pricing for full details.","type":"single","rate_cents_per_kwh":0}],"terms":"Usage price is a 12 month average estimate, based on a typical household solar (5 kW) without battery set up in your network with an annual load of 8000kWh and annual exports of 3900kWh (assumes tariff RTOU). Includes Ambers monthly subscription. See www.amber.com.au/pricing for full details. Prices are not fixed. Amber passes through wholesale electricity prices directly at cost. For full terms and conditions, visit https://www.amber.com.au/terms","variation":"Usage price is a 12 month average estimate only. Actual prices are not fixed and change every 5 or 30 minutes (depending on meter compatibility). Usage is charged at the same wholesale electricity costs that are charged to us. Prices are determined by a range of factors, including government rebates, network fees and wholesale market costs. You are protected by the Amber Bill Guarantee Rates available here https://www.amber.com.au/factsheets/factsheets","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"amber-electric-amb1043512mre1eme-electricity","cdr_plan_id":"AMB1043512MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Solar Only + CBA Yello: Variable Prices (estimate only)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.82,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $120 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1616.64,"at_4000_kwh":2034.84,"at_5000_kwh":2453.04,"at_8000_kwh":3707.64},"marginal_rates":{"excess_unit_cost_cents":41.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"CommBank Yello; Smart Meter Installation"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043512mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043512MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Estimated wholesale export price","description":"Feed-in price is a 12 month average estimate, based on a typical household solar (5kW) without battery set up in your network with an annual load of 8000kWh and annual exports of 3900kWh (assumes tariff RTOU). Prices are not fixed. Amber passes through wholesale electricity prices directly at cost and has a guaranteed minimum feed-in price of 0c/kWh over a financial year. See www.amber.com.au/pricing for full details.","type":"single","rate_cents_per_kwh":0}],"terms":"Usage price is a 12 month average estimate, based on a typical household solar (5 kW) without battery set up in your network with an annual load of 8000kWh and annual exports of 3900kWh (assumes tariff RTOU). Includes Ambers monthly subscription. See www.amber.com.au/pricing for full details. Prices are not fixed. Amber passes through wholesale electricity prices directly at cost. For full terms and conditions, visit https://www.amber.com.au/terms","variation":"Usage price is a 12 month average estimate only. Actual prices are not fixed and change every 5 or 30 minutes (depending on meter compatibility). Usage is charged at the same wholesale electricity costs that are charged to us. Prices are determined by a range of factors, including government rebates, network fees and wholesale market costs. You are protected by the Amber Bill Guarantee Rates available here https://www.amber.com.au/factsheets/factsheets","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"amber-electric-amb1043506mre1eme-electricity","cdr_plan_id":"AMB1043506MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Solar Only: Variable Prices (estimate only)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.82,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1616.64,"at_4000_kwh":2034.84,"at_5000_kwh":2453.04,"at_8000_kwh":3707.64},"marginal_rates":{"excess_unit_cost_cents":41.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Smart Meter Installation"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043506mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043506MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Estimated wholesale export price","description":"Feed-in price is a 12 month average estimate, based on a typical household solar (5kW) without battery set up in your network with an annual load of 8000kWh and annual exports of 3900kWh (assumes tariff RTOU). Prices are not fixed. Amber passes through wholesale electricity prices directly at cost and has a guaranteed minimum feed-in price of 0c/kWh over a financial year. See www.amber.com.au/pricing for full details.","type":"single","rate_cents_per_kwh":0}],"terms":"Usage price is a 12 month average estimate, based on a typical household solar (5 kW) without battery set up in your network with an annual load of 8000kWh and annual exports of 3900kWh (assumes tariff RTOU). Includes Ambers monthly subscription. See www.amber.com.au/pricing for full details. Prices are not fixed. Amber passes through wholesale electricity prices directly at cost. For full terms and conditions, visit https://www.amber.com.au/terms","variation":"Usage price is a 12 month average estimate only. Actual prices are not fixed and change every 5 or 30 minutes (depending on meter compatibility). Usage is charged at the same wholesale electricity costs that are charged to us. Prices are determined by a range of factors, including government rebates, network fees and wholesale market costs. You are protected by the Amber Bill Guarantee Rates available here https://www.amber.com.au/factsheets/factsheets","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"amber-electric-amb1043524mre1eme-electricity","cdr_plan_id":"AMB1043524MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Solar + CBA Yello Gold: Variable Prices (estimate only)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.82,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Gold","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $180 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Gold segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1616.64,"at_4000_kwh":2034.84,"at_5000_kwh":2453.04,"at_8000_kwh":3707.64},"marginal_rates":{"excess_unit_cost_cents":41.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"CommBank Yello Gold; Smart Meter Installation"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043524mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043524MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Estimated wholesale export price","description":"Feed-in price is a 12 month average estimate, based on a typical household solar (5kW) without battery set up in your network with an annual load of 8000kWh and annual exports of 3900kWh (assumes tariff RTOU). Prices are not fixed. Amber passes through wholesale electricity prices directly at cost and has a guaranteed minimum feed-in price of 0c/kWh over a financial year. See www.amber.com.au/pricing for full details.","type":"single","rate_cents_per_kwh":0}],"terms":"Usage price is a 12 month average estimate, based on a typical household solar (5 kW) without battery set up in your network with an annual load of 8000kWh and annual exports of 3900kWh (assumes tariff RTOU). Includes Ambers monthly subscription. See www.amber.com.au/pricing for full details. Prices are not fixed. Amber passes through wholesale electricity prices directly at cost. For full terms and conditions, visit https://www.amber.com.au/terms","variation":"Usage price is a 12 month average estimate only. Actual prices are not fixed and change every 5 or 30 minutes (depending on meter compatibility). Usage is charged at the same wholesale electricity costs that are charged to us. Prices are determined by a range of factors, including government rebates, network fees and wholesale market costs. You are protected by the Amber Bill Guarantee Rates available here https://www.amber.com.au/factsheets/factsheets","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"amber-electric-amb1043530mre1eme-electricity","cdr_plan_id":"AMB1043530MRE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Solar + CBA Yello Diamond: Variable Prices (estimate)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.82,"supply_charge_cents_per_day":99.19},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"CommBank Yello Diamond","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Welcome credit of $210 applied over 12 months. New residential customers only who are also customers of CommBank (CBA) in the Yello Diamond segment and link their CBA credit card or bank account as Amber payment method. Customers are ineligible to receive any remaining credit months if they cancel their Amber account, switch their payment method to a non-CBA account, or their CBA card expires. Additional eligibility requirements apply, see Amber website."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1616.64,"at_4000_kwh":2034.84,"at_5000_kwh":2453.04,"at_8000_kwh":3707.64},"marginal_rates":{"excess_unit_cost_cents":41.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"CommBank Yello Diamond; Smart Meter Installation"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1043530mre1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1043530MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Estimated wholesale export price","description":"Feed-in price is a 12 month average estimate, based on a typical household solar (5kW) without battery set up in your network with an annual load of 8000kWh and annual exports of 3900kWh (assumes tariff RTOU). Prices are not fixed. Amber passes through wholesale electricity prices directly at cost and has a guaranteed minimum feed-in price of 0c/kWh over a financial year. See www.amber.com.au/pricing for full details.","type":"single","rate_cents_per_kwh":0}],"terms":"Usage price is a 12 month average estimate, based on a typical household solar (5 kW) without battery set up in your network with an annual load of 8000kWh and annual exports of 3900kWh (assumes tariff RTOU). Includes Ambers monthly subscription. See www.amber.com.au/pricing for full details. Prices are not fixed. Amber passes through wholesale electricity prices directly at cost. For full terms and conditions, visit https://www.amber.com.au/terms","variation":"Usage price is a 12 month average estimate only. Actual prices are not fixed and change every 5 or 30 minutes (depending on meter compatibility). Usage is charged at the same wholesale electricity costs that are charged to us. Prices are determined by a range of factors, including government rebates, network fees and wholesale market costs. You are protected by the Amber Bill Guarantee Rates available here https://www.amber.com.au/factsheets/factsheets","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"An $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.72 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.0072"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"agl-agl737887sbe9eme-electricity","cdr_plan_id":"AGL737887SBE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Standing Offer (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":135.65,"peak_cents_per_kwh":46.76,"off_peak_cents_per_kwh":32.93,"shoulder_cents_per_kwh":40.01,"peak_hours":"Nov-Mar: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Nov-Mar: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Apr-Oct: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Nov-Mar: 7am-4:59pm mon, tue, wed, thu, fri · Apr-Oct: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Demand","description":"Anytime maximum demand charge based on highest half- hour demand during last 12 months c/kVA/day","amount_cents_per_kw":9.01,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1649.97,"at_4000_kwh":2034.92,"at_5000_kwh":2419.87,"at_8000_kwh":3574.72},"marginal_rates":{"excess_unit_cost_cents":46.76,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl737887sbe9eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL737887SBE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Nov-Mar (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.93},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":40.01},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.76},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":32.93},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.76},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]}]},{"season":"Apr-Oct (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.93},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":40.01},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":32.93}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"agl-agl737934mbe10eme-electricity","cdr_plan_id":"AGL737934MBE10@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Basics (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":135.65,"peak_cents_per_kwh":46.76,"off_peak_cents_per_kwh":32.93,"shoulder_cents_per_kwh":40.01,"peak_hours":"Nov-Mar: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Nov-Mar: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Apr-Oct: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Nov-Mar: 7am-4:59pm mon, tue, wed, thu, fri · Apr-Oct: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Demand","description":"Anytime maximum demand charge based on highest half- hour demand during last 12 months c/kVA/day","amount_cents_per_kw":9.01,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1649.97,"at_4000_kwh":2034.92,"at_5000_kwh":2419.87,"at_8000_kwh":3574.72},"marginal_rates":{"excess_unit_cost_cents":46.76,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl737934mbe10eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL737934MBE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Nov-Mar (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.93},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":40.01},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.76},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":32.93},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.76},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]}]},{"season":"Apr-Oct (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.93},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":40.01},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":32.93}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"agl-agl205704sbe30eme-electricity","cdr_plan_id":"AGL205704SBE30@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Standing Offer (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":135.65,"peak_cents_per_kwh":46.76,"off_peak_cents_per_kwh":32.93,"shoulder_cents_per_kwh":40.01,"peak_hours":"Nov-Mar: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Nov-Mar: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Apr-Oct: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Nov-Mar: 7am-4:59pm mon, tue, wed, thu, fri · Apr-Oct: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Demand","description":"Anytime maximum demand charge based on highest half- hour demand during last 12 months c/kVA/day","amount_cents_per_kw":9.01,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1649.97,"at_4000_kwh":2034.92,"at_5000_kwh":2419.87,"at_8000_kwh":3574.72},"marginal_rates":{"excess_unit_cost_cents":46.76,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl205704sbe30eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL205704SBE30@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Nov-Mar (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.93},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":40.01},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.76},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":32.93},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.76},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]}]},{"season":"Apr-Oct (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.93},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":40.01},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":32.93}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"agl-agl205696sbe30eme-electricity","cdr_plan_id":"AGL205696SBE30@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Standing Offer (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":135.65,"peak_cents_per_kwh":46.76,"off_peak_cents_per_kwh":32.93,"shoulder_cents_per_kwh":40.01,"peak_hours":"Nov-Mar: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Nov-Mar: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Apr-Oct: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Nov-Mar: 7am-4:59pm mon, tue, wed, thu, fri · Apr-Oct: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Demand","description":"Anytime maximum demand charge based on highest half- hour demand during last 12 months c/kVA/day","amount_cents_per_kw":9.01,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1649.97,"at_4000_kwh":2034.92,"at_5000_kwh":2419.87,"at_8000_kwh":3574.72},"marginal_rates":{"excess_unit_cost_cents":46.76,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl205696sbe30eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL205696SBE30@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Nov-Mar (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.93},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":40.01},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.76},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":32.93},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.76},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]}]},{"season":"Apr-Oct (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.93},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":40.01},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.93}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":32.93}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.6},{"plan_id":"energy-locals-retail-lcl1042417sre1eme-electricity","cdr_plan_id":"LCL1042417SRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":214.09,"peak_cents_per_kwh":50.45,"off_peak_cents_per_kwh":21.36,"shoulder_cents_per_kwh":27.73,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1722.26,"at_4000_kwh":2035.87,"at_5000_kwh":2349.48,"at_8000_kwh":3290.31},"marginal_rates":{"excess_unit_cost_cents":50.45,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1042417sre1eme-electricity&source=ai","last_verified":"2026-03-20","source_doc":"CDR EnergyPlanDetailV3 LCL1042417SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocalsretail.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocalsretail.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX payments via energylocalsretail.com.au/pay-by-card. Debit card transactions are subject to a 0.46% fee, and credit card payments incur a 0.81% fee. Card processing fees are waived for Direct Debit payments.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":27.73},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":21.36},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":27.73},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.45},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":27.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.5},{"plan_id":"origin-ori729885mbe8eme-electricity","cdr_plan_id":"ORI729885MBE8@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Solar Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":109.36,"peak_cents_per_kwh":54.36,"off_peak_cents_per_kwh":35.16,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1626.76,"at_4000_kwh":2035.96,"at_5000_kwh":2445.16,"at_8000_kwh":3672.76},"marginal_rates":{"excess_unit_cost_cents":54.36,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori729885mbe8eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI729885MBE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 5 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh).","type":"single","rate_cents_per_kwh":5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":35.16},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":54.36},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":35.16}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":35.16},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":35.16},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":35.16}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.5},{"plan_id":"origin-ori729935mbe9eme-electricity","cdr_plan_id":"ORI729935MBE9@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Solar Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":109.36,"peak_cents_per_kwh":54.36,"off_peak_cents_per_kwh":35.16,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1626.76,"at_4000_kwh":2035.96,"at_5000_kwh":2445.16,"at_8000_kwh":3672.76},"marginal_rates":{"excess_unit_cost_cents":54.36,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori729935mbe9eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI729935MBE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 5 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh).","type":"single","rate_cents_per_kwh":5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":35.16},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":54.36},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":35.16}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":35.16},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":35.16},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":35.16}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.5},{"plan_id":"origin-ori1018759mbe1eme-electricity","cdr_plan_id":"ORI1018759MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018759mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018759MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori1018758mbe1eme-electricity","cdr_plan_id":"ORI1018758MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018758mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018758MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori1007210mbe2eme-electricity","cdr_plan_id":"ORI1007210MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007210mbe2eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI1007210MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori953134mbe3eme-electricity","cdr_plan_id":"ORI953134MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953134mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953134MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori953121mbe3eme-electricity","cdr_plan_id":"ORI953121MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953121mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953121MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori953104mbe3eme-electricity","cdr_plan_id":"ORI953104MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953104mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953104MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori953157mbe3eme-electricity","cdr_plan_id":"ORI953157MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953157mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953157MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori953106mbe3eme-electricity","cdr_plan_id":"ORI953106MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953106mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953106MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori953123mbe3eme-electricity","cdr_plan_id":"ORI953123MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953123mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953123MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori953168mbe3eme-electricity","cdr_plan_id":"ORI953168MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953168mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953168MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori953155mbe3eme-electricity","cdr_plan_id":"ORI953155MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953155mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953155MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori1007202mbe2eme-electricity","cdr_plan_id":"ORI1007202MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007202mbe2eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI1007202MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori953170mbe3eme-electricity","cdr_plan_id":"ORI953170MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953170mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953170MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"origin-ori953136mbe3eme-electricity","cdr_plan_id":"ORI953136MBE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Usage Advantage - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":48.14,"off_peak_cents_per_kwh":32.57,"shoulder_cents_per_kwh":41.71,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1647.34,"at_4000_kwh":2038.03,"at_5000_kwh":2428.72,"at_8000_kwh":3600.79},"marginal_rates":{"excess_unit_cost_cents":48.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953136mbe3eme-electricity&source=ai","last_verified":"2025-11-03","source_doc":"CDR EnergyPlanDetailV3 ORI953136MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":41.71},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":48.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.57},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":41.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.57}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11.4},{"plan_id":"diamond-dia933995mre3eme-electricity","cdr_plan_id":"DIA933995MRE3@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":151.13,"peak_cents_per_kwh":48.74,"off_peak_cents_per_kwh":32.54,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1673.62,"at_4000_kwh":2047.62,"at_5000_kwh":2421.62,"at_8000_kwh":3543.62},"marginal_rates":{"excess_unit_cost_cents":48.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia933995mre3eme-electricity&source=ai","last_verified":"2025-10-24","source_doc":"CDR EnergyPlanDetailV3 DIA933995MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. Full terms & conditions and solar feed in tariff eligibility available on our website. Ongoing discounts of 2% to daily supply and consumption charges for each customer / property you refer for period referee stays with us. Discounts are additive. Pay on Time conditions apply. Your friend also receives $35 (incl. GST) sign up credit.","variation":"We may vary the charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.54},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":48.74},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.54}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":32.54}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11},{"plan_id":"diamond-dia786900mre4eme-electricity","cdr_plan_id":"DIA786900MRE4@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":151.13,"peak_cents_per_kwh":48.74,"off_peak_cents_per_kwh":32.54,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1673.62,"at_4000_kwh":2047.62,"at_5000_kwh":2421.62,"at_8000_kwh":3543.62},"marginal_rates":{"excess_unit_cost_cents":48.74,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia786900mre4eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 DIA786900MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. Full terms & conditions and solar feed in tariff eligibility available on our website. Ongoing discounts of 2% to daily supply and consumption charges for each customer / property you refer for period referee stays with us. Discounts are additive. Pay on Time conditions apply. Your friend also receives $35 (incl. GST) sign up credit.","variation":"We may vary the charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.54},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":48.74},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.54}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":32.54}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":11},{"plan_id":"ovo-energy-ovo704385mre20eme-electricity","cdr_plan_id":"OVO704385MRE20@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.95,"supply_charge_cents_per_day":113.4},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1642.41,"at_4000_kwh":2051.91,"at_5000_kwh":2461.41,"at_8000_kwh":3689.91},"marginal_rates":{"excess_unit_cost_cents":40.95,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704385mre20eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704385MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.8},{"plan_id":"ovo-energy-ovo704386mre20eme-electricity","cdr_plan_id":"OVO704386MRE20@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.95,"supply_charge_cents_per_day":113.4},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1642.41,"at_4000_kwh":2051.91,"at_5000_kwh":2461.41,"at_8000_kwh":3689.91},"marginal_rates":{"excess_unit_cost_cents":40.95,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704386mre20eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704386MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.8},{"plan_id":"kogan-kog919206mre2eme-electricity","cdr_plan_id":"KOG919206MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39,"supply_charge_cents_per_day":135},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1662.75,"at_4000_kwh":2052.75,"at_5000_kwh":2442.75,"at_8000_kwh":3612.75},"marginal_rates":{"excess_unit_cost_cents":39,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog919206mre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 KOG919206MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.8},{"plan_id":"kogan-kog919196mre2eme-electricity","cdr_plan_id":"KOG919196MRE2@EME","retailer":"Kogan Energy","retailer_slug":"kogan","retailer_logo_uri":"https://s45145.pcdn.co/wp-content/uploads/2023/06/kogan-energy.png","plan_name":"Kogan Energy Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39,"supply_charge_cents_per_day":135},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1662.75,"at_4000_kwh":2052.75,"at_5000_kwh":2442.75,"at_8000_kwh":3612.75},"marginal_rates":{"excess_unit_cost_cents":39,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=kogan-kog919196mre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 KOG919196MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"You must provide a preferred credit card or bank account, and you must ensure that the preferred payment method is kept up to date and valid. You agree to us automatically debiting your preferred payment method for any outstanding amounts due. Kogan Energy is provided by Powershop Australia Pty Ltd. For further information in relation to this offer see our terms and conditions at: koganenergy.com.au/terms-conditions","variation":"We may vary your prices at any time. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Kogan Energy offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: https://www.koganenergy.com.au/fees","fees":[{"type":"OTHER","amount":"0.00","description":"Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.8},{"plan_id":"powershop-psh925641sre2eme-electricity","cdr_plan_id":"PSH925641SRE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39,"supply_charge_cents_per_day":135},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1662.75,"at_4000_kwh":2052.75,"at_5000_kwh":2442.75,"at_8000_kwh":3612.75},"marginal_rates":{"excess_unit_cost_cents":39,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925641sre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925641SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"This offer is available to customers within the SA Power Networks distribution zone with the applicable network tariff and meter configuration, and where Powershop is the retailer responsible for electricity supplied at the premises. We require a credit card or bank details. For further information in relation to Powershop and this offer - see our full terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We�ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.8},{"plan_id":"powershop-psh925646sre2eme-electricity","cdr_plan_id":"PSH925646SRE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39,"supply_charge_cents_per_day":135},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1662.75,"at_4000_kwh":2052.75,"at_5000_kwh":2442.75,"at_8000_kwh":3612.75},"marginal_rates":{"excess_unit_cost_cents":39,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925646sre2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925646SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"This offer is available to customers within the SA Power Networks distribution zone with the applicable network tariff and meter configuration, and where Powershop is the retailer responsible for electricity supplied at the premises. We require a credit card or bank details. For further information in relation to Powershop and this offer - see our full terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We?ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.8},{"plan_id":"origin-ori1057334mbe2eme-electricity","cdr_plan_id":"ORI1057334MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable (New and Moving Customers)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame; New and Moving Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1057334mbe2eme-electricity&source=ai","last_verified":"2026-05-19","source_doc":"CDR EnergyPlanDetailV3 ORI1057334MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$300 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori1057329mbe2eme-electricity","cdr_plan_id":"ORI1057329MBE2@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable (New and Moving Customers)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame; New and Moving Customers Only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1057329mbe2eme-electricity&source=ai","last_verified":"2026-05-19","source_doc":"CDR EnergyPlanDetailV3 ORI1057329MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$300 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori953011mbe6eme-electricity","cdr_plan_id":"ORI953011MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953011mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953011MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori953009mbe6eme-electricity","cdr_plan_id":"ORI953009MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Compare & Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953009mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953009MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori953051mbe6eme-electricity","cdr_plan_id":"ORI953051MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953051mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953051MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori953029mbe6eme-electricity","cdr_plan_id":"ORI953029MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953029mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953029MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori953080mbe6eme-electricity","cdr_plan_id":"ORI953080MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953080mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953080MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori953078mbe6eme-electricity","cdr_plan_id":"ORI953078MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Zembl","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953078mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953078MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori953049mbe6eme-electricity","cdr_plan_id":"ORI953049MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Mindlabz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953049mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953049MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori1020147mbe4eme-electricity","cdr_plan_id":"ORI1020147MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Comparable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020147mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1020147MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori953027mbe6eme-electricity","cdr_plan_id":"ORI953027MBE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Electricity Wizard","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori953027mbe6eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI953027MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori1020161mbe4eme-electricity","cdr_plan_id":"ORI1020161MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Comparable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1020161mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1020161MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori988100mbe5eme-electricity","cdr_plan_id":"ORI988100MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Go Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988100mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988100MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori988103mbe5eme-electricity","cdr_plan_id":"ORI988103MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Go Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988103mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988103MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori988108mbe5eme-electricity","cdr_plan_id":"ORI988108MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - One Click Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988108mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988108MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori988119mbe5eme-electricity","cdr_plan_id":"ORI988119MBE5@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - One Click Switch","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori988119mbe5eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI988119MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori1007204mbe4eme-electricity","cdr_plan_id":"ORI1007204MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007204mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1007204MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori1007200mbe4eme-electricity","cdr_plan_id":"ORI1007200MBE4@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - Chameleon","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Credit Time Frame"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1007200mbe4eme-electricity&source=ai","last_verified":"2026-04-28","source_doc":"CDR EnergyPlanDetailV3 ORI1007200MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori1018510mbe1eme-electricity","cdr_plan_id":"ORI1018510MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018510mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018510MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori1018523mbe1eme-electricity","cdr_plan_id":"ORI1018523MBE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable - CIMET","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018523mbe1eme-electricity&source=ai","last_verified":"2026-04-21","source_doc":"CDR EnergyPlanDetailV3 ORI1018523MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Account Credit","description":"$200 (incl. GST) credit will be applied to your account after sign-up. One credit offer per electricity account per 12 month period. You will see it on MyAccount and it will be applied to your electricity bill. Not redeemable for cash."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori430632mbe17eme-electricity","cdr_plan_id":"ORI430632MBE17@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430632mbe17eme-electricity&source=ai","last_verified":"2025-10-23","source_doc":"CDR EnergyPlanDetailV3 ORI430632MBE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"origin-ori430630mbe17eme-electricity","cdr_plan_id":"ORI430630MBE17@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.58,"peak_cents_per_kwh":50.43,"off_peak_cents_per_kwh":34.12,"shoulder_cents_per_kwh":43.7,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1646.09,"at_4000_kwh":2055.38,"at_5000_kwh":2464.67,"at_8000_kwh":3692.54},"marginal_rates":{"excess_unit_cost_cents":50.43,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430630mbe17eme-electricity&source=ai","last_verified":"2025-10-23","source_doc":"CDR EnergyPlanDetailV3 ORI430630MBE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.43},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":34.12},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":34.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.7},{"plan_id":"dodo-dod14016sre10eme-electricity","cdr_plan_id":"DOD14016SRE10@EME","retailer":"Dodo Power & Gas","retailer_slug":"dodo","retailer_logo_uri":"https://s0.2mdn.net/creatives/assets/4983616/Dodo_Logo_Aug23_V1.svg","plan_name":"Residential Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.04,"supply_charge_cents_per_day":170.75},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1704.44,"at_4000_kwh":2064.84,"at_5000_kwh":2425.24,"at_8000_kwh":3506.44},"marginal_rates":{"excess_unit_cost_cents":36.04,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=dodo-dod14016sre10eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 DOD14016SRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Solar FIT Scheme (DFIT1) & (DFIT1A)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer Feed-in Tariff - This plan is available to eligible small solar customers with a maximum 10kW panel size and an inverter system no greater than 10kW as part of an ongoing contract.","type":"single","rate_cents_per_kwh":1}],"terms":"See our Standing terms and conditions at www.dodo.com/energy/terms-prices-and-regulatory-information. If you are eligible, you can apply to the SA Government to receive applicable energy concessions.","variation":"We may vary these prices no more than once every 6 months, and provide you notice of any changes at least 5 business days before the change is effective. We will publish variations on our website and in a newspaper at least 10 business days prior.","onExpiryDescription":"Standing contracts do not expire until you notify us in accordance with our Standing Contract Terms and Conditions.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For further details on the information and fees presented, or the terms and conditions of the contract, please visit www.dodo.com/energy/terms-prices-and-regulatory-information or contact us on 13 dodo (13 36 36).","fees":[{"type":"DD_DISHONOUR","amount":"9.5","description":"Dishonoured Payment fee of $9.50 (inc GST) may apply to payments we attempt that are subsequently declined.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move into a property.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move out of a property.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply when moving into your property and connecting electricity to your property.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.3},{"plan_id":"sumo-sum1034968sre1eme-electricity","cdr_plan_id":"SUM1034968SRE1@EME","retailer":"Sumo","retailer_slug":"sumo","retailer_logo_uri":"https://sumo-public-share.s3.ap-southeast-2.amazonaws.com/SumoIT/URI/Sumo_Logo.png","plan_name":"Sumo Standing Offer Single rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.8,"supply_charge_cents_per_day":108.1},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1648.56,"at_4000_kwh":2066.57,"at_5000_kwh":2484.57,"at_8000_kwh":3738.57},"marginal_rates":{"excess_unit_cost_cents":41.8,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=sumo-sum1034968sre1eme-electricity&source=ai","last_verified":"2026-02-13","source_doc":"CDR EnergyPlanDetailV3 SUM1034968SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed in Tariff","description":"If you have installed solar PV at the Premises, you may be eligible to be paid for excess electricity you feed back into the grid. Maximum system size of 10KW.","type":"single","rate_cents_per_kwh":0}],"terms":"Offer not available in all areas or properties. You must be a residential customer with an applicable network tariff for a premises where Sumo supplies Electricity. Please refer to our website https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions for full terms and conditions.","variation":"Prices, fees and charges are subject to change. We will give you at least 5 business days prior notice.","onExpiryDescription":"No contract term.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 5","Type 4"],"additionalFeeInformation":"We pass through any fee from your distributor, including fees for disconnection or reconnection, or special meter read (move-out). Distributor fees at https://www.sumo.com.au/help-and-support/rates-and-other-charges/other-fees-and-charges. Fee applied to your next bill.","fees":[{"type":"OTHER","amount":"2.75","description":"Dishonoured Payment Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.007","description":"This fee is only applicable for payments made by credit card.","term":"PERCENT_OF_BILL","rate":"0.007"},{"type":"CONNECTION","amount":"63.71","description":"A standard connection fee of $63.71 (ex GST) applies when you requested a connection of your electricity supply during standard business hours (Monday to Friday, excluding public holidays) when the site is already connected. All fees are subject to change and may vary depending on your distribution network or specific property requirements. Additional charges may apply for urgent, after-hours, or complex connections.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.1","description":"Bills can be issued by email for no cost, or alternatively by post at a cost of $3.10 (inc GST) per bill.","term":"FIXED"},{"type":"OTHER","amount":"2.00","description":"Over the counter fee at Australia Post","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.2},{"plan_id":"sumo-sum1034967sre1eme-electricity","cdr_plan_id":"SUM1034967SRE1@EME","retailer":"Sumo","retailer_slug":"sumo","retailer_logo_uri":"https://sumo-public-share.s3.ap-southeast-2.amazonaws.com/SumoIT/URI/Sumo_Logo.png","plan_name":"Sumo Standing Offer Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.8,"supply_charge_cents_per_day":108.1},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1648.56,"at_4000_kwh":2066.57,"at_5000_kwh":2484.57,"at_8000_kwh":3738.57},"marginal_rates":{"excess_unit_cost_cents":41.8,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=sumo-sum1034967sre1eme-electricity&source=ai","last_verified":"2026-02-13","source_doc":"CDR EnergyPlanDetailV3 SUM1034967SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed in Tariff","description":"If you have installed solar PV at the Premises, you may be eligible to be paid for excess electricity you feed back into the grid. Maximum system size of 10KW.","type":"single","rate_cents_per_kwh":0}],"terms":"Offer not available in all areas or properties. You must be a residential customer with an applicable network tariff for a premises where Sumo supplies Electricity. Please refer to our website https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions for full terms and conditions.","variation":"Prices, fees and charges are subject to change. We will give you at least 5 business days prior notice.","onExpiryDescription":"No contract term.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 5","Type 4"],"additionalFeeInformation":"We pass through any fee from your distributor, including fees for disconnection or reconnection, or special meter read (move-out). Distributor fees at https://www.sumo.com.au/help-and-support/rates-and-other-charges/other-fees-and-charges. Fee applied to your next bill.","fees":[{"type":"OTHER","amount":"2.75","description":"Dishonoured Payment Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.007","description":"This fee is only applicable for payments made by credit card.","term":"PERCENT_OF_BILL","rate":"0.007"},{"type":"CONNECTION","amount":"63.71","description":"A standard connection fee of $63.71 (ex GST) applies when you requested a connection of your electricity supply during standard business hours (Monday to Friday, excluding public holidays) when the site is already connected. All fees are subject to change and may vary depending on your distribution network or specific property requirements. Additional charges may apply for urgent, after-hours, or complex connections.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.1","description":"Bills can be issued by email for no cost, or alternatively by post at a cost of $3.10 (inc GST) per bill.","term":"FIXED"},{"type":"OTHER","amount":"2.00","description":"Over the counter fee at Australia Post","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.2},{"plan_id":"red-energy-red552477mbe14eme-electricity","cdr_plan_id":"RED552477MBE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Plus","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":46.85,"off_peak_cents_per_kwh":36.82,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1669.37,"at_4000_kwh":2067.66,"at_5000_kwh":2465.95,"at_8000_kwh":3660.82},"marginal_rates":{"excess_unit_cost_cents":46.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552477mbe14eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552477MBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 15,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":46.85},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.82},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.1},{"plan_id":"red-energy-red552479mbe13eme-electricity","cdr_plan_id":"RED552479MBE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Plus","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":46.85,"off_peak_cents_per_kwh":36.82,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1669.37,"at_4000_kwh":2067.66,"at_5000_kwh":2465.95,"at_8000_kwh":3660.82},"marginal_rates":{"excess_unit_cost_cents":46.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552479mbe13eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552479MBE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 15,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":46.85},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.82},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.1},{"plan_id":"red-energy-red552217mbe12eme-electricity","cdr_plan_id":"RED552217MBE12@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Business Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":46.85,"off_peak_cents_per_kwh":36.82,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1669.37,"at_4000_kwh":2067.66,"at_5000_kwh":2465.95,"at_8000_kwh":3660.82},"marginal_rates":{"excess_unit_cost_cents":46.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552217mbe12eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552217MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":46.85},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.82},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.1},{"plan_id":"red-energy-red552203mbe13eme-electricity","cdr_plan_id":"RED552203MBE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Business Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":46.85,"off_peak_cents_per_kwh":36.82,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1669.37,"at_4000_kwh":2067.66,"at_5000_kwh":2465.95,"at_8000_kwh":3660.82},"marginal_rates":{"excess_unit_cost_cents":46.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552203mbe13eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552203MBE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":46.85},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.82},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.1},{"plan_id":"red-energy-red552597mbe13eme-electricity","cdr_plan_id":"RED552597MBE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":46.85,"off_peak_cents_per_kwh":36.82,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1669.37,"at_4000_kwh":2067.66,"at_5000_kwh":2465.95,"at_8000_kwh":3660.82},"marginal_rates":{"excess_unit_cost_cents":46.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552597mbe13eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552597MBE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":46.85},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.82},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.1},{"plan_id":"red-energy-red552594mbe14eme-electricity","cdr_plan_id":"RED552594MBE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":46.85,"off_peak_cents_per_kwh":36.82,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1669.37,"at_4000_kwh":2067.66,"at_5000_kwh":2465.95,"at_8000_kwh":3660.82},"marginal_rates":{"excess_unit_cost_cents":46.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552594mbe14eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552594MBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":46.85},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.82},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.82},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.82}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.1},{"plan_id":"momentum-mom921286mbe3eme-electricity","cdr_plan_id":"MOM921286MBE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Bill Boss Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":37.7,"supply_charge_cents_per_day":153.7},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1692.01,"at_4000_kwh":2069.01,"at_5000_kwh":2446.01,"at_8000_kwh":3577.01},"marginal_rates":{"excess_unit_cost_cents":37.7,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921286mbe3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921286MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, sign up via our third party sales channels or call Momentum directly, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10.1},{"plan_id":"globird-glo1054010mre1eme-electricity","cdr_plan_id":"GLO1054010MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"GLOSAVE Residential (Flexible RESELE)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":137,"peak_cents_per_kwh":80.3,"off_peak_cents_per_kwh":16.5,"shoulder_cents_per_kwh":34.6,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1677.85,"at_4000_kwh":2070.45,"at_5000_kwh":2463.05,"at_8000_kwh":3640.85},"marginal_rates":{"excess_unit_cost_cents":80.3,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054010mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054010MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers with an applicable network tariff. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":34.6},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":16.5},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":34.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":80.3},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":34.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10},{"plan_id":"globird-glo1054009mre1eme-electricity","cdr_plan_id":"GLO1054009MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"GLOSAVE Residential (Flexible RESELE CTL)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":137,"peak_cents_per_kwh":80.3,"off_peak_cents_per_kwh":16.5,"shoulder_cents_per_kwh":34.6,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1677.85,"at_4000_kwh":2070.45,"at_5000_kwh":2463.05,"at_8000_kwh":3640.85},"marginal_rates":{"excess_unit_cost_cents":80.3,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054009mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054009MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers with an applicable network tariff. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":34.6},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":16.5},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":34.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":80.3},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":34.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10},{"plan_id":"alinta-ali1018941mre1eme-electricity","cdr_plan_id":"ALI1018941MRE1@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Edge - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.53,"supply_charge_cents_per_day":112.17,"block_rates":[{"volume_kwh":3.2877,"rate_cents_per_kwh":41.53},{"volume_kwh":7.6712,"rate_cents_per_kwh":41.53},{"volume_kwh":16.44,"rate_cents_per_kwh":41.53},{"volume_kwh":27.3973,"rate_cents_per_kwh":41.53},{"volume_kwh":null,"rate_cents_per_kwh":41.53}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1655.32,"at_4000_kwh":2070.62,"at_5000_kwh":2485.92,"at_8000_kwh":3731.82},"marginal_rates":{"excess_unit_cost_cents":41.53,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1018941mre1eme-electricity&source=ai","last_verified":"2025-11-13","source_doc":"CDR EnergyPlanDetailV3 ALI1018941MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10},{"plan_id":"alinta-ali1018939mre1eme-electricity","cdr_plan_id":"ALI1018939MRE1@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Edge - Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.53,"supply_charge_cents_per_day":112.17,"block_rates":[{"volume_kwh":3.2877,"rate_cents_per_kwh":41.53},{"volume_kwh":7.6712,"rate_cents_per_kwh":41.53},{"volume_kwh":16.44,"rate_cents_per_kwh":41.53},{"volume_kwh":27.3973,"rate_cents_per_kwh":41.53},{"volume_kwh":null,"rate_cents_per_kwh":41.53}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1655.32,"at_4000_kwh":2070.62,"at_5000_kwh":2485.92,"at_8000_kwh":3731.82},"marginal_rates":{"excess_unit_cost_cents":41.53,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1018939mre1eme-electricity&source=ai","last_verified":"2025-11-13","source_doc":"CDR EnergyPlanDetailV3 ALI1018939MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10},{"plan_id":"nectr-ntr1013074mre1eme-electricity","cdr_plan_id":"NTR1013074MRE1@EME","retailer":"Nectr","retailer_slug":"nectr","retailer_logo_uri":"https://nectr.com.au/wp-content/uploads/2023/04/header-logo.svg","plan_name":"Nectr Home Buzz + CL 2","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.65,"supply_charge_cents_per_day":132.82},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Refer a Friend Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$50 credit on your 2nd bill, if you sign up using a Refer a Friend link from an existing Nectr customer. Applies to new customers only. T&Cs apply, refer to nectr.com.au/terms-and-conditions/nectr-refer-a-friend-program/"}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1674.29,"at_4000_kwh":2070.79,"at_5000_kwh":2467.29,"at_8000_kwh":3656.79},"marginal_rates":{"excess_unit_cost_cents":39.65,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=nectr-ntr1013074mre1eme-electricity&source=ai","last_verified":"2025-10-21","source_doc":"CDR EnergyPlanDetailV3 NTR1013074MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"Retailer feed-in tariffs","type":"single","rate_cents_per_kwh":0}],"terms":"This offer is available to customers with an applicable network tariff. If you are not sure which network tariff you have, please contact us or sign up online to check this offer is available to you. Billing will be either monthly or quarterly, depending on your meter type. For more details on the terms and conditions, visit nectr.com.au/terms-and-conditions/#contracts, contact Nectr on hello@nectr.com.au or call 1300 111 211.","variation":"We may vary your rates and charges by providing you notice of any changes at least 5 business days before they become effective.","onExpiryDescription":"Your contract is ongoing","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the Nectr fee schedules at https://nectr.com.au/plans-and-fees/sa-power/","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"This fee may apply when disconnecting power to your property. Additional charges may be incurred for after hours requests, site-visits and non-payment cases.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"This fee may apply when reconnecting power to your property. Additional charges may be incurred for after hours requests or site-visits.","term":"FIXED"},{"type":"OTHER","amount":"21.23","description":"This fee may apply when a customer requests the network undertake a special meter read.","term":"FIXED"},{"type":"CONNECTION","amount":"21.23","description":"This fee may apply when you move into a property. A reconnection fee may apply if your move-in requires reconnection.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.013","description":"This fee applies to payments made by debit and credit cards, excluding direct debit.","term":"PERCENT_OF_BILL","rate":"0.013"},{"type":"PAYMENT_PROCESSING","amount":"0.88","description":"BPay payments incur a $0.88(inc GST) fee per transaction.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10},{"plan_id":"nectr-ntr1013073mre1eme-electricity","cdr_plan_id":"NTR1013073MRE1@EME","retailer":"Nectr","retailer_slug":"nectr","retailer_logo_uri":"https://nectr.com.au/wp-content/uploads/2023/04/header-logo.svg","plan_name":"Nectr Home Buzz + CL 1","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.65,"supply_charge_cents_per_day":132.82},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Refer a Friend Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$50 credit on your 2nd bill, if you sign up using a Refer a Friend link from an existing Nectr customer. Applies to new customers only. T&Cs apply, refer to nectr.com.au/terms-and-conditions/nectr-refer-a-friend-program/"}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1674.29,"at_4000_kwh":2070.79,"at_5000_kwh":2467.29,"at_8000_kwh":3656.79},"marginal_rates":{"excess_unit_cost_cents":39.65,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=nectr-ntr1013073mre1eme-electricity&source=ai","last_verified":"2025-10-21","source_doc":"CDR EnergyPlanDetailV3 NTR1013073MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"Retailer feed-in tariffs","type":"single","rate_cents_per_kwh":0}],"terms":"This offer is available to customers with an applicable network tariff. If you are not sure which network tariff you have, please contact us or sign up online to check this offer is available to you. Billing will be either monthly or quarterly, depending on your meter type. For more details on the terms and conditions, visit nectr.com.au/terms-and-conditions/#contracts, contact Nectr on hello@nectr.com.au or call 1300 111 211.","variation":"We may vary your rates and charges by providing you notice of any changes at least 5 business days before they become effective.","onExpiryDescription":"Your contract is ongoing","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the Nectr fee schedules at https://nectr.com.au/plans-and-fees/sa-power/","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"This fee may apply when disconnecting power to your property. Additional charges may be incurred for after hours requests, site-visits and non-payment cases.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"This fee may apply when reconnecting power to your property. Additional charges may be incurred for after hours requests or site-visits.","term":"FIXED"},{"type":"OTHER","amount":"21.23","description":"This fee may apply when a customer requests the network undertake a special meter read.","term":"FIXED"},{"type":"CONNECTION","amount":"21.23","description":"This fee may apply when you move into a property. A reconnection fee may apply if your move-in requires reconnection.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.013","description":"This fee applies to payments made by debit and credit cards, excluding direct debit.","term":"PERCENT_OF_BILL","rate":"0.013"},{"type":"PAYMENT_PROCESSING","amount":"0.88","description":"BPay payments incur a $0.88(inc GST) fee per transaction.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10},{"plan_id":"nectr-ntr1013072mre1eme-electricity","cdr_plan_id":"NTR1013072MRE1@EME","retailer":"Nectr","retailer_slug":"nectr","retailer_logo_uri":"https://nectr.com.au/wp-content/uploads/2023/04/header-logo.svg","plan_name":"Nectr Home Buzz","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.65,"supply_charge_cents_per_day":132.82},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Refer a Friend Credit","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$50 credit on your 2nd bill, if you sign up using a Refer a Friend link from an existing Nectr customer. Applies to new customers only. T&Cs apply, refer to nectr.com.au/terms-and-conditions/nectr-refer-a-friend-program/"}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1674.29,"at_4000_kwh":2070.79,"at_5000_kwh":2467.29,"at_8000_kwh":3656.79},"marginal_rates":{"excess_unit_cost_cents":39.65,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=nectr-ntr1013072mre1eme-electricity&source=ai","last_verified":"2025-10-21","source_doc":"CDR EnergyPlanDetailV3 NTR1013072MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"Retailer feed-in tariffs","type":"single","rate_cents_per_kwh":0}],"terms":"This offer is available to customers with an applicable network tariff. If you are not sure which network tariff you have, please contact us or sign up online to check this offer is available to you. Billing will be either monthly or quarterly, depending on your meter type. For more details on the terms and conditions, visit nectr.com.au/terms-and-conditions/#contracts, contact Nectr on hello@nectr.com.au or call 1300 111 211.","variation":"We may vary your rates and charges by providing you notice of any changes at least 5 business days before they become effective.","onExpiryDescription":"Your contract is ongoing","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the Nectr fee schedules at https://nectr.com.au/plans-and-fees/sa-power/","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"This fee may apply when disconnecting power to your property. Additional charges may be incurred for after hours requests, site-visits and non-payment cases.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"This fee may apply when reconnecting power to your property. Additional charges may be incurred for after hours requests or site-visits.","term":"FIXED"},{"type":"OTHER","amount":"21.23","description":"This fee may apply when a customer requests the network undertake a special meter read.","term":"FIXED"},{"type":"CONNECTION","amount":"21.23","description":"This fee may apply when you move into a property. A reconnection fee may apply if your move-in requires reconnection.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.013","description":"This fee applies to payments made by debit and credit cards, excluding direct debit.","term":"PERCENT_OF_BILL","rate":"0.013"},{"type":"PAYMENT_PROCESSING","amount":"0.88","description":"BPay payments incur a $0.88(inc GST) fee per transaction.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":10},{"plan_id":"momentum-mom916011sre1eme-electricity","cdr_plan_id":"MOM916011SRE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":37.15,"supply_charge_cents_per_day":160.72},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1701.13,"at_4000_kwh":2072.63,"at_5000_kwh":2444.13,"at_8000_kwh":3558.63},"marginal_rates":{"excess_unit_cost_cents":37.15,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916011sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916011SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.9},{"plan_id":"energy-locals-retail-lcl987118sre1eme-electricity","cdr_plan_id":"LCL987118SRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":224.09,"peak_cents_per_kwh":50.45,"off_peak_cents_per_kwh":21.36,"shoulder_cents_per_kwh":28.18,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1761.46,"at_4000_kwh":2075.97,"at_5000_kwh":2390.48,"at_8000_kwh":3334.01},"marginal_rates":{"excess_unit_cost_cents":50.45,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl987118sre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL987118SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":28.18},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":21.36},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":28.18},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":50.45},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":28.18}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.8},{"plan_id":"powershop-psh1012858mre4eme-electricity","cdr_plan_id":"PSH1012858MRE4@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Switch Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":139.11,"peak_cents_per_kwh":55.53,"off_peak_cents_per_kwh":31.77,"shoulder_cents_per_kwh":33.44,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Conditional Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$200 sign up credit is available to new and moving customers only, and is applied to your bill 180 days after your Powershop online account has become active. We will send you an email letting you know when you're officially a customer."}],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1684.71,"at_4000_kwh":2077.03,"at_5000_kwh":2469.35,"at_8000_kwh":3646.31},"marginal_rates":{"excess_unit_cost_cents":55.53,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are eligible"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1012858mre4eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 PSH1012858MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"We do not issue paper bills and require a credit card or bank details��. For more information in relation to Powershop and this offer, see full terms and conditions at: www.powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":31.77},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":33.44},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":31.77},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55.53},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":31.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.7},{"plan_id":"powershop-psh1012872mre4eme-electricity","cdr_plan_id":"PSH1012872MRE4@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Switch Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":139.11,"peak_cents_per_kwh":55.53,"off_peak_cents_per_kwh":31.77,"shoulder_cents_per_kwh":33.44,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Conditional Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$200 sign up credit is available to new and moving customers only, and is applied to your bill 180 days after your Powershop online account has become active. We will send you an email letting you know when you're officially a customer."}],"signup_credits":[],"solar_fit_cents_per_kwh":0.5,"annual_cost_estimates":{"at_3000_kwh":1684.71,"at_4000_kwh":2077.03,"at_5000_kwh":2469.35,"at_8000_kwh":3646.31},"marginal_rates":{"excess_unit_cost_cents":55.53,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"You are eligible"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh1012872mre4eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 PSH1012872MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Voluntary FIT","description":"Retailer Feed-in Tariff","type":"single","rate_cents_per_kwh":0.5},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Feed-in Scheme","description":"Government feed-in tariff","type":"single","rate_cents_per_kwh":49}],"terms":"We do not issue paper bills and require a credit card or bank details��. For more information in relation to Powershop and this offer, see full terms and conditions at: www.powershop.com.au/terms-and-conditions","variation":"We may vary your prices at any time in accordance with our regulatory requirements. If we vary your prices we'll give you advance notice, usually by email.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":10,"rateCents":31.77},{"type":"SHOULDER","startHour":10,"endHour":16,"rateCents":33.44},{"type":"OFF_PEAK","startHour":16,"endHour":17,"rateCents":31.77},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55.53},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":31.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.7},{"plan_id":"ovo-energy-ovo934310sre1eme-electricity","cdr_plan_id":"OVO934310SRE1@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"Basic Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.3,"supply_charge_cents_per_day":117},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1666.05,"at_4000_kwh":2079.05,"at_5000_kwh":2492.05,"at_8000_kwh":3731.05},"marginal_rates":{"excess_unit_cost_cents":41.3,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo934310sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 OVO934310SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.6},{"plan_id":"ovo-energy-ovo934277sre1eme-electricity","cdr_plan_id":"OVO934277SRE1@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"Basic Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.3,"supply_charge_cents_per_day":117},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1666.05,"at_4000_kwh":2079.05,"at_5000_kwh":2492.05,"at_8000_kwh":3731.05},"marginal_rates":{"excess_unit_cost_cents":41.3,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo934277sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 OVO934277SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.6},{"plan_id":"globird-glo1054002mre1eme-electricity","cdr_plan_id":"GLO1054002MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"BOOST Residential (Flat Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.4,"supply_charge_cents_per_day":116,"block_rates":[{"volume_kwh":25,"rate_cents_per_kwh":41.4},{"volume_kwh":null,"rate_cents_per_kwh":43}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1665.4,"at_4000_kwh":2079.4,"at_5000_kwh":2493.4,"at_8000_kwh":3735.4},"marginal_rates":{"excess_unit_cost_cents":41.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054002mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054002MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers with an applicable network tariff and an electricity basic meter. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456. Note, step 1 is calculated by multiplying the daily allowance by the number of days in the billing period. For example, a daily allowance of 25kWh/day and a 30-day billing period has a step 1 of 750kWh, or a 31-day 775kWh.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.6},{"plan_id":"globird-glo1054001mre1eme-electricity","cdr_plan_id":"GLO1054001MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"BOOST Residential (Flat Rate CTL Load)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.4,"supply_charge_cents_per_day":116,"block_rates":[{"volume_kwh":25,"rate_cents_per_kwh":41.4},{"volume_kwh":null,"rate_cents_per_kwh":43}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1665.4,"at_4000_kwh":2079.4,"at_5000_kwh":2493.4,"at_8000_kwh":3735.4},"marginal_rates":{"excess_unit_cost_cents":41.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054001mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054001MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers with an applicable network tariff and an electricity basic meter. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456. Note, step 1 is calculated by multiplying the daily allowance by the number of days in the billing period. For example, a daily allowance of 25kWh/day and a 30-day billing period has a step 1 of 750kWh, or a 31-day 775kWh.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.6},{"plan_id":"momentum-mom921320mre3eme-electricity","cdr_plan_id":"MOM921320MRE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Bill Boss Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":165.6,"peak_cents_per_kwh":55.4,"off_peak_cents_per_kwh":27.2,"shoulder_cents_per_kwh":33.7,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1713.24,"at_4000_kwh":2082.84,"at_5000_kwh":2452.44,"at_8000_kwh":3561.24},"marginal_rates":{"excess_unit_cost_cents":55.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921320mre3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921320MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, sign up via our third party sales channels or call Momentum directly, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":33.7},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":27.2},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":33.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55.4},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":33.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.5},{"plan_id":"momentum-mom921219mre2eme-electricity","cdr_plan_id":"MOM921219MRE2@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Suit Yourself Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":165.6,"peak_cents_per_kwh":55.4,"off_peak_cents_per_kwh":27.2,"shoulder_cents_per_kwh":33.7,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1713.24,"at_4000_kwh":2082.84,"at_5000_kwh":2452.44,"at_8000_kwh":3561.24},"marginal_rates":{"excess_unit_cost_cents":55.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921219mre2eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921219MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, have necessary metering configuration. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"10% GreenPower included","description":"GreenPower comes with this plan. That means you offset 10% of your electricity usage with renewable energy."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":33.7},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":27.2},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":33.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55.4},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":33.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.5},{"plan_id":"energy-locals-retail-lcl987123sre1eme-electricity","cdr_plan_id":"LCL987123SRE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":33.18,"supply_charge_cents_per_day":207.27},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1751.94,"at_4000_kwh":2083.74,"at_5000_kwh":2415.54,"at_8000_kwh":3410.94},"marginal_rates":{"excess_unit_cost_cents":33.18,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl987123sre1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL987123SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.4},{"plan_id":"energy-locals-urban-elu1021362sre2eme-electricity","cdr_plan_id":"ELU1021362SRE2@EME","retailer":"Energy Locals Urban","retailer_slug":"energy-locals-urban","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/627094e73c210df02fadab1ea9ebac5e.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":33.18,"supply_charge_cents_per_day":207.27},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1751.94,"at_4000_kwh":2083.74,"at_5000_kwh":2415.54,"at_8000_kwh":3410.94},"marginal_rates":{"excess_unit_cost_cents":33.18,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-urban-elu1021362sre2eme-electricity&source=ai","last_verified":"2025-11-24","source_doc":"CDR EnergyPlanDetailV3 ELU1021362SRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://energylocals.com.au/urban-terms/, or call Energy Locals Urban on 1300 001 255.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"Energy Locals Urban offers no lock in contracts or exit fees.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fee-schedule/ or call our Customer Service Team on 1300 001 255.","fees":[{"type":"DD_DISHONOUR","amount":"9.9","description":"A $9.90 Ezi-Debit Dishonour Fee, per failed transaction. This is charged by Ezi-debit, not Energy Locals Urban.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0143","description":"A fee of 1.43% applies to payments made by Visa and Mastercard","term":"PERCENT_OF_BILL","rate":"0.0143"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16.00 Late payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0199","description":"A fee of 1.99% of the transaction value plus $0.30 for Amex","term":"PERCENT_OF_BILL","rate":"0.0199"},{"type":"CONNECTION","amount":"30.00","description":"Standard Next Day Connection Fee.  Other connection fees may apply. Contact our Customer Service Team to find out more 1300 001 255. Charges incurred by your distributor may vary.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.4},{"plan_id":"momentum-mom916075sre1eme-electricity","cdr_plan_id":"MOM916075SRE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":165.65,"peak_cents_per_kwh":55.42,"off_peak_cents_per_kwh":27.24,"shoulder_cents_per_kwh":33.69,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1714.14,"at_4000_kwh":2083.98,"at_5000_kwh":2453.82,"at_8000_kwh":3563.34},"marginal_rates":{"excess_unit_cost_cents":55.42,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916075sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916075SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":33.69},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":27.24},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":33.69},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55.42},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":33.69}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.4},{"plan_id":"1st-energy-1st961476sre1eme-electricity","cdr_plan_id":"1ST961476SRE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"Standing Offer - Single Rate + Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.9,"supply_charge_cents_per_day":112,"block_rates":[{"volume_kwh":10.95,"rate_cents_per_kwh":41.9},{"volume_kwh":null,"rate_cents_per_kwh":45.6}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1665.8,"at_4000_kwh":2084.92,"at_5000_kwh":2540.92,"at_8000_kwh":3908.92},"marginal_rates":{"excess_unit_cost_cents":41.9,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st961476sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 1ST961476SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions.","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.4},{"plan_id":"1st-energy-1st961475sre1eme-electricity","cdr_plan_id":"1ST961475SRE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"Standing Offer - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.9,"supply_charge_cents_per_day":112,"block_rates":[{"volume_kwh":10.95,"rate_cents_per_kwh":41.9},{"volume_kwh":null,"rate_cents_per_kwh":45.6}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1665.8,"at_4000_kwh":2084.92,"at_5000_kwh":2540.92,"at_8000_kwh":3908.92},"marginal_rates":{"excess_unit_cost_cents":41.9,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st961475sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 1ST961475SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions.","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.4},{"plan_id":"momentum-mom916047sre1eme-electricity","cdr_plan_id":"MOM916047SRE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":37.57,"supply_charge_cents_per_day":160.85},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1714.2,"at_4000_kwh":2089.9,"at_5000_kwh":2465.6,"at_8000_kwh":3592.7},"marginal_rates":{"excess_unit_cost_cents":37.57,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916047sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916047SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.2},{"plan_id":"momentum-mom921290mre3eme-electricity","cdr_plan_id":"MOM921290MRE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Bill Boss Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":37.6,"supply_charge_cents_per_day":160.8},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1714.92,"at_4000_kwh":2090.92,"at_5000_kwh":2466.92,"at_8000_kwh":3594.92},"marginal_rates":{"excess_unit_cost_cents":37.6,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921290mre3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921290MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, sign up via our third party sales channels or call Momentum directly, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"momentum-mom921204mre2eme-electricity","cdr_plan_id":"MOM921204MRE2@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Suit Yourself Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":37.6,"supply_charge_cents_per_day":160.8},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1714.92,"at_4000_kwh":2090.92,"at_5000_kwh":2466.92,"at_8000_kwh":3594.92},"marginal_rates":{"excess_unit_cost_cents":37.6,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921204mre2eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921204MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, have necessary metering configuration. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"10% GreenPower included","description":"GreenPower comes with this plan. That means you offset 10% of your electricity usage with renewable energy."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"globird-glo964316sre1eme-electricity","cdr_plan_id":"GLO964316SRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"Resi Standing Offer Prices (Flat Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.5,"supply_charge_cents_per_day":140,"block_rates":[{"volume_kwh":365,"rate_cents_per_kwh":39.5},{"volume_kwh":null,"rate_cents_per_kwh":46}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1696,"at_4000_kwh":2091,"at_5000_kwh":2486,"at_8000_kwh":3671},"marginal_rates":{"excess_unit_cost_cents":39.5,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo964316sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 GLO964316SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 0.00 cents per kWh solar feed-in (inc. GST if any).","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.0000 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"For further information about this offer call GloBird on 133456 or visit www.globirdenergy.com.au or see our full terms and conditions here: www.globirdenergy.com.au/legal/","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","onExpiryDescription":"You will be notified of a new plan 1 month before the expiry date","billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"CONNECTION","amount":"70.00","description":"Min connection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"70.00","description":"Min disconnection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"globird-glo964317sre1eme-electricity","cdr_plan_id":"GLO964317SRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"Resi Standing Offer Prices (Flat Rate CTL)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.5,"supply_charge_cents_per_day":140,"block_rates":[{"volume_kwh":365,"rate_cents_per_kwh":39.5},{"volume_kwh":null,"rate_cents_per_kwh":46}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1696,"at_4000_kwh":2091,"at_5000_kwh":2486,"at_8000_kwh":3671},"marginal_rates":{"excess_unit_cost_cents":39.5,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo964317sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 GLO964317SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 0.00 cents per kWh solar feed-in (inc. GST if any).","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.0000 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"For further information about this offer call GloBird on 133456 or visit www.globirdenergy.com.au or see our full terms and conditions here: www.globirdenergy.com.au/legal/","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","onExpiryDescription":"You will be notified of a new plan 1 month before the expiry date","billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"CONNECTION","amount":"70.00","description":"Min connection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"70.00","description":"Min disconnection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1053728mre1eme-electricity","cdr_plan_id":"ENG1053728MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA _ENGIE Perks Plus Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1053728mre1eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 ENG1053728MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"My NRMA Membership","description":"Your My NRMA membership will be complimentary, a program that helps inspire you to explore new places and experiences, great deals on fuel, shopping, travel, entertainment and more along the way."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1053729mre1eme-electricity","cdr_plan_id":"ENG1053729MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA _ENGIE Perks Plus Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1053729mre1eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 ENG1053729MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"My NRMA Membership","description":"Your My NRMA membership will be complimentary, a program that helps inspire you to explore new places and experiences, great deals on fuel, shopping, travel, entertainment and more along the way."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048446mre2eme-electricity","cdr_plan_id":"ENG1048446MRE2@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA -ENGIE VPP Advantage Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Internet"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048446mre2eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048446MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE VPP Credits","description":"Receive $200 (GST exempt) sign-up credit as well as approx $20 monthly credit per battery for participating in our VPP, which is calculated by multiplying 0.657534c (GST exempt) by the number of days in a month applied on your next bill."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048445mre2eme-electricity","cdr_plan_id":"ENG1048445MRE2@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA -ENGIE VPP Advantage Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Internet"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048445mre2eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048445MRE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE VPP Credits","description":"Receive $200 (GST exempt) sign-up credit as well as approx $20 monthly credit per battery for participating in our VPP, which is calculated by multiplying 0.657534c (GST exempt) by the number of days in a month applied on your next bill."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048988mre1eme-electricity","cdr_plan_id":"ENG1048988MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE SOHO Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048988mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048988MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048987mre1eme-electricity","cdr_plan_id":"ENG1048987MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE SOHO Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048987mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048987MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048297mre1eme-electricity","cdr_plan_id":"ENG1048297MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Home Business Flyer Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048297mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048297MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Velocity Points","description":"You'll receive an upfront bonus of 15,000 Velocity Points, and then you'll receive 3 Velocity Points for every $1 you pay for electricity."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048296mre1eme-electricity","cdr_plan_id":"ENG1048296MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Home Business Flyer Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048296mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048296MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Velocity Points","description":"You'll receive an upfront bonus of 15,000 Velocity Points, and then you'll receive 3 Velocity Points for every $1 you pay for electricity."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048982mre1eme-electricity","cdr_plan_id":"ENG1048982MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048982mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048982MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048983mre1eme-electricity","cdr_plan_id":"ENG1048983MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048983mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048983MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048195mre1eme-electricity","cdr_plan_id":"ENG1048195MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048195mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048195MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048196mre1eme-electricity","cdr_plan_id":"ENG1048196MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048196mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048196MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048886mre1eme-electricity","cdr_plan_id":"ENG1048886MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA _ ENGIE Solar Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048886mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048886MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048881mre1eme-electricity","cdr_plan_id":"ENG1048881MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Movie Perks Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048881mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048881MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Movie tickets","description":"With ENGIE Movie Perks, you can enjoy movie tickets, two when you join and two more every six months. You will also get access to exclusive offers on additional tickets, food and beverages, all while enjoying great value on your electricity."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048887mre1eme-electricity","cdr_plan_id":"ENG1048887MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA _ ENGIE Solar Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048887mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048887MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048882mre1eme-electricity","cdr_plan_id":"ENG1048882MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Movie Perks Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048882mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048882MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Movie tickets","description":"With ENGIE Movie Perks, you can enjoy movie tickets, two when you join and two more every six months. You will also get access to exclusive offers on additional tickets, food and beverages, all while enjoying great value on your electricity."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1049592mre1eme-electricity","cdr_plan_id":"ENG1049592MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Home Business GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049592mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049592MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1049591mre1eme-electricity","cdr_plan_id":"ENG1049591MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Home Business GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049591mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049591MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1049407mre1eme-electricity","cdr_plan_id":"ENG1049407MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE EV Flex Charge Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric vehicle"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049407mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049407MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Flex Charge","description":"Get the flexibility of charging when you're out or at home. Receive a prepaid $100 Chargefox public charging voucher for when you're out, and from 12am to 6am AEST we'll credit back 10c per kwh of energy you use at home."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1049406mre1eme-electricity","cdr_plan_id":"ENG1049406MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE EV Flex Charge Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric vehicle"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049406mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049406MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"8c/kWh for the first 8kWh per day of solar export,","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"And 1c/kWh thereafter, based on a daily average over your billing period.","type":"single","rate_cents_per_kwh":1}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Flex Charge","description":"Get the flexibility of charging when you're out or at home. Receive a prepaid $100 Chargefox public charging voucher for when you're out, and from 12am to 6am AEST we'll credit back 10c per kwh of energy you use at home."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1047806mre1eme-electricity","cdr_plan_id":"ENG1047806MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1047806mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1047806MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1047786mre1eme-electricity","cdr_plan_id":"ENG1047786MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Seniors Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1047786mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1047786MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1047807mre1eme-electricity","cdr_plan_id":"ENG1047807MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1047807mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1047807MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1047785mre1eme-electricity","cdr_plan_id":"ENG1047785MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Seniors Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1047785mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1047785MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng938047sre4eme-electricity","cdr_plan_id":"ENG938047SRE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng938047sre4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG938047SRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng938046sre4eme-electricity","cdr_plan_id":"ENG938046SRE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng938046sre4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG938046SRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048572mre1eme-electricity","cdr_plan_id":"ENG1048572MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Perks Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048572mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048572MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"My NRMA membership","description":"Your My NRMA membership will be complimentary, a program that helps inspire you to explore new places and experiences, great deals on fuel, shopping, travel, entertainment and more along the way."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048604mre1eme-electricity","cdr_plan_id":"ENG1048604MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048604mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048604MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048603mre1eme-electricity","cdr_plan_id":"ENG1048603MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048603mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048603MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048571mre1eme-electricity","cdr_plan_id":"ENG1048571MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Perks Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Other"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048571mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048571MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"My NRMA membership","description":"Your My NRMA membership will be complimentary, a program that helps inspire you to explore new places and experiences, great deals on fuel, shopping, travel, entertainment and more along the way."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048506mre1eme-electricity","cdr_plan_id":"ENG1048506MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048506mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048506MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1049177mre1eme-electricity","cdr_plan_id":"ENG1049177MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049177mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049177MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1049178mre1eme-electricity","cdr_plan_id":"ENG1049178MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049178mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049178MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"To participate in the GreenPower accredited program a daily charge of 14.28c (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.00"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng1048507mre1eme-electricity","cdr_plan_id":"ENG1048507MRE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Home Business Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"SOHO"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048507mre1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048507MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng937894sre4eme-electricity","cdr_plan_id":"ENG937894SRE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng937894sre4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG937894SRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.ENGIE.com.au or call ENGIE on 13 88 08.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"engie-eng937893sre4eme-electricity","cdr_plan_id":"ENG937893SRE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.88,"supply_charge_cents_per_day":113.95,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":41.88},{"volume_kwh":null,"rate_cents_per_kwh":43.97}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1672.32,"at_4000_kwh":2091.12,"at_5000_kwh":2530.5,"at_8000_kwh":3849.6},"marginal_rates":{"excess_unit_cost_cents":41.88,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng937893sre4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG937893SRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.ENGIE.com.au or call ENGIE on 13 88 08.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori1019971mre1eme-electricity","cdr_plan_id":"ORI1019971MRE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Solar Boost","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1019971mre1eme-electricity&source=ai","last_verified":"2025-11-20","source_doc":"CDR EnergyPlanDetailV3 ORI1019971MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 8 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori1019996mre1eme-electricity","cdr_plan_id":"ORI1019996MRE1@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Solar Boost","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1019996mre1eme-electricity&source=ai","last_verified":"2025-11-20","source_doc":"CDR EnergyPlanDetailV3 ORI1019996MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 8 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori848701mre6eme-electricity","cdr_plan_id":"ORI848701MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Solar Partner Plus","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":12,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system; Solar System"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori848701mre6eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI848701MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 12 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":12},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori848718mre6eme-electricity","cdr_plan_id":"ORI848718MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Solar Partner Plus","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":12,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system; Solar System"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori848718mre6eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI848718MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 12 cents per kWh until a daily export limit of 8 kWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 kWh).","type":"single","rate_cents_per_kwh":12},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of 2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori474167mre16eme-electricity","cdr_plan_id":"ORI474167MRE16@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Home Support","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori474167mre16eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI474167MRE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"AGA EHA Program Membership","description":"You will receive an Emergency Home Assistance Program membership provided to you by Allianz Global Assistance for the 12 month benefit period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori474139mre16eme-electricity","cdr_plan_id":"ORI474139MRE16@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Home Support","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori474139mre16eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI474139MRE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"AGA EHA Program Membership","description":"You will receive an Emergency Home Assistance Program membership provided to you by Allianz Global Assistance for the 12 month benefit period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori429342sre15eme-electricity","cdr_plan_id":"ORI429342SRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429342sre15eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429342SRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori429297sre15eme-electricity","cdr_plan_id":"ORI429297SRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429297sre15eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429297SRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori698158mre6eme-electricity","cdr_plan_id":"ORI698158MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Essentials Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori698158mre6eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI698158MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"AGA EHA Program Membership","description":"You will receive an Emergency Home Assistance Program membership provided to you by Allianz Global Assistance for the 12 month benefit period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori698162mre6eme-electricity","cdr_plan_id":"ORI698162MRE6@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Essentials Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori698162mre6eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI698162MRE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"AGA EHA Program Membership","description":"You will receive an Emergency Home Assistance Program membership provided to you by Allianz Global Assistance for the 12 month benefit period."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori429222mre15eme-electricity","cdr_plan_id":"ORI429222MRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429222mre15eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429222MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"origin-ori429197mre15eme-electricity","cdr_plan_id":"ORI429197MRE15@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.87,"supply_charge_cents_per_day":103.19,"block_rates":[{"volume_kwh":10.9589,"rate_cents_per_kwh":42.87},{"volume_kwh":null,"rate_cents_per_kwh":46.33}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1662.74,"at_4000_kwh":2091.44,"at_5000_kwh":2554.74,"at_8000_kwh":3944.64},"marginal_rates":{"excess_unit_cost_cents":42.87,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429197mre15eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429197MRE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types.  Residential customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"agl-agl15385sre30eme-electricity","cdr_plan_id":"AGL15385SRE30@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Standing Offer - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.65,"supply_charge_cents_per_day":105.61,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":42.65},{"volume_kwh":null,"rate_cents_per_kwh":42.65}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1664.98,"at_4000_kwh":2091.48,"at_5000_kwh":2517.98,"at_8000_kwh":3797.48},"marginal_rates":{"excess_unit_cost_cents":42.65,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl15385sre30eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL15385SRE30@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"agl-agl15386sre30eme-electricity","cdr_plan_id":"AGL15386SRE30@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Residential Standing Offer - No Exit Fee","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.65,"supply_charge_cents_per_day":105.61,"block_rates":[{"volume_kwh":4000,"rate_cents_per_kwh":42.65},{"volume_kwh":null,"rate_cents_per_kwh":42.65}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1664.98,"at_4000_kwh":2091.48,"at_5000_kwh":2517.98,"at_8000_kwh":3797.48},"marginal_rates":{"excess_unit_cost_cents":42.65,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl15386sre30eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL15386SRE30@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"alinta-ali13156sre19eme-electricity","cdr_plan_id":"ALI13156SRE19@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"Standing Offer - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.95,"supply_charge_cents_per_day":113.3,"block_rates":[{"volume_kwh":3.2877,"rate_cents_per_kwh":41.95},{"volume_kwh":7.6712,"rate_cents_per_kwh":41.95},{"volume_kwh":16.44,"rate_cents_per_kwh":41.95},{"volume_kwh":27.3973,"rate_cents_per_kwh":41.95},{"volume_kwh":null,"rate_cents_per_kwh":41.95}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1672.05,"at_4000_kwh":2091.55,"at_5000_kwh":2511.05,"at_8000_kwh":3769.55},"marginal_rates":{"excess_unit_cost_cents":41.95,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali13156sre19eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI13156SRE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"alinta-ali13177sre18eme-electricity","cdr_plan_id":"ALI13177SRE18@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"Standing Offer - Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.95,"supply_charge_cents_per_day":113.3,"block_rates":[{"volume_kwh":3.2877,"rate_cents_per_kwh":41.95},{"volume_kwh":7.6712,"rate_cents_per_kwh":41.95},{"volume_kwh":16.44,"rate_cents_per_kwh":41.95},{"volume_kwh":27.3973,"rate_cents_per_kwh":41.95},{"volume_kwh":null,"rate_cents_per_kwh":41.95}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1672.05,"at_4000_kwh":2091.55,"at_5000_kwh":2511.05,"at_8000_kwh":3769.55},"marginal_rates":{"excess_unit_cost_cents":41.95,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali13177sre18eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI13177SRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"alinta-ali875595mre5eme-electricity","cdr_plan_id":"ALI875595MRE5@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SolarBalance Go - Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.95,"supply_charge_cents_per_day":113.3,"block_rates":[{"volume_kwh":3.2877,"rate_cents_per_kwh":41.95},{"volume_kwh":7.6712,"rate_cents_per_kwh":41.95},{"volume_kwh":16.44,"rate_cents_per_kwh":41.95},{"volume_kwh":27.3973,"rate_cents_per_kwh":41.95},{"volume_kwh":null,"rate_cents_per_kwh":41.95}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":9,"annual_cost_estimates":{"at_3000_kwh":1672.05,"at_4000_kwh":2091.55,"at_5000_kwh":2511.05,"at_8000_kwh":3769.55},"marginal_rates":{"excess_unit_cost_cents":41.95,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"System Size"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali875595mre5eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI875595MRE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Bonus FiT","description":"Solar Balance FiT","type":"single","rate_cents_per_kwh":9},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Stepped FiT","description":"This plan includes a stepped feed-in tariff, where you will receive a feed-in tariff of 9c/kWh for the first 10kW exported. For any export after that you will obtain Alinta Energys standard retailer feed-in tariff."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"alinta-ali875587mre4eme-electricity","cdr_plan_id":"ALI875587MRE4@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SolarBalance Go - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.95,"supply_charge_cents_per_day":113.3,"block_rates":[{"volume_kwh":3.2877,"rate_cents_per_kwh":41.95},{"volume_kwh":7.6712,"rate_cents_per_kwh":41.95},{"volume_kwh":16.44,"rate_cents_per_kwh":41.95},{"volume_kwh":27.3973,"rate_cents_per_kwh":41.95},{"volume_kwh":null,"rate_cents_per_kwh":41.95}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":9,"annual_cost_estimates":{"at_3000_kwh":1672.05,"at_4000_kwh":2091.55,"at_5000_kwh":2511.05,"at_8000_kwh":3769.55},"marginal_rates":{"excess_unit_cost_cents":41.95,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"System Size"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali875587mre4eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI875587MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Bonus FiT","description":"Solar Balance FiT","type":"single","rate_cents_per_kwh":9},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Stepped FiT","description":"This plan includes a stepped feed-in tariff, where you will receive a feed-in tariff of 9c/kWh for the first 10kW exported. For any export after that you will obtain Alinta Energys standard retailer feed-in tariff."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"diamond-dia786929sre3eme-electricity","cdr_plan_id":"DIA786929SRE3@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Standing Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.35,"supply_charge_cents_per_day":87},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1648.05,"at_4000_kwh":2091.55,"at_5000_kwh":2535.05,"at_8000_kwh":3865.55},"marginal_rates":{"excess_unit_cost_cents":44.35,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia786929sre3eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 DIA786929SRE3@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms & conditions, visit our website www.diamondenergy.com.au or contact us on 1300 838 009.","variation":"Variations to energy rates will be published on our website at least 10 business days prior to commencement and we'll provide written notice at least 5 days prior to commencement. Standing offer prices will not be varied more often than once every 6 months. Other charges may be varied with notice.","onExpiryDescription":"No fixed term. This agreement continues on a rolling monthly or quarterly basis as per the bill frequency.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured payment fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late Payment Fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"diamond-dia934001sre1eme-electricity","cdr_plan_id":"DIA934001SRE1@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Standing Two Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.35,"supply_charge_cents_per_day":87},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1648.05,"at_4000_kwh":2091.55,"at_5000_kwh":2535.05,"at_8000_kwh":3865.55},"marginal_rates":{"excess_unit_cost_cents":44.35,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia934001sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 DIA934001SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms & conditions, visit our website www.diamondenergy.com.au or contact us on 1300 838 009.","variation":"Variations to energy rates will be published on our website at least 10 business days prior to commencement and we'll provide written notice at least 5 days prior to commencement. Standing offer prices will not be varied more often than once every 6 months. Other charges may be varied with notice.","onExpiryDescription":"No fixed term. This agreement continues on a rolling monthly or quarterly basis as per the bill frequency.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured payment fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late Payment Fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"zen-energy-zen926297sre1eme-electricity","cdr_plan_id":"ZEN926297SRE1@EME","retailer":"ZEN Energy","retailer_slug":"zen-energy","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/1fc3b6168abbd718eab34718a4faac54.png","plan_name":"ZEN Energy Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.19,"supply_charge_cents_per_day":143.55},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1699.66,"at_4000_kwh":2091.56,"at_5000_kwh":2483.46,"at_8000_kwh":3659.16},"marginal_rates":{"excess_unit_cost_cents":39.19,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=zen-energy-zen926297sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 ZEN926297SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"Only available to customers with an applicable network tariff and meter type.  Not available in all areas or property types. Residential customers only. Full terms and conditions available at https://www.zenenergy.com.au/knowledge-base/reports-policies-manuals/","variation":"We may vary your rates, fees and charges at any time in accordance with the applicable regulatory requirements. We will give you advance notice of any changes, which may be on your bill.","billFrequency":["P1M"],"paymentOption":["BPAY","DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. For more information on additional fees and charges, please visit https://www.zenenergy.com.au/knowledge-base/reports-policies-manuals/","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"$21.23 (incl. GST) Standard move-out fee. This fee may apply when you move out and require a final meter read. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"$63.71 (incl. GST) This fee may apply when reconnecting power to your property where you have been disconnected due to non-payment. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"$63.71 (incl.GST) This fee may be charged when disconnecting your power for non-payment. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene996208mre3eme-electricity","cdr_plan_id":"ENE996208MRE3@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - My Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene996208mre3eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE996208MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene996212mre3eme-electricity","cdr_plan_id":"ENE996212MRE3@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Residential Connections","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene996212mre3eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE996212MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene996213mre3eme-electricity","cdr_plan_id":"ENE996213MRE3@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Residential Connections","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene996213mre3eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE996213MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene996209mre3eme-electricity","cdr_plan_id":"ENE996209MRE3@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - My Connect","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene996209mre3eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE996209MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene681802mre11eme-electricity","cdr_plan_id":"ENE681802MRE11@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Rate Fix","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene681802mre11eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE681802MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","onExpiryDescription":"The Fixed Rate Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Fixed Rate Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene676774mre10eme-electricity","cdr_plan_id":"ENE676774MRE10@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Connect Now","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene676774mre10eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE676774MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene681809mre11eme-electricity","cdr_plan_id":"ENE681809MRE11@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Rate Fix","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene681809mre11eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE681809MRE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","onExpiryDescription":"The Fixed Rate Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Fixed Rate Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene676771mre10eme-electricity","cdr_plan_id":"ENE676771MRE10@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Connect Now","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene676771mre10eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE676771MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene676761mre10eme-electricity","cdr_plan_id":"ENE676761MRE10@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Third Party Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene676761mre10eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE676761MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene676769mre10eme-electricity","cdr_plan_id":"ENE676769MRE10@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Balance Plan - Third Party Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Comparators only"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene676769mre10eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE676769MRE10@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene379831mre22eme-electricity","cdr_plan_id":"ENE379831MRE22@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Flexi Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene379831mre22eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE379831MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene360429mre26eme-electricity","cdr_plan_id":"ENE360429MRE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Solar Max","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene360429mre26eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE360429MRE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Max Superior Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff for the first 10kWh per day (excl. GST if any)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff thereafter (excl. GST if any)","type":"single","rate_cents_per_kwh":3}],"terms":"The higher feed-in-tariff applies for the first 10kWh average solar export per day across your billing period, after which our standard feed-in-tariff rate will apply to the balance of solar export. The daily export is averaged by dividing the total solar export by the number of days in each billing period. Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene379843mre22eme-electricity","cdr_plan_id":"ENE379843MRE22@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Flexi Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene379843mre22eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE379843MRE22@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene360418mre26eme-electricity","cdr_plan_id":"ENE360418MRE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Solar Max","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene360418mre26eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE360418MRE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Max Superior Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff for the first 10kWh per day (excl. GST if any)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff thereafter (excl. GST if any)","type":"single","rate_cents_per_kwh":3}],"terms":"The higher feed-in-tariff applies for the first 10kWh average solar export per day across your billing period, after which our standard feed-in-tariff rate will apply to the balance of solar export. The daily export is averaged by dividing the total solar export by the number of days in each billing period. Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"Your market contract is ongoing. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene19219sre39eme-electricity","cdr_plan_id":"ENE19219SRE39@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Standing Offer (Home)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene19219sre39eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE19219SRE39@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"The rates for Standing Offer (Home) may vary, either when the AER changes the reference price, or when we review our rates each year. We will notify you before any rate change occurs.","onExpiryDescription":"This contract continues for as long as you remain on the plan.","billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"10.9","description":"$10.90 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"energyaustralia-ene19189sre39eme-electricity","cdr_plan_id":"ENE19189SRE39@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Standing Offer (Home)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.98,"supply_charge_cents_per_day":113},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1671.85,"at_4000_kwh":2091.65,"at_5000_kwh":2511.45,"at_8000_kwh":3770.85},"marginal_rates":{"excess_unit_cost_cents":41.98,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene19189sre39eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ENE19189SRE39@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer Feed-in-Tariff","description":"EnergyAustralia Retailer Feed-in-Tariff (excl. GST if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government Regulated Feed-in-Tariff","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Please refer to our website www.energyaustralia.com.au for full terms and conditions.","variation":"The rates for Standing Offer (Home) may vary, either when the AER changes the reference price, or when we review our rates each year. We will notify you before any rate change occurs.","onExpiryDescription":"This contract continues for as long as you remain on the plan.","billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or BPay.","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property and disconnecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for more details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"LATE_PAYMENT","amount":"10.9","description":"$10.90 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.69","description":"Incl. GST effective from 6 April 2020. Refer to www.energyaustralia.com.au/home/help-and-support/faqs/paper-bill-fee for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"PowerResponse program rebate","description":"You may be eligible for our PowerResponse program, and by participating in events, you may be eligible for rebates which may change over time. See website energyaustralia.com.au/power-response for details on eligibility criteria, T&C's and rebates."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 20% = $0.0495 x (20% x total usage)","tiers":[{"percentGreen":20,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"radian-ior1045451sre1eme-electricity","cdr_plan_id":"IOR1045451SRE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Standing Offer - Residential Anytime","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44,"supply_charge_cents_per_day":90.91},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1651.82,"at_4000_kwh":2091.82,"at_5000_kwh":2531.82,"at_8000_kwh":3851.82},"marginal_rates":{"excess_unit_cost_cents":44,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1045451sre1eme-electricity&source=ai","last_verified":"2026-04-13","source_doc":"CDR EnergyPlanDetailV3 IOR1045451SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":5}],"terms":"For futher details on the terms and conditions of the offer and other fees and charges, please visit www.ioenergy.com.au or call 1300313463","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, please visit www.ioenergy.com.au or call 1300313463","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post.Includes GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments will incur a 0.46%. Waived for direct debit","term":"PERCENT_OF_BILL","rate":"0.0046"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percent of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":9.1},{"plan_id":"next-business-nex1045854sre1eme-electricity","cdr_plan_id":"NEX1045854SRE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"NBE Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.18,"supply_charge_cents_per_day":90.75,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":44.18},{"volume_kwh":null,"rate_cents_per_kwh":44.18}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1656.64,"at_4000_kwh":2098.44,"at_5000_kwh":2540.24,"at_8000_kwh":3865.64},"marginal_rates":{"excess_unit_cost_cents":44.18,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1045854sre1eme-electricity&source=ai","last_verified":"2026-04-16","source_doc":"CDR EnergyPlanDetailV3 NEX1045854SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Standing: Single Rate Feed In Tariff","description":"Solar | All kWh/day","type":"single","rate_cents_per_kwh":2}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates in accordance with applicable Energy Laws.","onExpiryDescription":"This Standing Offer Contract continues until you change to another electricity supplier.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"RECONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":8.8},{"plan_id":"next-business-nex1044170mbe1eme-electricity","cdr_plan_id":"NEX1044170MBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"Next Assured Bus 15% GTD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.71,"supply_charge_cents_per_day":96.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.1,"annual_cost_estimates":{"at_3000_kwh":1663.53,"at_4000_kwh":2100.63,"at_5000_kwh":2537.73,"at_8000_kwh":3849.03},"marginal_rates":{"excess_unit_cost_cents":43.71,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1044170mbe1eme-electricity&source=ai","last_verified":"2026-03-31","source_doc":"CDR EnergyPlanDetailV3 NEX1044170MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT Premium: Single Rate Feed In Tariff","description":"FiT Premium | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"RFIT: Single Rate Feed In Tariff","description":"RFIT | All kWh/day","type":"single","rate_cents_per_kwh":0.1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":7,"hours":"5pm-7:59pm","startHour":17,"endHour":20}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":0,"hours":"10am-2:59pm","startHour":10,"endHour":15}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":0,"endHour":10},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":15,"endHour":17},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":20,"endHour":24}]}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates at any time in accordance with our terms and conditions.","onExpiryDescription":"This contract continues for as long as you choose to remain on the plan.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"CC_PROCESSING","amount":"0.0195","description":"1.95% AMEX credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0195"},{"type":"RECONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0077","description":"0.77% Visa & Mastercard credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0077"},{"type":"OTHER","amount":"77.00","description":"COMMS3 Meter Charge","term":"FIXED"},{"type":"OTHER","amount":"77.00","description":"COMMS4 Meter Charge","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":8.7},{"plan_id":"next-business-nex1044169mbe1eme-electricity","cdr_plan_id":"NEX1044169MBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"Next Assured Bus 15% GTD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.71,"supply_charge_cents_per_day":96.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.1,"annual_cost_estimates":{"at_3000_kwh":1663.53,"at_4000_kwh":2100.63,"at_5000_kwh":2537.73,"at_8000_kwh":3849.03},"marginal_rates":{"excess_unit_cost_cents":43.71,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1044169mbe1eme-electricity&source=ai","last_verified":"2026-03-31","source_doc":"CDR EnergyPlanDetailV3 NEX1044169MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT Premium: Single Rate Feed In Tariff","description":"FiT Premium | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"RFIT: Single Rate Feed In Tariff","description":"RFIT | All kWh/day","type":"single","rate_cents_per_kwh":0.1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":7,"hours":"5pm-7:59pm","startHour":17,"endHour":20}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":0,"hours":"10am-2:59pm","startHour":10,"endHour":15}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":0,"endHour":10},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":15,"endHour":17},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":20,"endHour":24}]}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates at any time in accordance with our terms and conditions.","onExpiryDescription":"This contract continues for as long as you choose to remain on the plan.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"CC_PROCESSING","amount":"0.0195","description":"1.95% AMEX credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0195"},{"type":"RECONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0077","description":"0.77% Visa & Mastercard credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0077"},{"type":"OTHER","amount":"77.00","description":"COMMS3 Meter Charge","term":"FIXED"},{"type":"OTHER","amount":"77.00","description":"COMMS4 Meter Charge","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":8.7},{"plan_id":"momentum-mom919634mbe6eme-electricity","cdr_plan_id":"MOM919634MBE6@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Pure Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":226.7,"peak_cents_per_kwh":38.9,"off_peak_cents_per_kwh":29.2,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1790.76,"at_4000_kwh":2111.86,"at_5000_kwh":2432.96,"at_8000_kwh":3396.26},"marginal_rates":{"excess_unit_cost_cents":38.9,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919634mbe6eme-electricity&source=ai","last_verified":"2026-05-20","source_doc":"CDR EnergyPlanDetailV3 MOM919634MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must have an ABN, communicate with us and receive your bills electronically, have the necessary metering configuration and meet all eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.2},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":38.9},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.2}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":8.2},{"plan_id":"energy-locals-retail-lcl986534mbe1eme-electricity","cdr_plan_id":"LCL986534MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.64,"supply_charge_cents_per_day":155.91},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1728.27,"at_4000_kwh":2114.67,"at_5000_kwh":2501.07,"at_8000_kwh":3660.27},"marginal_rates":{"excess_unit_cost_cents":38.64,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986534mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986534MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":8.1},{"plan_id":"covau-cov1042141mre1eme-electricity","cdr_plan_id":"COV1042141MRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Residential Flexible + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.85,"peak_cents_per_kwh":56.12,"off_peak_cents_per_kwh":40.63,"shoulder_cents_per_kwh":30.62,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1684.6,"at_4000_kwh":2117.35,"at_5000_kwh":2550.1,"at_8000_kwh":3848.35},"marginal_rates":{"excess_unit_cost_cents":56.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1042141mre1eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 COV1042141MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend","description":"$50 credit applied to you and your friends account if you signup using a Refer a Friend link from an existing CovaU customer. Applies to new customers only who switch their electricity to CovaU. T&Cs apply, refer to https://covau.com.au/refer."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":56.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":40.63},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.62},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":56.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":8},{"plan_id":"covau-cov1042140mre1eme-electricity","cdr_plan_id":"COV1042140MRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Residential Flexible","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.85,"peak_cents_per_kwh":56.12,"off_peak_cents_per_kwh":40.63,"shoulder_cents_per_kwh":30.62,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1684.6,"at_4000_kwh":2117.35,"at_5000_kwh":2550.1,"at_8000_kwh":3848.35},"marginal_rates":{"excess_unit_cost_cents":56.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1042140mre1eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 COV1042140MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend","description":"$50 credit applied to you and your friends account if you signup using a Refer a Friend link from an existing CovaU customer. Applies to new customers only who switch their electricity to CovaU. T&Cs apply, refer to https://covau.com.au/refer."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":56.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":40.63},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.62},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":56.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":8},{"plan_id":"covau-cov1041704mre1eme-electricity","cdr_plan_id":"COV1041704MRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Residential Flexible","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.85,"peak_cents_per_kwh":56.12,"off_peak_cents_per_kwh":40.63,"shoulder_cents_per_kwh":30.62,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1684.6,"at_4000_kwh":2117.35,"at_5000_kwh":2550.1,"at_8000_kwh":3848.35},"marginal_rates":{"excess_unit_cost_cents":56.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1041704mre1eme-electricity&source=ai","last_verified":"2026-03-13","source_doc":"CDR EnergyPlanDetailV3 COV1041704MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend","description":"$50 credit applied to you and your friends account if you signup using a Refer a Friend link from an existing CovaU customer. Applies to new customers only who switch their electricity to CovaU. T&Cs apply, refer to https://covau.com.au/refer."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 1.65c /kWh inc. GST we ensure energy equal to 30% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":30,"amount":"0.0165"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":56.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":40.63},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.62},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":56.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":8},{"plan_id":"covau-cov1041705mre1eme-electricity","cdr_plan_id":"COV1041705MRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Residential Flexible + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":105.85,"peak_cents_per_kwh":56.12,"off_peak_cents_per_kwh":40.63,"shoulder_cents_per_kwh":30.62,"peak_hours":"6am-9:59am mon, tue, wed, thu, fri, sat, sun; 3pm-12:59am mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"1am-5:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"10am-2:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1684.6,"at_4000_kwh":2117.35,"at_5000_kwh":2550.1,"at_8000_kwh":3848.35},"marginal_rates":{"excess_unit_cost_cents":56.12,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1041705mre1eme-electricity&source=ai","last_verified":"2026-03-13","source_doc":"CDR EnergyPlanDetailV3 COV1041705MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend","description":"$50 credit applied to you and your friends account if you signup using a Refer a Friend link from an existing CovaU customer. Applies to new customers only who switch their electricity to CovaU. T&Cs apply, refer to https://covau.com.au/refer."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 1.65c /kWh inc. GST we ensure energy equal to 30% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":30,"amount":"0.0165"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":1,"rateCents":56.12},{"type":"OFF_PEAK","startHour":1,"endHour":6,"rateCents":40.63},{"type":"PEAK","startHour":6,"endHour":10,"rateCents":56.12},{"type":"SHOULDER","startHour":10,"endHour":15,"rateCents":30.62},{"type":"PEAK","startHour":15,"endHour":24,"rateCents":56.12}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":8},{"plan_id":"origin-ori430725mbe19eme-electricity","cdr_plan_id":"ORI430725MBE19@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Solar Boost","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":56.62,"off_peak_cents_per_kwh":36.63,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1694.62,"at_4000_kwh":2120.89,"at_5000_kwh":2547.16,"at_8000_kwh":3825.97},"marginal_rates":{"excess_unit_cost_cents":56.62,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430725mbe19eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI430725MBE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 8 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":56.62},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.63},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.8},{"plan_id":"origin-ori430731mbe19eme-electricity","cdr_plan_id":"ORI430731MBE19@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Solar Boost","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":56.62,"off_peak_cents_per_kwh":36.63,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1694.62,"at_4000_kwh":2120.89,"at_5000_kwh":2547.16,"at_8000_kwh":3825.97},"marginal_rates":{"excess_unit_cost_cents":56.62,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430731mbe19eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI430731MBE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 8 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":56.62},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.63},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.8},{"plan_id":"origin-ori429309sbe14eme-electricity","cdr_plan_id":"ORI429309SBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":56.62,"off_peak_cents_per_kwh":36.63,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1694.62,"at_4000_kwh":2120.89,"at_5000_kwh":2547.16,"at_8000_kwh":3825.97},"marginal_rates":{"excess_unit_cost_cents":56.62,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429309sbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429309SBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":56.62},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.63},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.8},{"plan_id":"origin-ori429304sbe14eme-electricity","cdr_plan_id":"ORI429304SBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":56.62,"off_peak_cents_per_kwh":36.63,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1694.62,"at_4000_kwh":2120.89,"at_5000_kwh":2547.16,"at_8000_kwh":3825.97},"marginal_rates":{"excess_unit_cost_cents":56.62,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429304sbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429304SBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":56.62},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.63},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.8},{"plan_id":"origin-ori429263mbe14eme-electricity","cdr_plan_id":"ORI429263MBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":56.62,"off_peak_cents_per_kwh":36.63,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1694.62,"at_4000_kwh":2120.89,"at_5000_kwh":2547.16,"at_8000_kwh":3825.97},"marginal_rates":{"excess_unit_cost_cents":56.62,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429263mbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429263MBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":56.62},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.63},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.8},{"plan_id":"origin-ori429239mbe14eme-electricity","cdr_plan_id":"ORI429239MBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":113.92,"peak_cents_per_kwh":56.62,"off_peak_cents_per_kwh":36.63,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1694.62,"at_4000_kwh":2120.89,"at_5000_kwh":2547.16,"at_8000_kwh":3825.97},"marginal_rates":{"excess_unit_cost_cents":56.62,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429239mbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429239MBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":56.62},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.63},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.63},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.63}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.8},{"plan_id":"flipped-fea1059523mbe1eme-electricity","cdr_plan_id":"FEA1059523MBE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Business Freedom Switched On! Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":243.32,"peak_cents_per_kwh":55.7,"off_peak_cents_per_kwh":12.96,"shoulder_cents_per_kwh":38.19,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9am-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"9pm-8:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1812.96,"at_4000_kwh":2121.24,"at_5000_kwh":2429.52,"at_8000_kwh":3354.36},"marginal_rates":{"excess_unit_cost_cents":55.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059523mbe1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059523MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":9,"rateCents":38.19},{"type":"OFF_PEAK","startHour":9,"endHour":17,"rateCents":12.96},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55.7},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":38.19}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.8},{"plan_id":"alinta-ali1008592mre3eme-electricity","cdr_plan_id":"ALI1008592MRE3@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Advantage - Demand Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.06,"supply_charge_cents_per_day":76.49},"demand_charges":[{"display_name":"Demand Summer (c/kW/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":42.19,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Non-Summer (c/kW/day)","description":"April to October, Mon-Fri","amount_cents_per_kw":20.84,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1660.99,"at_4000_kwh":2121.59,"at_5000_kwh":2582.19,"at_8000_kwh":3963.99},"marginal_rates":{"excess_unit_cost_cents":46.06,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1008592mre3eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 ALI1008592MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.8},{"plan_id":"alinta-ali1008591mre3eme-electricity","cdr_plan_id":"ALI1008591MRE3@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Advantage - Demand Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.06,"supply_charge_cents_per_day":76.49},"demand_charges":[{"display_name":"Demand Summer (c/kW/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":42.19,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Non-Summer (c/kW/day)","description":"April to October, Mon-Fri","amount_cents_per_kw":20.84,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1660.99,"at_4000_kwh":2121.59,"at_5000_kwh":2582.19,"at_8000_kwh":3963.99},"marginal_rates":{"excess_unit_cost_cents":46.06,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1008591mre3eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 ALI1008591MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.8},{"plan_id":"next-business-nex1045853sre1eme-electricity","cdr_plan_id":"NEX1045853SRE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"NBE Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.18,"supply_charge_cents_per_day":97.35,"block_rates":[{"volume_kwh":11,"rate_cents_per_kwh":44.18},{"volume_kwh":null,"rate_cents_per_kwh":44.18}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1680.73,"at_4000_kwh":2122.53,"at_5000_kwh":2564.33,"at_8000_kwh":3889.73},"marginal_rates":{"excess_unit_cost_cents":44.18,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1045853sre1eme-electricity&source=ai","last_verified":"2026-04-16","source_doc":"CDR EnergyPlanDetailV3 NEX1045853SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Standing: Single Rate Feed In Tariff","description":"Solar | All kWh/day","type":"single","rate_cents_per_kwh":2}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates in accordance with applicable Energy Laws.","onExpiryDescription":"This Standing Offer Contract continues until you change to another electricity supplier.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"RECONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.8},{"plan_id":"amber-electric-amb1042968sbe1eme-electricity","cdr_plan_id":"AMB1042968SBE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Standing Offer: Fixed Rate Small Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.96,"supply_charge_cents_per_day":100.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1687.34,"at_4000_kwh":2126.94,"at_5000_kwh":2566.54,"at_8000_kwh":3885.34},"marginal_rates":{"excess_unit_cost_cents":43.96,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042968sbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042968SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Fixed feed in","description":"Fixed feed in of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. Available for small business customers in SA Power's distribution region. For illustrative purposes, tariff BSR assumed. Feed-In Tariffs are only valid if applicable","variation":"This is a fixed tariff. You will not get access to the wholesale rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these fixed rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.6},{"plan_id":"globird-glo1054006mre1eme-electricity","cdr_plan_id":"GLO1054006MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"GLOSAVE Residential (Flat Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.6,"supply_charge_cents_per_day":116,"block_rates":[{"volume_kwh":15,"rate_cents_per_kwh":42.6},{"volume_kwh":null,"rate_cents_per_kwh":44.6}]},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1701.4,"at_4000_kwh":2127.4,"at_5000_kwh":2553.4,"at_8000_kwh":3881.9},"marginal_rates":{"excess_unit_cost_cents":42.6,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054006mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054006MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers with an applicable network tariff and an electricity basic meter. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456. Note, step 1 is calculated by multiplying the daily allowance by the number of days in the billing period. For example, a daily allowance of 25kWh/day and a 30-day billing period has a step 1 of 750kWh, or a 31-day 775kWh.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.5},{"plan_id":"globird-glo1054005mre1eme-electricity","cdr_plan_id":"GLO1054005MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"GLOSAVE Residential (Flat Rate CTL Load)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.6,"supply_charge_cents_per_day":116,"block_rates":[{"volume_kwh":15,"rate_cents_per_kwh":42.6},{"volume_kwh":null,"rate_cents_per_kwh":44.6}]},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1701.4,"at_4000_kwh":2127.4,"at_5000_kwh":2553.4,"at_8000_kwh":3881.9},"marginal_rates":{"excess_unit_cost_cents":42.6,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054005mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054005MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers with an applicable network tariff and an electricity basic meter. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456. Note, step 1 is calculated by multiplying the daily allowance by the number of days in the billing period. For example, a daily allowance of 25kWh/day and a 30-day billing period has a step 1 of 750kWh, or a 31-day 775kWh.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.5},{"plan_id":"zen-energy-zen926428sre1eme-electricity","cdr_plan_id":"ZEN926428SRE1@EME","retailer":"ZEN Energy","retailer_slug":"zen-energy","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/1fc3b6168abbd718eab34718a4faac54.png","plan_name":"ZEN Energy + CL Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.82,"supply_charge_cents_per_day":146.9},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1730.79,"at_4000_kwh":2128.98,"at_5000_kwh":2527.19,"at_8000_kwh":3721.79},"marginal_rates":{"excess_unit_cost_cents":39.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=zen-energy-zen926428sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 ZEN926428SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"Only available to customers with an applicable network tariff and meter type.  Not available in all areas or property types. Residential customers only. Full terms and conditions available at https://www.zenenergy.com.au/knowledge-base/reports-policies-manuals/","variation":"We may vary your rates, fees and charges at any time in accordance with the applicable regulatory requirements. We will give you advance notice of any changes, which may be on your bill.","billFrequency":["P1M"],"paymentOption":["BPAY","DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. For more information on additional fees and charges, please visit https://www.zenenergy.com.au/knowledge-base/reports-policies-manuals/","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"$21.23 (incl. GST) Standard move-out fee. This fee may apply when you move out and require a final meter read. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"$63.71 (incl. GST) This fee may apply when reconnecting power to your property where you have been disconnected due to non-payment. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"$63.71 (incl.GST) This fee may be charged when disconnecting your power for non-payment. This is a SAPN network charge, which ZEN passes through. Actual fee may vary.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.5},{"plan_id":"origin-ori1018287mre3eme-electricity","cdr_plan_id":"ORI1018287MRE3@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Battery Starter","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":106,"peak_cents_per_kwh":54.64,"off_peak_cents_per_kwh":39.02,"shoulder_cents_per_kwh":null,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1698.08,"at_4000_kwh":2135.14,"at_5000_kwh":2572.2,"at_8000_kwh":3883.38},"marginal_rates":{"excess_unit_cost_cents":54.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system; Solar PV system; Tariff"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori1018287mre3eme-electricity&source=ai","last_verified":"2026-01-07","source_doc":"CDR EnergyPlanDetailV3 ORI1018287MRE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 18 cents per kWh during Peak hours between 5pm to 9 pm all days.","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":18,"hours":"5pm-8:59pm","startHour":17,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For the remaining Off-Peak hours between 9pm to 5pm, Origin Offers 4 cents per kWh.","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":4,"hours":"9pm-4:59pm","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":4,"hours":"9pm-4:59pm","startHour":0,"endHour":17}]}],"terms":"Your Solar system must be net metered, not exceed 50 KW of inverter capacity or must be limited to 50KW of export and you must not be receiving a feed-in tariff under any government scheme.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":39.02},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":54.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39.02}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":7.2},{"plan_id":"energy-locals-retail-lcl987116sbe1eme-electricity","cdr_plan_id":"LCL987116SBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":374.55,"peak_cents_per_kwh":0,"off_peak_cents_per_kwh":25.91,"shoulder_cents_per_kwh":32.27,"peak_hours":"Summer Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Winter Off Peak: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun · Summer Peak: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-4:59pm sat, sun","shoulder_hours":"Winter Off Peak: 7am-8:59pm mon, tue, wed, thu, fri · Summer Peak: 7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Anytime Demand","description":"Demand Charge  All kVA (c/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.64,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":4,"season_end_month":10,"season_label":"Winter Off Peak"},{"display_name":"Anytime Demand","description":"Demand Charge  All kVA (c/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.64,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":11,"season_end_month":3,"season_label":"Summer Peak"}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1949.38,"at_4000_kwh":2143.47,"at_5000_kwh":2337.56,"at_8000_kwh":2919.83},"marginal_rates":{"excess_unit_cost_cents":0,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl987116sbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL987116SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"touSchedule":[{"season":"Winter Off Peak (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":25.91},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":32.27},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":25.91}]}]},{"season":"Summer Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":25.91},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":32.27},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":38.18},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":25.91},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":38.18},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":25.91}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.8},{"plan_id":"agl-agl1055671mre1eme-electricity","cdr_plan_id":"AGL1055671MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":47.67,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"original_tariff_type":"time_of_use","peak_cents_per_kwh":47.67,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1710.39,"at_4000_kwh":2143.86,"at_5000_kwh":2577.32,"at_8000_kwh":3877.71},"marginal_rates":{"excess_unit_cost_cents":47.67,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055671mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055671MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply and controlled load charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":47.67},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":47.67}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.8},{"plan_id":"agl-agl1055673mre1eme-electricity","cdr_plan_id":"AGL1055673MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":47.67,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"original_tariff_type":"time_of_use","peak_cents_per_kwh":47.67,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1710.39,"at_4000_kwh":2143.86,"at_5000_kwh":2577.32,"at_8000_kwh":3877.71},"marginal_rates":{"excess_unit_cost_cents":47.67,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055673mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055673MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":47.67},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":47.67}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.8},{"plan_id":"agl-agl1055634mre1eme-electricity","cdr_plan_id":"AGL1055634MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":47.67,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"original_tariff_type":"time_of_use","peak_cents_per_kwh":47.67,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1710.39,"at_4000_kwh":2143.86,"at_5000_kwh":2577.32,"at_8000_kwh":3877.71},"marginal_rates":{"excess_unit_cost_cents":47.67,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055634mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055634MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":47.67},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":47.67}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.8},{"plan_id":"agl-agl1055631mre1eme-electricity","cdr_plan_id":"AGL1055631MRE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":47.67,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"original_tariff_type":"time_of_use","peak_cents_per_kwh":47.67,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1710.39,"at_4000_kwh":2143.86,"at_5000_kwh":2577.32,"at_8000_kwh":3877.71},"marginal_rates":{"excess_unit_cost_cents":47.67,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1055631mre1eme-electricity&source=ai","last_verified":"2026-05-21","source_doc":"CDR EnergyPlanDetailV3 AGL1055631MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply and controlled load charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":47.67},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":47.67}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.8},{"plan_id":"agl-agl978229mre14eme-electricity","cdr_plan_id":"AGL978229MRE14@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":47.67,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"original_tariff_type":"time_of_use","peak_cents_per_kwh":47.67,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1710.39,"at_4000_kwh":2143.86,"at_5000_kwh":2577.32,"at_8000_kwh":3877.71},"marginal_rates":{"excess_unit_cost_cents":47.67,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl978229mre14eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 AGL978229MRE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"RETAILER","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":47.67},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":47.67}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.8},{"plan_id":"agl-agl899851mre17eme-electricity","cdr_plan_id":"AGL899851MRE17@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":47.67,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"original_tariff_type":"time_of_use","peak_cents_per_kwh":47.67,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1710.39,"at_4000_kwh":2143.86,"at_5000_kwh":2577.32,"at_8000_kwh":3877.71},"marginal_rates":{"excess_unit_cost_cents":47.67,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl899851mre17eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 AGL899851MRE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"RETAILER","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply and controlled load charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":47.67},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":47.67}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.8},{"plan_id":"agl-agl979831mre8eme-electricity","cdr_plan_id":"AGL979831MRE8@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":47.67,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"original_tariff_type":"time_of_use","peak_cents_per_kwh":47.67,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1710.39,"at_4000_kwh":2143.86,"at_5000_kwh":2577.32,"at_8000_kwh":3877.71},"marginal_rates":{"excess_unit_cost_cents":47.67,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl979831mre8eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 AGL979831MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"RETAILER","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":47.67},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":47.67}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.8},{"plan_id":"agl-agl979832mre8eme-electricity","cdr_plan_id":"AGL979832MRE8@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Three for Free (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":47.67,"supply_charge_cents_per_day":112.33,"free_window_start":"10:00","free_window_end":"13:00","free_window_fraction":0.0907,"original_tariff_type":"time_of_use","peak_cents_per_kwh":47.67,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–1pm daily"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":16,"annual_cost_estimates":{"at_3000_kwh":1710.39,"at_4000_kwh":2143.86,"at_5000_kwh":2577.32,"at_8000_kwh":3877.71},"marginal_rates":{"excess_unit_cost_cents":47.67,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl979832mre8eme-electricity&source=ai","last_verified":"2026-05-12","source_doc":"CDR EnergyPlanDetailV3 AGL979832MRE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"16.00 cents/kwh from 5pm - 9pm","description":"16.00 cents/kwh from 5pm - 9pm","type":"single","rate_cents_per_kwh":16},{"scheme":"OTHER","payerType":"RETAILER","displayName":"0 cents/kwh all other times","description":"0 cents/kwh all other times","type":"single","rate_cents_per_kwh":0}],"terms":"This offer applies to customers with a smart meter and an applicable network tariff. For full eligibility criteria, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"Three for Free Usage","description":"Free electricity usage applies from 10am to 1pm every day. Daily supply and controlled load charges still apply. This rate can change with notice to you."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_WEEK","description":"For $1 per week inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"1.00"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":47.67},{"type":"OFF_PEAK","startHour":10,"endHour":13,"rateCents":0},{"type":"PEAK","startHour":13,"endHour":24,"rateCents":47.67}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.8},{"plan_id":"energy-locals-retail-lcl986536mbe1eme-electricity","cdr_plan_id":"LCL986536MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.18,"supply_charge_cents_per_day":170.91},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":4.5,"annual_cost_estimates":{"at_3000_kwh":1769.22,"at_4000_kwh":2151.02,"at_5000_kwh":2532.82,"at_8000_kwh":3678.22},"marginal_rates":{"excess_unit_cost_cents":38.18,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986536mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986536MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 0-5kWh/day","type":"single","rate_cents_per_kwh":4.5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 2025: Stepped Rate Feed In Tariff","description":"Retailer feed-in tariff (incl. GST, if any) | 5kWh+/day","type":"single","rate_cents_per_kwh":1.5}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.5},{"plan_id":"momentum-mom921309mbe3eme-electricity","cdr_plan_id":"MOM921309MBE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Bill Boss Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":226.7,"peak_cents_per_kwh":40.1,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1820.46,"at_4000_kwh":2151.46,"at_5000_kwh":2482.46,"at_8000_kwh":3475.46},"marginal_rates":{"excess_unit_cost_cents":40.1,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921309mbe3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921309MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, sign up via our third party sales channels or call Momentum directly, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.1},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":40.1},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.1}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.5},{"plan_id":"diamond-dia933988mbe3eme-electricity","cdr_plan_id":"DIA933988MBE3@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.57,"supply_charge_cents_per_day":90.15},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1696.15,"at_4000_kwh":2151.85,"at_5000_kwh":2607.55,"at_8000_kwh":3974.65},"marginal_rates":{"excess_unit_cost_cents":45.57,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia933988mbe3eme-electricity&source=ai","last_verified":"2025-10-24","source_doc":"CDR EnergyPlanDetailV3 DIA933988MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For full terms & conditions and solar feed in tariff eligibility, visit our website www.diamondenergy.com.au.","variation":"We may vary the Charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.5},{"plan_id":"diamond-dia786923mbe5eme-electricity","cdr_plan_id":"DIA786923MBE5@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.57,"supply_charge_cents_per_day":90.15},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1696.15,"at_4000_kwh":2151.85,"at_5000_kwh":2607.55,"at_8000_kwh":3974.65},"marginal_rates":{"excess_unit_cost_cents":45.57,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia786923mbe5eme-electricity&source=ai","last_verified":"2025-10-24","source_doc":"CDR EnergyPlanDetailV3 DIA786923MBE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For full terms & conditions and solar feed in tariff eligibility, visit our website www.diamondenergy.com.au.","variation":"We may vary the Charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.5},{"plan_id":"1st-energy-1st1042496mbe1eme-electricity","cdr_plan_id":"1ST1042496MBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Ruby - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.4,"supply_charge_cents_per_day":115},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1721.75,"at_4000_kwh":2155.75,"at_5000_kwh":2589.75,"at_8000_kwh":3891.75},"marginal_rates":{"excess_unit_cost_cents":43.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042496mbe1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042496MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.3},{"plan_id":"1st-energy-1st1042497mbe1eme-electricity","cdr_plan_id":"1ST1042497MBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"1st Ruby - Single Rate + Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.4,"supply_charge_cents_per_day":115},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1721.75,"at_4000_kwh":2155.75,"at_5000_kwh":2589.75,"at_8000_kwh":3891.75},"marginal_rates":{"excess_unit_cost_cents":43.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st1042497mbe1eme-electricity&source=ai","last_verified":"2026-04-07","source_doc":"CDR EnergyPlanDetailV3 1ST1042497MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6.3},{"plan_id":"energy-locals-retail-lcl986598mbe1eme-electricity","cdr_plan_id":"LCL986598MBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Business Classic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":155.91,"peak_cents_per_kwh":55.45,"off_peak_cents_per_kwh":30.91,"shoulder_cents_per_kwh":38.64,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 10am-3:59pm mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-4:59pm sat, sun; 9pm-11:59pm sat, sun","shoulder_hours":"7am-9:59am mon, tue, wed, thu, fri; 4pm-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1763.61,"at_4000_kwh":2161.79,"at_5000_kwh":2559.97,"at_8000_kwh":3754.51},"marginal_rates":{"excess_unit_cost_cents":55.45,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl986598mbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL986598MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Peak - Everyday 4pm - 9pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":15,"hours":"4pm-8:59pm","startHour":16,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Off-Peak - Everyday 9pm - 10am","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":21,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":5,"hours":"9pm-9:59am","startHour":0,"endHour":10}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Time of Use Solar: Time of Use Feed In Tariff","description":"Shoulder - Everyday 10am - 4pm","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged per paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend Credit","description":"$50 credit on your and your friends accounts, if you sign up using a Refer a Friend link from an existing Energy Locals customer. T&Cs apply, refer to https://energylocals.com.au/terms-and-conditions-refer-a-friend. This offer can be withdrawn anytime at the discretion of Energy Locals."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"10% Greenpower option","tiers":[{"percentGreen":10,"amount":"0.00485"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"50% Greenpower option","tiers":[{"percentGreen":50,"amount":"0.02425"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% Greenpower option","tiers":[{"percentGreen":100,"amount":"0.0485"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.91},{"type":"SHOULDER","startHour":7,"endHour":10,"rateCents":38.64},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":30.91},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":38.64},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55.45},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.91}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.91},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55.45},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.91}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":6},{"plan_id":"red-energy-red552470mbe13eme-electricity","cdr_plan_id":"RED552470MBE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Plus","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.3,"supply_charge_cents_per_day":130},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1743.5,"at_4000_kwh":2166.5,"at_5000_kwh":2589.5,"at_8000_kwh":3858.5},"marginal_rates":{"excess_unit_cost_cents":42.3,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552470mbe13eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552470MBE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 15,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":5.8},{"plan_id":"red-energy-red552485mbe14eme-electricity","cdr_plan_id":"RED552485MBE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Plus","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.3,"supply_charge_cents_per_day":130},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1743.5,"at_4000_kwh":2166.5,"at_5000_kwh":2589.5,"at_8000_kwh":3858.5},"marginal_rates":{"excess_unit_cost_cents":42.3,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552485mbe14eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552485MBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 15,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":5.8},{"plan_id":"red-energy-red552210mbe12eme-electricity","cdr_plan_id":"RED552210MBE12@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Business Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.3,"supply_charge_cents_per_day":130},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1743.5,"at_4000_kwh":2166.5,"at_5000_kwh":2589.5,"at_8000_kwh":3858.5},"marginal_rates":{"excess_unit_cost_cents":42.3,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552210mbe12eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552210MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":5.8},{"plan_id":"red-energy-red552213mbe13eme-electricity","cdr_plan_id":"RED552213MBE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Business Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.3,"supply_charge_cents_per_day":130},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1743.5,"at_4000_kwh":2166.5,"at_5000_kwh":2589.5,"at_8000_kwh":3858.5},"marginal_rates":{"excess_unit_cost_cents":42.3,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552213mbe13eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552213MBE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":5.8},{"plan_id":"red-energy-red552600mbe13eme-electricity","cdr_plan_id":"RED552600MBE13@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.3,"supply_charge_cents_per_day":130},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1743.5,"at_4000_kwh":2166.5,"at_5000_kwh":2589.5,"at_8000_kwh":3858.5},"marginal_rates":{"excess_unit_cost_cents":42.3,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552600mbe13eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552600MBE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":5.8},{"plan_id":"red-energy-red552596mbe14eme-electricity","cdr_plan_id":"RED552596MBE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Saver","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.3,"supply_charge_cents_per_day":130},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1743.5,"at_4000_kwh":2166.5,"at_5000_kwh":2589.5,"at_8000_kwh":3858.5},"marginal_rates":{"excess_unit_cost_cents":42.3,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552596mbe14eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552596MBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":5.8},{"plan_id":"origin-ori729784mbe8eme-electricity","cdr_plan_id":"ORI729784MBE8@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Solar Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.36,"supply_charge_cents_per_day":109.41},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1730.15,"at_4000_kwh":2173.75,"at_5000_kwh":2617.35,"at_8000_kwh":3948.15},"marginal_rates":{"excess_unit_cost_cents":44.36,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori729784mbe8eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI729784MBE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 5 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh).","type":"single","rate_cents_per_kwh":5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":5.5},{"plan_id":"origin-ori729837mbe8eme-electricity","cdr_plan_id":"ORI729837MBE8@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Solar Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.36,"supply_charge_cents_per_day":109.41},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1730.15,"at_4000_kwh":2173.75,"at_5000_kwh":2617.35,"at_8000_kwh":3948.15},"marginal_rates":{"excess_unit_cost_cents":44.36,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori729837mbe8eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI729837MBE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 5 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh).","type":"single","rate_cents_per_kwh":5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":5.5},{"plan_id":"globird-glo1054012mre1eme-electricity","cdr_plan_id":"GLO1054012MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"ULTRASAVE Residential (Flat Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.6,"supply_charge_cents_per_day":119,"block_rates":[{"volume_kwh":15,"rate_cents_per_kwh":43.6},{"volume_kwh":null,"rate_cents_per_kwh":46.6}]},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1742.35,"at_4000_kwh":2178.35,"at_5000_kwh":2614.35,"at_8000_kwh":3998.1},"marginal_rates":{"excess_unit_cost_cents":43.6,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054012mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054012MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar feed-in (inc. GST if any).","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers without an eligible smart meter and with an applicable network tariff. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456. Note, step 1 is calculated by multiplying the daily allowance by the number of days in the billing period. For example, a daily allowance of 25kWh/day and a 30-day billing period has a step 1 of 750kWh, or a 31-day 775kWh.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":5.3},{"plan_id":"globird-glo1054011mre1eme-electricity","cdr_plan_id":"GLO1054011MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"ULTRASAVE Residential (Flat Rate CTL Load)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.6,"supply_charge_cents_per_day":119,"block_rates":[{"volume_kwh":15,"rate_cents_per_kwh":43.6},{"volume_kwh":null,"rate_cents_per_kwh":46.6}]},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1742.35,"at_4000_kwh":2178.35,"at_5000_kwh":2614.35,"at_8000_kwh":3998.1},"marginal_rates":{"excess_unit_cost_cents":43.6,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054011mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054011MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Stepped Rate Solar FiT","description":"GloBird Retailer Feed-in-Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.00 cents per kWh solar feed-in (inc. GST if any).","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is for SA residential customers without an eligible smart meter and with an applicable network tariff. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456. Note, step 1 is calculated by multiplying the daily allowance by the number of days in the billing period. For example, a daily allowance of 25kWh/day and a 30-day billing period has a step 1 of 750kWh, or a 31-day 775kWh.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":5.3},{"plan_id":"tango-tan918717mbe1eme-electricity","cdr_plan_id":"TAN918717MBE1@EME","retailer":"Tango Energy","retailer_slug":"tango","retailer_logo_uri":"https://www.tangoenergy.com/sites/default/files/2022-08/Default-Logo-Tango.png","plan_name":"Business Select","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.14,"supply_charge_cents_per_day":119},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1758.55,"at_4000_kwh":2199.95,"at_5000_kwh":2641.35,"at_8000_kwh":3965.55},"marginal_rates":{"excess_unit_cost_cents":44.14,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=tango-tan918717mbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 TAN918717MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Distributor feed-in tariff: Single Rate Solar FiT","description":"Distributor feed-in tariff | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer FIT: Single Rate Solar FiT","description":"Voluntary | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"This contract is ongoing and may be terminated by you or us in accordance with the terms of our Market Agreement. The full terms and conditions applicable to this offer are available at http://tangoenergy.com/terms-and-conditions. For further information about this offer, our market terms or solar feed-in eligibility, call Tango Energy on 1800 010 648.","variation":"Prices are variable and may be varied by notice to you. We will provide you with information about any variations to your prices in accordance with Energy Laws. A network tariff code change may be required if you have a solar system installed.","onExpiryDescription":"Our market agreement is ongoing and may be ended by you or us in accordance with the terms of our agreement.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Usage aggregated according to Australian Eastern Standard Time (AEST). Your usage may be adjusted for local time (Australian Daylight Savings Time). Further information on our charges is available at: http://tangoenergy.com/additional-charges","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"For payments made by MasterCard or Visa where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CC_PROCESSING","amount":"0.0075","description":"For payments made by AMEX or any other payment where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.0075"},{"type":"OTHER","amount":"7.5","description":"This fee will apply if a direct debit, credit card or cheque payment is dishonoured or reversed.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with a basic meter with the power off. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving out and disconnecting with a smart meter or a basic meter. Does not apply to customers switching to another retailer at the same supply address.","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with smart meter or basic meter with the power on. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.3","description":"Paper bill fee $3.30 (inc. GST) for each paper bill.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":4.4},{"plan_id":"tango-tan918716mbe1eme-electricity","cdr_plan_id":"TAN918716MBE1@EME","retailer":"Tango Energy","retailer_slug":"tango","retailer_logo_uri":"https://www.tangoenergy.com/sites/default/files/2022-08/Default-Logo-Tango.png","plan_name":"Business Select","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.14,"supply_charge_cents_per_day":119},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1758.55,"at_4000_kwh":2199.95,"at_5000_kwh":2641.35,"at_8000_kwh":3965.55},"marginal_rates":{"excess_unit_cost_cents":44.14,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=tango-tan918716mbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 TAN918716MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Distributor feed-in tariff: Single Rate Solar FiT","description":"Distributor feed-in tariff | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer FIT: Single Rate Solar FiT","description":"Voluntary | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"This contract is ongoing and may be terminated by you or us in accordance with the terms of our Market Agreement. The full terms and conditions applicable to this offer are available at http://tangoenergy.com/terms-and-conditions. For further information about this offer, our market terms or solar feed-in eligibility, call Tango Energy on 1800 010 648.","variation":"Prices are variable and may be varied by notice to you. We will provide you with information about any variations to your prices in accordance with Energy Laws. A network tariff code change may be required if you have a solar system installed.","onExpiryDescription":"Our market agreement is ongoing and may be ended by you or us in accordance with the terms of our agreement.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Usage aggregated according to Australian Eastern Standard Time (AEST). Your usage may be adjusted for local time (Australian Daylight Savings Time). Further information on our charges is available at: http://tangoenergy.com/additional-charges","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"For payments made by MasterCard or Visa where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CC_PROCESSING","amount":"0.0075","description":"For payments made by AMEX or any other payment where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.0075"},{"type":"OTHER","amount":"7.5","description":"This fee will apply if a direct debit, credit card or cheque payment is dishonoured or reversed.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with a basic meter with the power off. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving out and disconnecting with a smart meter or a basic meter. Does not apply to customers switching to another retailer at the same supply address.","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with smart meter or basic meter with the power on. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.3","description":"Paper bill fee $3.30 (inc. GST) for each paper bill.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":4.4},{"plan_id":"tango-tan918719mbe1eme-electricity","cdr_plan_id":"TAN918719MBE1@EME","retailer":"Tango Energy","retailer_slug":"tango","retailer_logo_uri":"https://www.tangoenergy.com/sites/default/files/2022-08/Default-Logo-Tango.png","plan_name":"Business Select","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":119,"peak_cents_per_kwh":54,"off_peak_cents_per_kwh":40,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1760.35,"at_4000_kwh":2202.35,"at_5000_kwh":2644.35,"at_8000_kwh":3970.35},"marginal_rates":{"excess_unit_cost_cents":54,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=tango-tan918719mbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 TAN918719MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Distributor feed-in tariff: Single Rate Solar FiT","description":"Distributor feed-in tariff | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer FIT: Single Rate Solar FiT","description":"Voluntary | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"This contract is ongoing and may be terminated by you or us in accordance with the terms of our Market Agreement. The full terms and conditions applicable to this offer are available at http://tangoenergy.com/terms-and-conditions. For further information about this offer, our market terms or solar feed-in eligibility, call Tango Energy on 1800 010 648.","variation":"Prices are variable and may be varied by notice to you. We will provide you with information about any variations to your prices in accordance with Energy Laws. A network tariff code change may be required if you have a solar system installed.","onExpiryDescription":"Our market agreement is ongoing and may be ended by you or us in accordance with the terms of our agreement.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Usage aggregated according to Australian Eastern Standard Time (AEST). Your usage may be adjusted for local time (Australian Daylight Savings Time). Further information on our charges is available at: http://tangoenergy.com/additional-charges","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"For payments made by MasterCard or Visa where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CC_PROCESSING","amount":"0.0075","description":"For payments made by AMEX or any other payment where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.0075"},{"type":"OTHER","amount":"7.5","description":"This fee will apply if a direct debit, credit card or cheque payment is dishonoured or reversed.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with a basic meter with the power off. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving out and disconnecting with a smart meter or a basic meter. Does not apply to customers switching to another retailer at the same supply address.","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with smart meter or basic meter with the power on. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.3","description":"Paper bill fee $3.30 (inc. GST) for each paper bill.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":54},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":40}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":4.3},{"plan_id":"tango-tan918720mbe1eme-electricity","cdr_plan_id":"TAN918720MBE1@EME","retailer":"Tango Energy","retailer_slug":"tango","retailer_logo_uri":"https://www.tangoenergy.com/sites/default/files/2022-08/Default-Logo-Tango.png","plan_name":"Business Select","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":119,"peak_cents_per_kwh":54,"off_peak_cents_per_kwh":40,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1760.35,"at_4000_kwh":2202.35,"at_5000_kwh":2644.35,"at_8000_kwh":3970.35},"marginal_rates":{"excess_unit_cost_cents":54,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=tango-tan918720mbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 TAN918720MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Distributor feed-in tariff: Single Rate Solar FiT","description":"Distributor feed-in tariff | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Retailer FIT: Single Rate Solar FiT","description":"Voluntary | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"This contract is ongoing and may be terminated by you or us in accordance with the terms of our Market Agreement. The full terms and conditions applicable to this offer are available at http://tangoenergy.com/terms-and-conditions. For further information about this offer, our market terms or solar feed-in eligibility, call Tango Energy on 1800 010 648.","variation":"Prices are variable and may be varied by notice to you. We will provide you with information about any variations to your prices in accordance with Energy Laws. A network tariff code change may be required if you have a solar system installed.","onExpiryDescription":"Our market agreement is ongoing and may be ended by you or us in accordance with the terms of our agreement.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Usage aggregated according to Australian Eastern Standard Time (AEST). Your usage may be adjusted for local time (Australian Daylight Savings Time). Further information on our charges is available at: http://tangoenergy.com/additional-charges","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"For payments made by MasterCard or Visa where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CC_PROCESSING","amount":"0.0075","description":"For payments made by AMEX or any other payment where we incur a merchant services fee. Not applicable to direct debit payments by credit card or debit card.","term":"PERCENT_OF_BILL","rate":"0.0075"},{"type":"OTHER","amount":"7.5","description":"This fee will apply if a direct debit, credit card or cheque payment is dishonoured or reversed.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with a basic meter with the power off. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving out and disconnecting with a smart meter or a basic meter. Does not apply to customers switching to another retailer at the same supply address.","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"Standard rates apply during business hours. Fees may vary and will be quoted on request. Applies to customers moving into premises with smart meter or basic meter with the power on. Does not apply to customers switching from another retailer at the same supply address.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.3","description":"Paper bill fee $3.30 (inc. GST) for each paper bill.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":54},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":40}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":4.3},{"plan_id":"alinta-ali1018942mre1eme-electricity","cdr_plan_id":"ALI1018942MRE1@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Edge - Demand Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48,"supply_charge_cents_per_day":79.71},"demand_charges":[{"display_name":"Demand Summer (c/kW/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":42.19,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Non-Summer (c/kW/day)","description":"April to October, Mon-Fri","amount_cents_per_kw":20.84,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1730.94,"at_4000_kwh":2210.94,"at_5000_kwh":2690.94,"at_8000_kwh":4130.94},"marginal_rates":{"excess_unit_cost_cents":48,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1018942mre1eme-electricity&source=ai","last_verified":"2025-11-13","source_doc":"CDR EnergyPlanDetailV3 ALI1018942MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3.9},{"plan_id":"alinta-ali1018938mre1eme-electricity","cdr_plan_id":"ALI1018938MRE1@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"HomeDeal Edge - Demand Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48,"supply_charge_cents_per_day":79.71},"demand_charges":[{"display_name":"Demand Summer (c/kW/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":42.19,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Non-Summer (c/kW/day)","description":"April to October, Mon-Fri","amount_cents_per_kw":20.84,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1730.94,"at_4000_kwh":2210.94,"at_5000_kwh":2690.94,"at_8000_kwh":4130.94},"marginal_rates":{"excess_unit_cost_cents":48,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali1018938mre1eme-electricity&source=ai","last_verified":"2025-11-13","source_doc":"CDR EnergyPlanDetailV3 ALI1018938MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3.9},{"plan_id":"agl-agl737886sbe9eme-electricity","cdr_plan_id":"AGL737886SBE9@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Standing Offer (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":138.45,"peak_cents_per_kwh":52.52,"off_peak_cents_per_kwh":36.31,"shoulder_cents_per_kwh":44.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1789.19,"at_4000_kwh":2217.14,"at_5000_kwh":2645.09,"at_8000_kwh":3928.94},"marginal_rates":{"excess_unit_cost_cents":52.52,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl737886sbe9eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL737886SBE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.31},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":44.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":52.52},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":36.31},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":52.52},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.31}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.31},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":44.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3.6},{"plan_id":"agl-agl205695sbe30eme-electricity","cdr_plan_id":"AGL205695SBE30@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Standing Offer (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":138.45,"peak_cents_per_kwh":52.52,"off_peak_cents_per_kwh":36.31,"shoulder_cents_per_kwh":44.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1789.19,"at_4000_kwh":2217.14,"at_5000_kwh":2645.09,"at_8000_kwh":3928.94},"marginal_rates":{"excess_unit_cost_cents":52.52,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl205695sbe30eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL205695SBE30@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.31},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":44.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":52.52},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":36.31},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":52.52},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.31}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.31},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":44.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3.6},{"plan_id":"agl-agl205699sbe30eme-electricity","cdr_plan_id":"AGL205699SBE30@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Standing Offer (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":138.45,"peak_cents_per_kwh":52.52,"off_peak_cents_per_kwh":36.31,"shoulder_cents_per_kwh":44.42,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1789.19,"at_4000_kwh":2217.14,"at_5000_kwh":2645.09,"at_8000_kwh":3928.94},"marginal_rates":{"excess_unit_cost_cents":52.52,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl205699sbe30eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL205699SBE30@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.31},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":44.42},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":52.52},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":36.31},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":52.52},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.31}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.31},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":44.42},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3.6},{"plan_id":"alinta-ali463781mbe12eme-electricity","cdr_plan_id":"ALI463781MBE12@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"BusinessDeal On - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.21,"supply_charge_cents_per_day":113.75,"block_rates":[{"volume_kwh":27.3973,"rate_cents_per_kwh":45.21},{"volume_kwh":null,"rate_cents_per_kwh":45.21}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1771.49,"at_4000_kwh":2223.59,"at_5000_kwh":2675.69,"at_8000_kwh":4031.99},"marginal_rates":{"excess_unit_cost_cents":45.21,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali463781mbe12eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI463781MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3.4},{"plan_id":"alinta-ali463782mbe12eme-electricity","cdr_plan_id":"ALI463782MBE12@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"BusinessDeal On - Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.21,"supply_charge_cents_per_day":113.75,"block_rates":[{"volume_kwh":27.3973,"rate_cents_per_kwh":45.21},{"volume_kwh":null,"rate_cents_per_kwh":45.21}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1771.49,"at_4000_kwh":2223.59,"at_5000_kwh":2675.69,"at_8000_kwh":4031.99},"marginal_rates":{"excess_unit_cost_cents":45.21,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali463782mbe12eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI463782MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3.4},{"plan_id":"radian-ior1009973mbe1eme-electricity","cdr_plan_id":"IOR1009973MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Smart Business: SBELE","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":181.82,"peak_cents_per_kwh":77.27,"off_peak_cents_per_kwh":18.18,"shoulder_cents_per_kwh":33.64,"peak_hours":"Non-winter months: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun · Winter months: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun; 6am-8:59am mon, tue, wed, thu, fri","off_peak_hours":"Non-winter months: 10am-3:59pm mon, tue, wed, thu, fri, sat, sun · Winter months: 10am-3:59pm sat, sun","shoulder_hours":"Non-winter months: 12am-9:59am mon, tue, wed, thu, fri, sat, sun; 4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun · Winter months: 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-5:59am mon, tue, wed, thu, fri; 9am-4:59pm mon, tue, wed, thu, fri; 12am-9:59am sat, sun; 4pm-4:59pm sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1833.61,"at_4000_kwh":2223.6,"at_5000_kwh":2613.59,"at_8000_kwh":3783.56},"marginal_rates":{"excess_unit_cost_cents":77.27,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009973mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009973MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Off-peak","description":"Daytime Usage - Everyday - 10:00am–3:59pm","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":-2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Peak","description":"Evening Usage - Everyday - 6:00pm–8:59pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":18,"hours":"6pm-8:59pm","startHour":18,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Shoulder","description":"Other Usage - Everyday - All other times","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":0,"endHour":10},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":16,"endHour":18},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":21,"endHour":24}]}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"Non-winter months (1 Sep – 30 Apr)","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":33.64},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":18.18},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":33.64},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":77.27},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":33.64}]}]},{"season":"Winter months (1 May – 31 Aug)","rows":[{"label":"Weekdays","segments":[{"type":"SHOULDER","startHour":0,"endHour":6,"rateCents":33.64},{"type":"PEAK","startHour":6,"endHour":9,"rateCents":77.27},{"type":"SHOULDER","startHour":9,"endHour":17,"rateCents":33.64},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":77.27},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":33.64}]},{"label":"Weekends & public holidays","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":33.64},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":18.18},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":33.64},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":77.27},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":33.64}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3.4},{"plan_id":"diamond-dia933998sbe2eme-electricity","cdr_plan_id":"DIA933998SBE2@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Standing Two Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.81,"supply_charge_cents_per_day":97.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1760.18,"at_4000_kwh":2228.28,"at_5000_kwh":2696.38,"at_8000_kwh":4100.68},"marginal_rates":{"excess_unit_cost_cents":46.81,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia933998sbe2eme-electricity&source=ai","last_verified":"2025-10-24","source_doc":"CDR EnergyPlanDetailV3 DIA933998SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms & conditions, visit our website www.diamondenergy.com.au or contact us on 1300 838 009.","variation":"Variations to energy rates will be published on our website at least 10 business days prior to commencement and we'll provide written notice at least 5 days prior to commencement. Standing offer prices will not be varied more often than once every 6 months. Other charges may be varied with notice.","onExpiryDescription":"No fixed term. This agreement continues on a rolling monthly or quarterly basis as per the bill frequency","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply including such items as meter special reads, meter installation, meter reconfiguration, energisation and de-energisation, see our website or contact us for details.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3.2},{"plan_id":"diamond-dia786901sbe3eme-electricity","cdr_plan_id":"DIA786901SBE3@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Standing Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.81,"supply_charge_cents_per_day":97.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1760.18,"at_4000_kwh":2228.28,"at_5000_kwh":2696.38,"at_8000_kwh":4100.68},"marginal_rates":{"excess_unit_cost_cents":46.81,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia786901sbe3eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 DIA786901SBE3@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"For full terms & conditions, visit our website www.diamondenergy.com.au or contact us on 1300 838 009.","variation":"Variations to energy rates will be published on our website at least 10 business days prior to commencement and we'll provide written notice at least 5 days prior to commencement. Standing offer prices will not be varied more often than once every 6 months. Other charges may be varied with notice.","onExpiryDescription":"No fixed term. This agreement continues on a rolling monthly or quarterly basis as per the bill frequency","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply including such items as meter special reads, meter installation, meter reconfiguration, energisation and de-energisation, see our website or contact us for details.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3.2},{"plan_id":"globird-glo964321sre1eme-electricity","cdr_plan_id":"GLO964321SRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"Resi Standing Offer Prices (Flex Rate RELE CTL)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":155,"peak_cents_per_kwh":75.8,"off_peak_cents_per_kwh":27,"shoulder_cents_per_kwh":27,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1814.95,"at_4000_kwh":2231.35,"at_5000_kwh":2647.75,"at_8000_kwh":3896.95},"marginal_rates":{"excess_unit_cost_cents":75.8,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo964321sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 GLO964321SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 0.00 cents per kWh solar feed-in (inc. GST if any).","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.0000 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"For further information about this offer call GloBird on 133456 or visit www.globirdenergy.com.au or see our full terms and conditions here: www.globirdenergy.com.au/legal/","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","onExpiryDescription":"You will be notified of a new plan 1 month before the expiry date","billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"CONNECTION","amount":"70.00","description":"Min connection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"70.00","description":"Min disconnection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":27},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":27},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":27},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":75.8},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":27}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"globird-glo964320sre1eme-electricity","cdr_plan_id":"GLO964320SRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"Resi Standing Offer Prices (Flex Rate RELE)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":155,"peak_cents_per_kwh":75.8,"off_peak_cents_per_kwh":27,"shoulder_cents_per_kwh":27,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"10am-3:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"4pm-4:59pm mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-9:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1814.95,"at_4000_kwh":2231.35,"at_5000_kwh":2647.75,"at_8000_kwh":3896.95},"marginal_rates":{"excess_unit_cost_cents":75.8,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo964320sre1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 GLO964320SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 0.00 cents per kWh solar feed-in (inc. GST if any).","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"GloBird currently pay 44.0000 cents per kWh solar premium feed-in.","type":"single","rate_cents_per_kwh":44}],"terms":"For further information about this offer call GloBird on 133456 or visit www.globirdenergy.com.au or see our full terms and conditions here: www.globirdenergy.com.au/legal/","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","onExpiryDescription":"You will be notified of a new plan 1 month before the expiry date","billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"CONNECTION","amount":"70.00","description":"Min connection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"70.00","description":"Min disconnection fee $70 inc GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":10,"rateCents":27},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":27},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":27},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":75.8},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":27}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"engie-eng1048443mbe1eme-electricity","cdr_plan_id":"ENG1048443MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Business GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":59.94,"off_peak_cents_per_kwh":36.41,"shoulder_cents_per_kwh":45.59,"peak_hours":"Summer Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter Shoulder: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer Peak: 7am-4:59pm mon, tue, wed, thu, fri · Winter Shoulder: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1778.32,"at_4000_kwh":2231.37,"at_5000_kwh":2684.42,"at_8000_kwh":4043.57},"marginal_rates":{"excess_unit_cost_cents":59.94,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048443mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048443MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_DAY","description":"To participate in the GreenPower accredited program a daily charge of $1.50 (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.5"}]}],"touSchedule":[{"season":"Summer Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":45.59},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":36.41},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]}]},{"season":"Winter Shoulder (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":45.59},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.41}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"engie-eng1048980mbe1eme-electricity","cdr_plan_id":"ENG1048980MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Business Flyer Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":59.94,"off_peak_cents_per_kwh":36.41,"shoulder_cents_per_kwh":45.59,"peak_hours":"Summer Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter Shoulder: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer Peak: 7am-4:59pm mon, tue, wed, thu, fri · Winter Shoulder: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1778.32,"at_4000_kwh":2231.37,"at_5000_kwh":2684.42,"at_8000_kwh":4043.57},"marginal_rates":{"excess_unit_cost_cents":59.94,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Virgin Australia BusinessFlyer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048980mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048980MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Velocity Points","description":"You'll receive an upfront bonus of 15,000 Velocity Points, and then you'll receive 3 Velocity Points for every $1 you pay for electricity."}],"touSchedule":[{"season":"Summer Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":45.59},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":36.41},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]}]},{"season":"Winter Shoulder (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":45.59},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.41}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"engie-eng1048194mbe1eme-electricity","cdr_plan_id":"ENG1048194MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Business GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":59.94,"off_peak_cents_per_kwh":36.41,"shoulder_cents_per_kwh":45.59,"peak_hours":"Summer Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter Shoulder: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer Peak: 7am-4:59pm mon, tue, wed, thu, fri · Winter Shoulder: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1778.32,"at_4000_kwh":2231.37,"at_5000_kwh":2684.42,"at_8000_kwh":4043.57},"marginal_rates":{"excess_unit_cost_cents":59.94,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048194mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048194MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_DAY","description":"To participate in the GreenPower accredited program a daily charge of $1.50 (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.5"}]}],"touSchedule":[{"season":"Summer Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":45.59},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":36.41},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]}]},{"season":"Winter Shoulder (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":45.59},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.41}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"engie-eng1049239mbe1eme-electricity","cdr_plan_id":"ENG1049239MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":59.94,"off_peak_cents_per_kwh":36.41,"shoulder_cents_per_kwh":45.59,"peak_hours":"Summer Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter Shoulder: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer Peak: 7am-4:59pm mon, tue, wed, thu, fri · Winter Shoulder: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1778.32,"at_4000_kwh":2231.37,"at_5000_kwh":2684.42,"at_8000_kwh":4043.57},"marginal_rates":{"excess_unit_cost_cents":59.94,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049239mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049239MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}],"touSchedule":[{"season":"Summer Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":45.59},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":36.41},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]}]},{"season":"Winter Shoulder (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":45.59},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.41}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"engie-eng1048628mbe1eme-electricity","cdr_plan_id":"ENG1048628MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":59.94,"off_peak_cents_per_kwh":36.41,"shoulder_cents_per_kwh":45.59,"peak_hours":"Summer Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter Shoulder: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer Peak: 7am-4:59pm mon, tue, wed, thu, fri · Winter Shoulder: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1778.32,"at_4000_kwh":2231.37,"at_5000_kwh":2684.42,"at_8000_kwh":4043.57},"marginal_rates":{"excess_unit_cost_cents":59.94,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048628mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048628MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"touSchedule":[{"season":"Summer Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":45.59},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":36.41},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]}]},{"season":"Winter Shoulder (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":45.59},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.41}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"engie-eng937954sbe4eme-electricity","cdr_plan_id":"ENG937954SBE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.84,"peak_cents_per_kwh":59.94,"off_peak_cents_per_kwh":36.41,"shoulder_cents_per_kwh":45.59,"peak_hours":"Summer Peak: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer Peak: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter Shoulder: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer Peak: 7am-4:59pm mon, tue, wed, thu, fri · Winter Shoulder: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1778.32,"at_4000_kwh":2231.37,"at_5000_kwh":2684.42,"at_8000_kwh":4043.57},"marginal_rates":{"excess_unit_cost_cents":59.94,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng937954sbe4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG937954SBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}],"touSchedule":[{"season":"Summer Peak (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":45.59},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":36.41},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.94},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]}]},{"season":"Winter Shoulder (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.41},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":45.59},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.41}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.41}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"covau-cov1042146mbe1eme-electricity","cdr_plan_id":"COV1042146MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business TOU 5-Day CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":98,"peak_cents_per_kwh":61.14,"off_peak_cents_per_kwh":40.75,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1763.71,"at_4000_kwh":2232.38,"at_5000_kwh":2701.05,"at_8000_kwh":4107.06},"marginal_rates":{"excess_unit_cost_cents":61.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1042146mbe1eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 COV1042146MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40.75},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":61.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40.75}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":40.75}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"covau-cov1042145mbe1eme-electricity","cdr_plan_id":"COV1042145MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business TOU 5-Day","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":98,"peak_cents_per_kwh":61.14,"off_peak_cents_per_kwh":40.75,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1763.71,"at_4000_kwh":2232.38,"at_5000_kwh":2701.05,"at_8000_kwh":4107.06},"marginal_rates":{"excess_unit_cost_cents":61.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1042145mbe1eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 COV1042145MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40.75},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":61.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40.75}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":40.75}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"covau-cov1041709mbe1eme-electricity","cdr_plan_id":"COV1041709MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business TOU 5-Day","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":98,"peak_cents_per_kwh":61.14,"off_peak_cents_per_kwh":40.75,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1763.71,"at_4000_kwh":2232.38,"at_5000_kwh":2701.05,"at_8000_kwh":4107.06},"marginal_rates":{"excess_unit_cost_cents":61.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1041709mbe1eme-electricity&source=ai","last_verified":"2026-03-13","source_doc":"CDR EnergyPlanDetailV3 COV1041709MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 1.65c /kWh inc. GST we ensure energy equal to 30% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":30,"amount":"0.0165"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40.75},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":61.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40.75}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":40.75}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"covau-cov1041710mbe1eme-electricity","cdr_plan_id":"COV1041710MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business TOU 5-Day CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":98,"peak_cents_per_kwh":61.14,"off_peak_cents_per_kwh":40.75,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1763.71,"at_4000_kwh":2232.38,"at_5000_kwh":2701.05,"at_8000_kwh":4107.06},"marginal_rates":{"excess_unit_cost_cents":61.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1041710mbe1eme-electricity&source=ai","last_verified":"2026-03-13","source_doc":"CDR EnergyPlanDetailV3 COV1041710MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 1.65c /kWh inc. GST we ensure energy equal to 30% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":30,"amount":"0.0165"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40.75},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":61.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40.75}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":40.75}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"alinta-ali13174sre18eme-electricity","cdr_plan_id":"ALI13174SRE18@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"Standing Offer - Demand Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48.48,"supply_charge_cents_per_day":80.52},"demand_charges":[{"display_name":"Demand Summer (c/kW/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":42.19,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Non-Summer (c/kW/day)","description":"April to October, Mon-Fri","amount_cents_per_kw":20.84,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1748.3,"at_4000_kwh":2233.1,"at_5000_kwh":2717.9,"at_8000_kwh":4172.3},"marginal_rates":{"excess_unit_cost_cents":48.48,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali13174sre18eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI13174SRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"alinta-ali13172sre17eme-electricity","cdr_plan_id":"ALI13172SRE17@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"Standing Offer - Demand Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48.48,"supply_charge_cents_per_day":80.52},"demand_charges":[{"display_name":"Demand Summer (c/kW/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":42.19,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Non-Summer (c/kW/day)","description":"April to October, Mon-Fri","amount_cents_per_kw":20.84,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1748.3,"at_4000_kwh":2233.1,"at_5000_kwh":2717.9,"at_8000_kwh":4172.3},"marginal_rates":{"excess_unit_cost_cents":48.48,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali13172sre17eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI13172SRE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"alinta-ali875574mre5eme-electricity","cdr_plan_id":"ALI875574MRE5@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SolarBalance Go - Demand Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48.48,"supply_charge_cents_per_day":80.52},"demand_charges":[{"display_name":"Demand Summer (c/kW/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":42.19,"start_time":"4pm","end_time":"8:59pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Non-Summer (c/kW/day)","description":"April to October, Mon-Fri","amount_cents_per_kw":20.84,"start_time":"4pm","end_time":"8:59pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":9,"annual_cost_estimates":{"at_3000_kwh":1748.3,"at_4000_kwh":2233.1,"at_5000_kwh":2717.9,"at_8000_kwh":4172.3},"marginal_rates":{"excess_unit_cost_cents":48.48,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"System Size"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali875574mre5eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI875574MRE5@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Bonus FiT","description":"Solar Balance FiT","type":"single","rate_cents_per_kwh":9},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Stepped FiT","description":"This plan includes a stepped feed-in tariff, where you will receive a feed-in tariff of 9c/kWh for the first 10kW exported. For any export after that you will obtain Alinta Energys standard retailer feed-in tariff."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"alinta-ali875572mre4eme-electricity","cdr_plan_id":"ALI875572MRE4@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SolarBalance Go - Demand Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48.48,"supply_charge_cents_per_day":80.52},"demand_charges":[{"display_name":"Demand Summer (c/kW/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":42.19,"start_time":"4pm","end_time":"8:59pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Non-Summer (c/kW/day)","description":"April to October, Mon-Fri","amount_cents_per_kw":20.84,"start_time":"4pm","end_time":"8:59pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":9,"annual_cost_estimates":{"at_3000_kwh":1748.3,"at_4000_kwh":2233.1,"at_5000_kwh":2717.9,"at_8000_kwh":4172.3},"marginal_rates":{"excess_unit_cost_cents":48.48,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"System Size"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali875572mre4eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI875572MRE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Bonus FiT","description":"Solar Balance FiT","type":"single","rate_cents_per_kwh":9},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 37 02.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY","OTHER"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Stepped FiT","description":"This plan includes a stepped feed-in tariff, where you will receive a feed-in tariff of 9c/kWh for the first 10kW exported. For any export after that you will obtain Alinta Energys standard retailer feed-in tariff."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":3},{"plan_id":"covau-cov1042142mre1eme-electricity","cdr_plan_id":"COV1042142MRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Residential Single + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":47.45,"supply_charge_cents_per_day":91.87},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1758.83,"at_4000_kwh":2233.33,"at_5000_kwh":2707.83,"at_8000_kwh":4131.33},"marginal_rates":{"excess_unit_cost_cents":47.45,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1042142mre1eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 COV1042142MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend","description":"$50 credit applied to you and your friends account if you signup using a Refer a Friend link from an existing CovaU customer. Applies to new customers only who switch their electricity to CovaU. T&Cs apply, refer to https://covau.com.au/refer."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.9},{"plan_id":"covau-cov1042139mre1eme-electricity","cdr_plan_id":"COV1042139MRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Residential Single","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":47.45,"supply_charge_cents_per_day":91.87},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1758.83,"at_4000_kwh":2233.33,"at_5000_kwh":2707.83,"at_8000_kwh":4131.33},"marginal_rates":{"excess_unit_cost_cents":47.45,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1042139mre1eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 COV1042139MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend","description":"$50 credit applied to you and your friends account if you signup using a Refer a Friend link from an existing CovaU customer. Applies to new customers only who switch their electricity to CovaU. T&Cs apply, refer to https://covau.com.au/refer."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.9},{"plan_id":"covau-cov1041703mre1eme-electricity","cdr_plan_id":"COV1041703MRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Residential Single","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":47.45,"supply_charge_cents_per_day":91.87},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1758.83,"at_4000_kwh":2233.33,"at_5000_kwh":2707.83,"at_8000_kwh":4131.33},"marginal_rates":{"excess_unit_cost_cents":47.45,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1041703mre1eme-electricity&source=ai","last_verified":"2026-03-13","source_doc":"CDR EnergyPlanDetailV3 COV1041703MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend","description":"$50 credit applied to you and your friends account if you signup using a Refer a Friend link from an existing CovaU customer. Applies to new customers only who switch their electricity to CovaU. T&Cs apply, refer to https://covau.com.au/refer."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 1.65c /kWh inc. GST we ensure energy equal to 30% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":30,"amount":"0.0165"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.9},{"plan_id":"covau-cov1041706mre1eme-electricity","cdr_plan_id":"COV1041706MRE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Residential Single (RSRCL) CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":47.45,"supply_charge_cents_per_day":91.87},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1758.83,"at_4000_kwh":2233.33,"at_5000_kwh":2707.83,"at_8000_kwh":4131.33},"marginal_rates":{"excess_unit_cost_cents":47.45,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1041706mre1eme-electricity&source=ai","last_verified":"2026-03-13","source_doc":"CDR EnergyPlanDetailV3 COV1041706MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"incentives":[{"category":"OTHER","displayName":"Refer a Friend","description":"$50 credit applied to you and your friends account if you signup using a Refer a Friend link from an existing CovaU customer. Applies to new customers only who switch their electricity to CovaU. T&Cs apply, refer to https://covau.com.au/refer."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 1.65c /kWh inc. GST we ensure energy equal to 30% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":30,"amount":"0.0165"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.9},{"plan_id":"radian-ior1045452sbe1eme-electricity","cdr_plan_id":"IOR1045452SBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Standing Offer - Business  Anytime","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.73,"supply_charge_cents_per_day":100},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1766.9,"at_4000_kwh":2234.2,"at_5000_kwh":2701.5,"at_8000_kwh":4103.4},"marginal_rates":{"excess_unit_cost_cents":46.73,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1045452sbe1eme-electricity&source=ai","last_verified":"2026-04-13","source_doc":"CDR EnergyPlanDetailV3 IOR1045452SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":5}],"terms":"For futher details on the terms and conditions of the offer and other fees and charges, please visit www.ioenergy.com.au or call 1300313463","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, please visit www.ioenergy.com.au or call 1300313463","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post.Includes GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments will incur a 0.46%. Waived for direct debit","term":"PERCENT_OF_BILL","rate":"0.0046"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percent of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.9},{"plan_id":"origin-ori729838mbe9eme-electricity","cdr_plan_id":"ORI729838MBE9@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Solar Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":125,"peak_cents_per_kwh":55.02,"off_peak_cents_per_kwh":37.22,"shoulder_cents_per_kwh":47.67,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1795.75,"at_4000_kwh":2242.25,"at_5000_kwh":2688.75,"at_8000_kwh":4028.25},"marginal_rates":{"excess_unit_cost_cents":55.02,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori729838mbe9eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI729838MBE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 5 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh).","type":"single","rate_cents_per_kwh":5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.22},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":47.67},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55.02},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.22}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.22},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":47.67},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.22}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.6},{"plan_id":"origin-ori729902mbe8eme-electricity","cdr_plan_id":"ORI729902MBE8@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Go Solar Variable","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":125,"peak_cents_per_kwh":55.02,"off_peak_cents_per_kwh":37.22,"shoulder_cents_per_kwh":47.67,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5,"annual_cost_estimates":{"at_3000_kwh":1795.75,"at_4000_kwh":2242.25,"at_5000_kwh":2688.75,"at_8000_kwh":4028.25},"marginal_rates":{"excess_unit_cost_cents":55.02,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori729902mbe8eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI729902MBE8@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 5 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh).","type":"single","rate_cents_per_kwh":5},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.22},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":47.67},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":55.02},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.22}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.22},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":47.67},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.22}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.6},{"plan_id":"energyaustralia-ene32487sbe26eme-electricity","cdr_plan_id":"ENE32487SBE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Standing Offer Business - 5 Day Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":143.3,"peak_cents_per_kwh":57.32,"off_peak_cents_per_kwh":36.85,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1812.78,"at_4000_kwh":2242.69,"at_5000_kwh":2672.6,"at_8000_kwh":3962.33},"marginal_rates":{"excess_unit_cost_cents":57.32,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene32487sbe26eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE32487SBE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","variation":"The rates for Standing Offer Business may vary, either when the AER changes the reference price, or when we review our rates each year. We will notify you before any rate change occurs.","onExpiryDescription":"This contract continues for as long as you remain on the plan.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or Bpay.","fees":[{"type":"LATE_PAYMENT","amount":"10.9","description":"$10.90 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.85},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":57.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.85}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.85}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.5},{"plan_id":"energyaustralia-ene234178mbe26eme-electricity","cdr_plan_id":"ENE234178MBE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Business Rate Fix  - 5 Day Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":143.3,"peak_cents_per_kwh":57.32,"off_peak_cents_per_kwh":36.85,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1812.78,"at_4000_kwh":2242.69,"at_5000_kwh":2672.6,"at_8000_kwh":3962.33},"marginal_rates":{"excess_unit_cost_cents":57.32,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene234178mbe26eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE234178MBE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges.","fees":[{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.85},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":57.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.85}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.85}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.5},{"plan_id":"energyaustralia-ene252026mbe27eme-electricity","cdr_plan_id":"ENE252026MBE27@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Business Balance Plan 12 - 5 Day Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":143.3,"peak_cents_per_kwh":57.32,"off_peak_cents_per_kwh":36.85,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1812.78,"at_4000_kwh":2242.69,"at_5000_kwh":2672.6,"at_8000_kwh":3962.33},"marginal_rates":{"excess_unit_cost_cents":57.32,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene252026mbe27eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE252026MBE27@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges.","fees":[{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.85},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":57.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.85}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.85}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.5},{"plan_id":"alinta-ali463788mbe13eme-electricity","cdr_plan_id":"ALI463788MBE13@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"BusinessDeal On - Time of Use (Interval) + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.1,"peak_cents_per_kwh":64.32,"off_peak_cents_per_kwh":36.86,"shoulder_cents_per_kwh":49.05,"peak_hours":"General Usage: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"General Usage: 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-4:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":"General Usage: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1769.54,"at_4000_kwh":2244.91,"at_5000_kwh":2720.27,"at_8000_kwh":4146.35},"marginal_rates":{"excess_unit_cost_cents":64.32,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali463788mbe13eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI463788MBE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"General Usage (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.05},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":64.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.86},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":36.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":64.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.05},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.86},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.86},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.4},{"plan_id":"alinta-ali463787mbe13eme-electricity","cdr_plan_id":"ALI463787MBE13@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"BusinessDeal On - Time of Use (Interval)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":94.1,"peak_cents_per_kwh":64.32,"off_peak_cents_per_kwh":36.86,"shoulder_cents_per_kwh":49.05,"peak_hours":"General Usage: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"General Usage: 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-4:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":"General Usage: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1769.54,"at_4000_kwh":2244.91,"at_5000_kwh":2720.27,"at_8000_kwh":4146.35},"marginal_rates":{"excess_unit_cost_cents":64.32,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali463787mbe13eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI463787MBE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"General Usage (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.86},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.05},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":64.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.86},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":36.86},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":64.32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.86}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.86},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.05},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.86}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.86},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":36.86},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.86}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.4},{"plan_id":"covau-cov1030374sbe1eme-electricity","cdr_plan_id":"COV1030374SBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"CovaU Basics Business Single + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.4,"supply_charge_cents_per_day":108},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1786.2,"at_4000_kwh":2250.2,"at_5000_kwh":2714.2,"at_8000_kwh":4106.2},"marginal_rates":{"excess_unit_cost_cents":46.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1030374sbe1eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 COV1030374SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-In Tariff: Single Rate Feed In Tariff","description":"Feed-In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.2},{"plan_id":"next-business-nex1045849sbe1eme-electricity","cdr_plan_id":"NEX1045849SBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"NBE Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.42,"supply_charge_cents_per_day":108},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1786.8,"at_4000_kwh":2251,"at_5000_kwh":2715.2,"at_8000_kwh":4107.8},"marginal_rates":{"excess_unit_cost_cents":46.42,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1045849sbe1eme-electricity&source=ai","last_verified":"2026-04-16","source_doc":"CDR EnergyPlanDetailV3 NEX1045849SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Standing: Single Rate Feed In Tariff","description":"Solar | All kWh/day","type":"single","rate_cents_per_kwh":2}],"terms":"This offer is only available to small customers where Next Business Energy is currently financially responsible for the premise. The sale of electricity to the Customer is subject to Next Business Energy's Standing Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates in accordance with applicable Energy Laws.","onExpiryDescription":"This Standing Offer Contract continues until you change to another electricity supplier or accept an offer from Next Business Energy.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"RECONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.2},{"plan_id":"next-business-nex1045848sbe1eme-electricity","cdr_plan_id":"NEX1045848SBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"NBE Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.42,"supply_charge_cents_per_day":108},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1786.8,"at_4000_kwh":2251,"at_5000_kwh":2715.2,"at_8000_kwh":4107.8},"marginal_rates":{"excess_unit_cost_cents":46.42,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1045848sbe1eme-electricity&source=ai","last_verified":"2026-04-16","source_doc":"CDR EnergyPlanDetailV3 NEX1045848SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Standing: Single Rate Feed In Tariff","description":"Solar | All kWh/day","type":"single","rate_cents_per_kwh":2}],"terms":"This offer is only available to small customers where Next Business Energy is currently financially responsible for the premise. The sale of electricity to the Customer is subject to Next Business Energy's Standing Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates in accordance with applicable Energy Laws.","onExpiryDescription":"This Standing Offer Contract continues until you change to another electricity supplier or accept an offer from Next Business Energy.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"RECONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2.2},{"plan_id":"agl-agl15398sbe31eme-electricity","cdr_plan_id":"AGL15398SBE31@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Standing Offer (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.36,"supply_charge_cents_per_day":109.89,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":46.36},{"volume_kwh":null,"rate_cents_per_kwh":46.36}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1791.9,"at_4000_kwh":2255.5,"at_5000_kwh":2719.1,"at_8000_kwh":4109.9},"marginal_rates":{"excess_unit_cost_cents":46.36,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl15398sbe31eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL15398SBE31@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2},{"plan_id":"agl-agl15399sbe31eme-electricity","cdr_plan_id":"AGL15399SBE31@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Standing Offer (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.36,"supply_charge_cents_per_day":109.89,"block_rates":[{"volume_kwh":20000,"rate_cents_per_kwh":46.36},{"volume_kwh":null,"rate_cents_per_kwh":46.36}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1791.9,"at_4000_kwh":2255.5,"at_5000_kwh":2719.1,"at_8000_kwh":4109.9},"marginal_rates":{"excess_unit_cost_cents":46.36,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl15399sbe31eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL15399SBE31@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":2},{"plan_id":"momentum-mom919641mbe6eme-electricity","cdr_plan_id":"MOM919641MBE6@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Pure Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":226.7,"peak_cents_per_kwh":45.3,"off_peak_cents_per_kwh":29.3,"shoulder_cents_per_kwh":37.5,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1899.65,"at_4000_kwh":2257.05,"at_5000_kwh":2614.46,"at_8000_kwh":3686.65},"marginal_rates":{"excess_unit_cost_cents":45.3,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919641mbe6eme-electricity&source=ai","last_verified":"2026-05-20","source_doc":"CDR EnergyPlanDetailV3 MOM919641MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must have an ABN, communicate with us and receive your bills electronically, have the necessary metering configuration and meet all eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.3},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":37.5},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":45.3},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.3}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.3},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":45.3},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.3}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.3},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":37.5},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.3}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.3}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.9},{"plan_id":"red-energy-red552148mbe11eme-electricity","cdr_plan_id":"RED552148MBE11@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Red Business Saver (TOU Seasonal)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":42.85,"shoulder_cents_per_kwh":32,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1813.25,"at_4000_kwh":2259.5,"at_5000_kwh":2705.75,"at_8000_kwh":4044.5},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552148mbe11eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552148MBE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":42.85},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":32},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.85}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":42.85},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.85}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":42.85},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.85}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":42.85}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.8},{"plan_id":"red-energy-red552536mbe12eme-electricity","cdr_plan_id":"RED552536MBE12@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Plus (TOU Seasonal)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":42.85,"shoulder_cents_per_kwh":32,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1813.25,"at_4000_kwh":2259.5,"at_5000_kwh":2705.75,"at_8000_kwh":4044.5},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552536mbe12eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552536MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 15,000 bonus Qantas Points when you pay your first electricity bill in full, and 3 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":42.85},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":32},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.85}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":42.85},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.85}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":42.85},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.85}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":42.85}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.8},{"plan_id":"red-energy-red552554mbe12eme-electricity","cdr_plan_id":"RED552554MBE12@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Qantas Red Business Saver (TOU Seasonal)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130,"peak_cents_per_kwh":56,"off_peak_cents_per_kwh":42.85,"shoulder_cents_per_kwh":32,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1813.25,"at_4000_kwh":2259.5,"at_5000_kwh":2705.75,"at_8000_kwh":4044.5},"marginal_rates":{"excess_unit_cost_cents":56,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"QANTAS"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red552554mbe12eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 RED552554MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary your rates in line with our Customer Charter and in accordance with the Relevant Laws. We will give you written notice of at least 5 business day prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Qantas Points","description":"Get 10,000 bonus Qantas Points when you pay your first electricity bill in full, and 2 Qantas Points per $1 on every electricity bill when you pay on time. For T&Cs see redenergy.com.au/terms"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"Red Energy offers 100% GreenPower for an extra 3.3 cents per kWh. Please contact us on 131 806 for more information.","tiers":[{"percentGreen":100,"amount":"0.033"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":42.85},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":32},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.85}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":42.85},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.85}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":42.85},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":32},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.85}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":42.85}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.8},{"plan_id":"origin-ori430721mbe19eme-electricity","cdr_plan_id":"ORI430721MBE19@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Solar Boost","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.21,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1802.29,"at_4000_kwh":2264.39,"at_5000_kwh":2726.49,"at_8000_kwh":4112.79},"marginal_rates":{"excess_unit_cost_cents":46.21,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430721mbe19eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI430721MBE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 8 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.6},{"plan_id":"origin-ori430715mbe19eme-electricity","cdr_plan_id":"ORI430715MBE19@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Solar Boost","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.21,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1802.29,"at_4000_kwh":2264.39,"at_5000_kwh":2726.49,"at_8000_kwh":4112.79},"marginal_rates":{"excess_unit_cost_cents":46.21,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430715mbe19eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI430715MBE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 8 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/2402/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.6},{"plan_id":"origin-ori429337sbe14eme-electricity","cdr_plan_id":"ORI429337SBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.21,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1802.29,"at_4000_kwh":2264.39,"at_5000_kwh":2726.49,"at_8000_kwh":4112.79},"marginal_rates":{"excess_unit_cost_cents":46.21,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429337sbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429337SBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.6},{"plan_id":"origin-ori429285sbe14eme-electricity","cdr_plan_id":"ORI429285SBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.21,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1802.29,"at_4000_kwh":2264.39,"at_5000_kwh":2726.49,"at_8000_kwh":4112.79},"marginal_rates":{"excess_unit_cost_cents":46.21,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429285sbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429285SBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.6},{"plan_id":"origin-ori429261mbe14eme-electricity","cdr_plan_id":"ORI429261MBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.21,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1802.29,"at_4000_kwh":2264.39,"at_5000_kwh":2726.49,"at_8000_kwh":4112.79},"marginal_rates":{"excess_unit_cost_cents":46.21,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429261mbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429261MBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.6},{"plan_id":"origin-ori429248mbe14eme-electricity","cdr_plan_id":"ORI429248MBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.21,"supply_charge_cents_per_day":113.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1802.29,"at_4000_kwh":2264.39,"at_5000_kwh":2726.49,"at_8000_kwh":4112.79},"marginal_rates":{"excess_unit_cost_cents":46.21,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429248mbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429248MBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.6},{"plan_id":"engie-eng1048439mbe1eme-electricity","cdr_plan_id":"ENG1048439MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Business GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048439mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048439MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_DAY","description":"To participate in the GreenPower accredited program a daily charge of $1.50 (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.5"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng1048440mbe1eme-electricity","cdr_plan_id":"ENG1048440MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Business GreenPower electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048440mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048440MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_DAY","description":"To participate in the GreenPower accredited program a daily charge of $1.50 (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.5"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng1048977mbe1eme-electricity","cdr_plan_id":"ENG1048977MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Business Flyer Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Virgin Australia BusinessFlyer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048977mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048977MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Velocity Points","description":"You'll receive an upfront bonus of 15,000 Velocity Points, and then you'll receive 3 Velocity Points for every $1 you pay for electricity."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng1048976mbe1eme-electricity","cdr_plan_id":"ENG1048976MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ENGIE Business Flyer Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Virgin Australia BusinessFlyer"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048976mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048976MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Velocity Points","description":"You'll receive an upfront bonus of 15,000 Velocity Points, and then you'll receive 3 Velocity Points for every $1 you pay for electricity."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng1048191mbe1eme-electricity","cdr_plan_id":"ENG1048191MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Business GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048191mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048191MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_DAY","description":"To participate in the GreenPower accredited program a daily charge of $1.50 (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.5"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng1048190mbe1eme-electricity","cdr_plan_id":"ENG1048190MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA_ ENGIE Business GreenPower Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048190mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048190MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE 100% GreenPower","description":"100% of your electricity will be matched with GreenPower, sourced from accredited, renewable electricity sources."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_DAY","description":"To participate in the GreenPower accredited program a daily charge of $1.50 (inc GST) will be applied to your electricity bill.","tiers":[{"percentGreen":100,"amount":"1.5"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng1048625mbe1eme-electricity","cdr_plan_id":"ENG1048625MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048625mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048625MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng1048624mbe1eme-electricity","cdr_plan_id":"ENG1048624MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Everyday Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1048624mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1048624MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"PAYMENT_PROCESSING","amount":"3.25","description":"You may be charged payment channel fees of $3.25 incl GST for Australia Post over the counter payments.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng1049236mbe1eme-electricity","cdr_plan_id":"ENG1049236MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049236mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049236MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng1049235mbe1eme-electricity","cdr_plan_id":"ENG1049235MBE1@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Movers Elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Moving house"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng1049235mbe1eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG1049235MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08. All time-dependent rates (eg. 4pm to 8pm) are billed in AEST.","variation":"We may vary your rates and charges at any time, including if any underlying information is incorrect, you get a new meter or your distributor changes your tariff. We'll give you advance notice of any change, which may be on your bill.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days' notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.2","description":"A $2.20 (inc. GST) charge will apply to paper bills sent in the post.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit)","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A fee of $12 may apply for payments made after the due date (GST exempt).","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"ENGIE Movers guarantee","description":"Whether you're a new or existing ENGIE customer, we make moving easy.  Plus, your electricity will be on in 3 business days, guaranteed, or we'll give you $500 credit back on your first bill."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng937950sbe4eme-electricity","cdr_plan_id":"ENG937950SBE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng937950sbe4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG937950SBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"engie-eng937949sbe4eme-electricity","cdr_plan_id":"ENG937949SBE4@EME","retailer":"ENGIE","retailer_slug":"engie","retailer_logo_uri":"https://www.engie.com.au/sites/default/files/icons/engie_logo.png","plan_name":"SA ENGIE Business Standing elec","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.17,"supply_charge_cents_per_day":114.84,"block_rates":[{"volume_kwh":42,"rate_cents_per_kwh":46.17},{"volume_kwh":null,"rate_cents_per_kwh":48.48}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1804.27,"at_4000_kwh":2265.97,"at_5000_kwh":2727.67,"at_8000_kwh":4112.77},"marginal_rates":{"excess_unit_cost_cents":46.17,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=engie-eng937949sbe4eme-electricity&source=ai","last_verified":"2026-04-24","source_doc":"CDR EnergyPlanDetailV3 ENG937949SBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"ENGIE Market FIT","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"ENGIE Premium FIT (limited eligibility)","type":"single","rate_cents_per_kwh":45}],"terms":"For further details on the information presented in this Plan Information Document, or for full terms and conditions, please visit www.engie.com.au or call ENGIE on 13 88 08.","variation":"We will not vary our standing offer prices more than once every 6 months. We will publish any variation in a newspaper and on our website with at least 10 business days notice, and include details with your next bill if the variation affects you.","onExpiryDescription":"Ongoing energy plan until you or we end it. We may end this energy plan at any time by giving you 20 Business Days notice.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees may apply. For information please contact us on 13 88 08.","fees":[{"type":"RECONNECTION","amount":"63.712","description":"Reconnection (Normal Hours) (Includes GST).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0032","description":"You may be charged a 0.32% merchant service fee for paying by Visa or Mastercard (unless you pay via direct debit).","term":"PERCENT_OF_BILL","rate":"0.0032"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.5},{"plan_id":"alinta-ali13196sbe19eme-electricity","cdr_plan_id":"ALI13196SBE19@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SME Standing Offer - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.13,"supply_charge_cents_per_day":116.07,"block_rates":[{"volume_kwh":27.3973,"rate_cents_per_kwh":46.13},{"volume_kwh":null,"rate_cents_per_kwh":46.13}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1807.56,"at_4000_kwh":2268.86,"at_5000_kwh":2730.16,"at_8000_kwh":4114.06},"marginal_rates":{"excess_unit_cost_cents":46.13,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali13196sbe19eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI13196SBE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.4},{"plan_id":"alinta-ali13167sbe19eme-electricity","cdr_plan_id":"ALI13167SBE19@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SME Standing Offer - Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":46.13,"supply_charge_cents_per_day":116.07,"block_rates":[{"volume_kwh":27.3973,"rate_cents_per_kwh":46.13},{"volume_kwh":null,"rate_cents_per_kwh":46.13}]},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1807.56,"at_4000_kwh":2268.86,"at_5000_kwh":2730.16,"at_8000_kwh":4114.06},"marginal_rates":{"excess_unit_cost_cents":46.13,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali13167sbe19eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI13167SBE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":1.4},{"plan_id":"lumo-energy-sa-lum21992sbe16eme-electricity","cdr_plan_id":"LUM21992SBE16@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":48.49,"off_peak_cents_per_kwh":38.11,"shoulder_cents_per_kwh":null,"peak_hours":"4pm-7:59pm mon, tue, wed, thu, fri","off_peak_hours":"8pm-3:59pm mon, tue, wed, thu, fri, sat, sun; 4pm-7:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1867.15,"at_4000_kwh":2279.39,"at_5000_kwh":2691.63,"at_8000_kwh":3928.35},"marginal_rates":{"excess_unit_cost_cents":48.49,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum21992sbe16eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM21992SBE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":16,"rateCents":38.11},{"type":"PEAK","startHour":16,"endHour":20,"rateCents":48.49},{"type":"OFF_PEAK","startHour":20,"endHour":24,"rateCents":38.11}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":16,"rateCents":38.11},{"type":"OFF_PEAK","startHour":16,"endHour":20,"rateCents":38.11},{"type":"OFF_PEAK","startHour":20,"endHour":24,"rateCents":38.11}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.9},{"plan_id":"lumo-energy-sa-lum23557sbe18eme-electricity","cdr_plan_id":"LUM23557SBE18@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":48.49,"off_peak_cents_per_kwh":38.11,"shoulder_cents_per_kwh":null,"peak_hours":"4pm-7:59pm mon, tue, wed, thu, fri","off_peak_hours":"8pm-3:59pm mon, tue, wed, thu, fri, sat, sun; 4pm-7:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1867.15,"at_4000_kwh":2279.39,"at_5000_kwh":2691.63,"at_8000_kwh":3928.35},"marginal_rates":{"excess_unit_cost_cents":48.49,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum23557sbe18eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM23557SBE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl)? generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":16,"rateCents":38.11},{"type":"PEAK","startHour":16,"endHour":20,"rateCents":48.49},{"type":"OFF_PEAK","startHour":20,"endHour":24,"rateCents":38.11}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":16,"rateCents":38.11},{"type":"OFF_PEAK","startHour":16,"endHour":20,"rateCents":38.11},{"type":"OFF_PEAK","startHour":20,"endHour":24,"rateCents":38.11}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.9},{"plan_id":"red-energy-red21581sbe15eme-electricity","cdr_plan_id":"RED21581SBE15@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":48.49,"off_peak_cents_per_kwh":38.11,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1867.15,"at_4000_kwh":2279.39,"at_5000_kwh":2691.63,"at_8000_kwh":3928.35},"marginal_rates":{"excess_unit_cost_cents":48.49,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red21581sbe15eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED21581SBE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.11},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":48.49},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.11}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.11},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":38.11},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.11}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.9},{"plan_id":"red-energy-red21580sbe14eme-electricity","cdr_plan_id":"RED21580SBE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":48.49,"off_peak_cents_per_kwh":38.11,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1867.15,"at_4000_kwh":2279.39,"at_5000_kwh":2691.63,"at_8000_kwh":3928.35},"marginal_rates":{"excess_unit_cost_cents":48.49,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red21580sbe14eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED21580SBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.11},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":48.49},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.11}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.11},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":38.11},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.11}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.9},{"plan_id":"ovo-energy-ovo704475mre19eme-electricity","cdr_plan_id":"OVO704475MRE19@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Free 3 Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":49.2,"supply_charge_cents_per_day":134,"free_window_start":"11:00","free_window_end":"14:00","free_window_fraction":0.0898,"original_tariff_type":"time_of_use","peak_cents_per_kwh":49.2,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"11am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Free 3 Rate","discount_percent":9.93,"applies_to":"usage_only","annual_value_at_benchmark":0,"condition_plain_english":"Discount amount stated is an estimate. Actual discount percentage amount will vary depending on customer's actual usage during Free 3 period 11am - 2pm daily. Applies to usage charges only, excludes controlled load."}],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1832.56,"at_4000_kwh":2280.37,"at_5000_kwh":2728.19,"at_8000_kwh":4071.65},"marginal_rates":{"excess_unit_cost_cents":49.2,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704475mre19eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704475MRE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free 3","description":"Free electricity between 11am and 2pm everyday. For more information head to https://pages.ovoenergy.com.au/the-free-3-plan"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":11,"rateCents":49.2},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":49.2}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.9},{"plan_id":"ovo-energy-ovo704476mre19eme-electricity","cdr_plan_id":"OVO704476MRE19@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Free 3 Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":49.2,"supply_charge_cents_per_day":134,"free_window_start":"11:00","free_window_end":"14:00","free_window_fraction":0.0898,"original_tariff_type":"time_of_use","peak_cents_per_kwh":49.2,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"11am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Free 3 Rate","discount_percent":9.93,"applies_to":"usage_only","annual_value_at_benchmark":0,"condition_plain_english":"Discount amount stated is an estimate. Actual discount percentage amount will vary depending on customer's actual usage during Free 3 period 11am - 2pm daily. Applies to usage charges only, excludes controlled load."}],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1832.56,"at_4000_kwh":2280.37,"at_5000_kwh":2728.19,"at_8000_kwh":4071.65},"marginal_rates":{"excess_unit_cost_cents":49.2,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704476mre19eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704476MRE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free 3","description":"Free electricity between 11am and 2pm everyday. For more information head to https://pages.ovoenergy.com.au/the-free-3-plan"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":11,"rateCents":49.2},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":49.2}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.9},{"plan_id":"1st-energy-1st961471sbe1eme-electricity","cdr_plan_id":"1ST961471SBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"Standing Offer - Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.8,"supply_charge_cents_per_day":123},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1822.95,"at_4000_kwh":2280.95,"at_5000_kwh":2738.95,"at_8000_kwh":4112.95},"marginal_rates":{"excess_unit_cost_cents":45.8,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st961471sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 1ST961471SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions.","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.9},{"plan_id":"1st-energy-1st961472sbe1eme-electricity","cdr_plan_id":"1ST961472SBE1@EME","retailer":"1st Energy","retailer_slug":"1st-energy","retailer_logo_uri":"https://1stenergy.com.au/wp-content/uploads/2023/11/1stEnergy_colour_RGB.png","plan_name":"Standing Offer - Single Rate + Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.8,"supply_charge_cents_per_day":123},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1822.95,"at_4000_kwh":2280.95,"at_5000_kwh":2738.95,"at_8000_kwh":4112.95},"marginal_rates":{"excess_unit_cost_cents":45.8,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=1st-energy-1st961472sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 1ST961472SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar Bonus Scheme Feed-in tariff (GST exempt)","description":"Solar Bonus Scheme Feed-in tariff (GST exempt)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), first 5 kWh's/day","type":"single","rate_cents_per_kwh":1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-in tariff (GST exempt)","description":"Feed-in tariff (GST exempt), thereafter (>5 kWh's/day)","type":"single","rate_cents_per_kwh":0.1}],"terms":"For further details on the information presented in this fact sheet, or the terms and conditions of the offer, please visit www.1stenergy.com.au or call 1st Energy on 1300 426 594.","variation":"Prices may be varied in line with your terms and conditions. If your charges are increasing we will notify you at least 5 business days prior to the variation taking effect, otherwise we will provide you with notice not later than your next bill.","onExpiryDescription":"Your contract continues until terminated by you or us in accordance with our terms and conditions.","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6","Type 4","Type 4a"],"additionalFeeInformation":"Additional fees may apply. For more information, please call 1300 426 594.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (inc. GST), generally applies for move-in requests","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (inc. GST), generally applies for move-out requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"7.5","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":[],"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.9},{"plan_id":"powershop-psh925637sbe2eme-electricity","cdr_plan_id":"PSH925637SBE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":143,"peak_cents_per_kwh":44.16,"off_peak_cents_per_kwh":44.16,"shoulder_cents_per_kwh":44.16,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-4:59pm sat, sun · Winter: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1846.75,"at_4000_kwh":2288.35,"at_5000_kwh":2729.95,"at_8000_kwh":4054.75},"marginal_rates":{"excess_unit_cost_cents":44.16,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925637sbe2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925637SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"This offer is available to customers within the SA Power Networks distribution zone with the applicable network tariff and meter configuration, and where Powershop is the retailer responsible for electricity supplied at the premises. We require a credit card or bank details. For further information in relation to Powershop and this offer - see our full terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We�ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.16},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":44.16},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.16},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.16}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.16},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":44.16},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.16},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.16}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.16},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":44.16},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.16}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":44.16}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.5},{"plan_id":"powershop-psh925633sbe2eme-electricity","cdr_plan_id":"PSH925633SBE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.16,"supply_charge_cents_per_day":143},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1846.75,"at_4000_kwh":2288.35,"at_5000_kwh":2729.95,"at_8000_kwh":4054.75},"marginal_rates":{"excess_unit_cost_cents":44.16,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925633sbe2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925633SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"This offer is available to customers within the SA Power Networks distribution zone with the applicable network tariff and meter configuration, and where Powershop is the retailer responsible for electricity supplied at the premises. We require a credit card or bank details. For further information in relation to Powershop and this offer - see our full terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We�ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.5},{"plan_id":"powershop-psh925645sbe2eme-electricity","cdr_plan_id":"PSH925645SBE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.16,"supply_charge_cents_per_day":143},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1846.75,"at_4000_kwh":2288.35,"at_5000_kwh":2729.95,"at_8000_kwh":4054.75},"marginal_rates":{"excess_unit_cost_cents":44.16,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925645sbe2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925645SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"This offer is available to customers within the SA Power Networks distribution zone with the applicable network tariff and meter configuration, and where Powershop is the retailer responsible for electricity supplied at the premises. We require a credit card or bank details. For further information in relation to Powershop and this offer - see our full terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We�ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.5},{"plan_id":"powershop-psh925624sbe2eme-electricity","cdr_plan_id":"PSH925624SBE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":143,"peak_cents_per_kwh":44.16,"off_peak_cents_per_kwh":44.16,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1846.75,"at_4000_kwh":2288.35,"at_5000_kwh":2729.95,"at_8000_kwh":4054.75},"marginal_rates":{"excess_unit_cost_cents":44.16,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925624sbe2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925624SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"If you�re on a Time of Use tariff and have a basic accumulation (type 6) meter, your peak, off-peak and shoulder times may be determined by your distributor and differ from the above times shown with the prices. To check applicable times, visit www.powershop.com.au/timings-information. For full offer terms and conditions, visit powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We�ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.16},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":44.16},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.16}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.5},{"plan_id":"powershop-psh925594sbe2eme-electricity","cdr_plan_id":"PSH925594SBE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":143,"peak_cents_per_kwh":44.16,"off_peak_cents_per_kwh":44.16,"shoulder_cents_per_kwh":44.16,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-4:59pm sat, sun · Winter: 12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1846.75,"at_4000_kwh":2288.35,"at_5000_kwh":2729.95,"at_8000_kwh":4054.75},"marginal_rates":{"excess_unit_cost_cents":44.16,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925594sbe2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925594SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"This offer is available to customers within the SA Power Networks distribution zone with the applicable network tariff and meter configuration, and where Powershop is the retailer responsible for electricity supplied at the premises. We require a credit card or bank details. For further information in relation to Powershop and this offer - see our full terms and conditions at: powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We�ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.16},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":44.16},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.16},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.16}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.16},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":44.16},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":44.16},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.16}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.16},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":44.16},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.16}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":44.16}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.5},{"plan_id":"powershop-psh925600sbe2eme-electricity","cdr_plan_id":"PSH925600SBE2@EME","retailer":"Powershop","retailer_slug":"powershop","retailer_logo_uri":"https://www.powershop.com.au/_next/image?url=%2Fpowershop-logo.png&w=256&q=75","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":143,"peak_cents_per_kwh":44.16,"off_peak_cents_per_kwh":44.16,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1846.75,"at_4000_kwh":2288.35,"at_5000_kwh":2729.95,"at_8000_kwh":4054.75},"marginal_rates":{"excess_unit_cost_cents":44.16,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=powershop-psh925600sbe2eme-electricity&source=ai","last_verified":"2025-09-09","source_doc":"CDR EnergyPlanDetailV3 PSH925600SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"If you�re on a Time of Use tariff and have a basic accumulation (type 6) meter, your peak, off-peak and shoulder times may be determined by your distributor and differ from the above times shown with the prices. To check applicable times, visit www.powershop.com.au/timings-information. For full offer terms and conditions, visit powershop.com.au/terms-and-conditions","variation":"We may vary these prices no more than once every 6 months. We�ll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice.","onExpiryDescription":"This Powershop offer is an ongoing contract (until you or we end it) with no exit fees.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 6"],"additionalFeeInformation":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","fees":[{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Information is set out on our fees page: powershop.com.au/fees.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A manual disconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A manual connection fee","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5c/kWh inc. GST (no discounts apply to GreenPower charges). You can purchase as much, or as little, 100% GreenPower as you like.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.16},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":44.16},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.16}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.5},{"plan_id":"alinta-ali153070sbe14eme-electricity","cdr_plan_id":"ALI153070SBE14@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SME Standing Offer - Time of Use (Interval)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":96.02,"peak_cents_per_kwh":65.63,"off_peak_cents_per_kwh":37.61,"shoulder_cents_per_kwh":50.05,"peak_hours":"General Usage: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"General Usage: 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-4:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":"General Usage: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1805.59,"at_4000_kwh":2290.63,"at_5000_kwh":2775.67,"at_8000_kwh":4230.79},"marginal_rates":{"excess_unit_cost_cents":65.63,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali153070sbe14eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI153070SBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"General Usage (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.61},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":50.05},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":65.63},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.61}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.61},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":37.61},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":65.63},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.61}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.61},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":50.05},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.61}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.61},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":37.61},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.61}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.5},{"plan_id":"alinta-ali153071sbe15eme-electricity","cdr_plan_id":"ALI153071SBE15@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SME Standing Offer - Time of Use (Interval) + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":96.02,"peak_cents_per_kwh":65.63,"off_peak_cents_per_kwh":37.61,"shoulder_cents_per_kwh":50.05,"peak_hours":"General Usage: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"General Usage: 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-4:59pm sat, sun · Time of Use Tariff Period: 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":"General Usage: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1805.59,"at_4000_kwh":2290.63,"at_5000_kwh":2775.67,"at_8000_kwh":4230.79},"marginal_rates":{"excess_unit_cost_cents":65.63,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali153071sbe15eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI153071SBE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"General Usage (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.61},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":50.05},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":65.63},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.61}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.61},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":37.61},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":65.63},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.61}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.61},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":50.05},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.61}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":37.61},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":37.61},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":37.61}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0.5},{"plan_id":"momentum-mom921318mbe3eme-electricity","cdr_plan_id":"MOM921318MBE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Bill Boss Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":226.7,"peak_cents_per_kwh":46.7,"off_peak_cents_per_kwh":30.2,"shoulder_cents_per_kwh":38.6,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1932.36,"at_4000_kwh":2300.66,"at_5000_kwh":2668.96,"at_8000_kwh":3773.86},"marginal_rates":{"excess_unit_cost_cents":46.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921318mbe3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921318MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, sign up via our third party sales channels or call Momentum directly, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.2},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":38.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.2}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":30.2},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":46.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.2}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.2},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":38.6},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.2}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":30.2}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":0},{"plan_id":"next-business-nex1045852sbe1eme-electricity","cdr_plan_id":"NEX1045852SBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"NBE Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":121.72,"peak_cents_per_kwh":53.5,"off_peak_cents_per_kwh":43.5,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1839.28,"at_4000_kwh":2304.28,"at_5000_kwh":2769.28,"at_8000_kwh":4164.28},"marginal_rates":{"excess_unit_cost_cents":53.5,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1045852sbe1eme-electricity&source=ai","last_verified":"2026-04-16","source_doc":"CDR EnergyPlanDetailV3 NEX1045852SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Standing: Single Rate Feed In Tariff","description":"Solar | All kWh/day","type":"single","rate_cents_per_kwh":2}],"terms":"This offer is only available to small customers where Next Business Energy is currently financially responsible for the premise. The sale of electricity to the Customer is subject to Next Business Energy's Standing Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates in accordance with applicable Energy Laws.","onExpiryDescription":"This Standing Offer Contract continues until you change to another electricity supplier or accept an offer from Next Business Energy.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"RECONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"58.069","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.5},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":53.5},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.5}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":43.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-0.1},{"plan_id":"energyaustralia-ene252018mbe28eme-electricity","cdr_plan_id":"ENE252018MBE28@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Business Balance Plan 12 - Peak Only","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.32,"supply_charge_cents_per_day":138.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1865.13,"at_4000_kwh":2318.32,"at_5000_kwh":2771.53,"at_8000_kwh":4131.13},"marginal_rates":{"excess_unit_cost_cents":45.32,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene252018mbe28eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE252018MBE28@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges.","fees":[{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-0.8},{"plan_id":"energyaustralia-ene32428sbe26eme-electricity","cdr_plan_id":"ENE32428SBE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Standing Offer Business - Peak with CL 1 & 2","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.32,"supply_charge_cents_per_day":138.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1865.13,"at_4000_kwh":2318.32,"at_5000_kwh":2771.53,"at_8000_kwh":4131.13},"marginal_rates":{"excess_unit_cost_cents":45.32,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene32428sbe26eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE32428SBE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","variation":"The rates for Standing Offer Business may vary, either when the AER changes the reference price, or when we review our rates each year. We will notify you before any rate change occurs.","onExpiryDescription":"This contract continues for as long as you remain on the plan.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or Bpay.","fees":[{"type":"LATE_PAYMENT","amount":"10.9","description":"$10.90 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-0.8},{"plan_id":"energyaustralia-ene252010mbe28eme-electricity","cdr_plan_id":"ENE252010MBE28@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Business Balance Plan 12 - Peak with CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.32,"supply_charge_cents_per_day":138.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1865.13,"at_4000_kwh":2318.32,"at_5000_kwh":2771.53,"at_8000_kwh":4131.13},"marginal_rates":{"excess_unit_cost_cents":45.32,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene252010mbe28eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE252010MBE28@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges.","fees":[{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-0.8},{"plan_id":"energyaustralia-ene32427sbe26eme-electricity","cdr_plan_id":"ENE32427SBE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Standing Offer Business - Peak Only","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.32,"supply_charge_cents_per_day":138.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1865.13,"at_4000_kwh":2318.32,"at_5000_kwh":2771.53,"at_8000_kwh":4131.13},"marginal_rates":{"excess_unit_cost_cents":45.32,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene32427sbe26eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE32427SBE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","variation":"The rates for Standing Offer Business may vary, either when the AER changes the reference price, or when we review our rates each year. We will notify you before any rate change occurs.","onExpiryDescription":"This contract continues for as long as you remain on the plan.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or Bpay.","fees":[{"type":"LATE_PAYMENT","amount":"10.9","description":"$10.90 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-0.8},{"plan_id":"energyaustralia-ene234174mbe26eme-electricity","cdr_plan_id":"ENE234174MBE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Business Rate Fix - Peak Only","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.32,"supply_charge_cents_per_day":138.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1865.13,"at_4000_kwh":2318.32,"at_5000_kwh":2771.53,"at_8000_kwh":4131.13},"marginal_rates":{"excess_unit_cost_cents":45.32,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene234174mbe26eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE234174MBE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges.","fees":[{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-0.8},{"plan_id":"energyaustralia-ene234175mbe26eme-electricity","cdr_plan_id":"ENE234175MBE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Business Rate Fix  - Peak with CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":45.32,"supply_charge_cents_per_day":138.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1865.13,"at_4000_kwh":2318.32,"at_5000_kwh":2771.53,"at_8000_kwh":4131.13},"marginal_rates":{"excess_unit_cost_cents":45.32,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene234175mbe26eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE234175MBE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges.","fees":[{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-0.8},{"plan_id":"sumo-sum926370sbe3eme-electricity","cdr_plan_id":"SUM926370SBE3@EME","retailer":"Sumo","retailer_slug":"sumo","retailer_logo_uri":"https://sumo-public-share.s3.ap-southeast-2.amazonaws.com/SumoIT/URI/Sumo_Logo.png","plan_name":"Sumo Standing Offer Single rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.8,"supply_charge_cents_per_day":144.2},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1870.33,"at_4000_kwh":2318.33,"at_5000_kwh":2766.33,"at_8000_kwh":4110.33},"marginal_rates":{"excess_unit_cost_cents":44.8,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"you meet our requirements"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=sumo-sum926370sbe3eme-electricity&source=ai","last_verified":"2025-07-10","source_doc":"CDR EnergyPlanDetailV3 SUM926370SBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed in Tariff","description":"If you have installed solar PV at the Premises, you may be eligible to be paid for excess electricity you feed back into the grid. Maximum system size of 10KW.","type":"single","rate_cents_per_kwh":0}],"terms":"Offer not available in all areas or properties. You must be a Small Business customer with an applicable network tariff for a premises where Sumo supplies Electricity. Please refer to our website https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions for full terms and conditions.","variation":"Prices, fees and charges are subject to change. We will give you at least 5 business days prior notice.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 5","Type 4"],"additionalFeeInformation":"We will pass through any fee imposed by your distributor, including fees for disconnection or reconnection, or special meter read on move-out. Distributor fees published at https://www.sumo.com.au/help-and-support/rates-and-other-charges/other-fees-and-charges. Fee applied to your next bill.","fees":[{"type":"OTHER","amount":"2.75","description":"Dishonoured Payment Fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A standard connection fee of $63.71 (ex GST) applies when you requested a connection of your electricity supply during standard business hours (Monday to Friday, excluding public holidays) when the site is already connected.  All fees are subject to change and may vary depending on your distribution network or specific property requirements. Additional charges may apply for urgent, after-hours, or complex connections.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.007","description":"This fee is only applicable for payments made by credit card.","term":"PERCENT_OF_BILL","rate":"0.007"},{"type":"PAPER_BILL","amount":"3.1","description":"Bills can be issued by email for no cost, or alternatively by post at a cost of $3.10 (inc GST) per bill.","term":"FIXED"},{"type":"OTHER","amount":"2.00","description":"Over the counter fee at Australia Post","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-0.8},{"plan_id":"sumo-sum976234sbe1eme-electricity","cdr_plan_id":"SUM976234SBE1@EME","retailer":"Sumo","retailer_slug":"sumo","retailer_logo_uri":"https://sumo-public-share.s3.ap-southeast-2.amazonaws.com/SumoIT/URI/Sumo_Logo.png","plan_name":"Sumo Standing Offer Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.8,"supply_charge_cents_per_day":144.2},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1870.33,"at_4000_kwh":2318.33,"at_5000_kwh":2766.33,"at_8000_kwh":4110.33},"marginal_rates":{"excess_unit_cost_cents":44.8,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"you meet our requirements"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=sumo-sum976234sbe1eme-electricity&source=ai","last_verified":"2025-07-10","source_doc":"CDR EnergyPlanDetailV3 SUM976234SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed in Tariff","description":"If you have installed solar PV at the Premises, you may be eligible to be paid for excess electricity you feed back into the grid. Maximum system size of 10KW.","type":"single","rate_cents_per_kwh":0}],"terms":"Offer not available in all areas or properties. You must be a Small Business customer with an applicable network tariff for a premises where Sumo supplies Electricity. Please refer to our website https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions for full terms and conditions.","variation":"Prices, fees and charges are subject to change. We will give you at least 5 business days prior notice.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 5","Type 4"],"additionalFeeInformation":"We will pass through any fee imposed by your distributor, including fees for disconnection or reconnection, or special meter read on move-out. Distributor fees published at https://www.sumo.com.au/help-and-support/rates-and-other-charges/other-fees-and-charges. Fee applied to your next bill.","fees":[{"type":"OTHER","amount":"2.75","description":"Dishonoured Payment Fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A standard connection fee of $63.71 (ex GST) applies when you requested a connection of your electricity supply during standard business hours (Monday to Friday, excluding public holidays) when the site is already connected.  All fees are subject to change and may vary depending on your distribution network or specific property requirements. Additional charges may apply for urgent, after-hours, or complex connections.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.007","description":"This fee is only applicable for payments made by credit card.","term":"PERCENT_OF_BILL","rate":"0.007"},{"type":"PAPER_BILL","amount":"3.1","description":"Bills can be issued by email for no cost, or alternatively by post at a cost of $3.10 (inc GST) per bill.","term":"FIXED"},{"type":"OTHER","amount":"2.00","description":"Over the counter fee at Australia Post","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-0.8},{"plan_id":"amber-electric-amb1042933mbe1eme-electricity","cdr_plan_id":"AMB1042933MBE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Amber Small Business Plan (Small Usage)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48.9,"supply_charge_cents_per_day":100.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1835.54,"at_4000_kwh":2324.54,"at_5000_kwh":2813.54,"at_8000_kwh":4280.54},"marginal_rates":{"excess_unit_cost_cents":48.9,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042933mbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042933MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to small business customers with estimated imports or exports (whichever is greater) above 10MWh up to 20MWh per year (as calculated quarterly by Amber), in SA Power's distribution region with a flat rate or TOU tariff. For illustrative purposes, tariff BSR assumed. Feed-In Tariffs only valid if applicable.","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"600.00","description":"Membership of $50 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1},{"plan_id":"amber-electric-amb1042951mbe1eme-electricity","cdr_plan_id":"AMB1042951MBE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Amber Small Business Plan (Extra Large Usage)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48.9,"supply_charge_cents_per_day":100.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1835.54,"at_4000_kwh":2324.54,"at_5000_kwh":2813.54,"at_8000_kwh":4280.54},"marginal_rates":{"excess_unit_cost_cents":48.9,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042951mbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042951MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to small business customers with estimated imports or exports (whichever is greater) more than 100MWh per year (as calculated quarterly by Amber), in SA Power's distribution region with a flat rate or TOU tariff. For illustrative purposes, tariff BSR assumed. Feed-In Tariffs only valid if applicable.","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"4200.00","description":"Membership of $350 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1},{"plan_id":"amber-electric-amb1042945mbe1eme-electricity","cdr_plan_id":"AMB1042945MBE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Amber Small Business Plan (Large Usage)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48.9,"supply_charge_cents_per_day":100.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1835.54,"at_4000_kwh":2324.54,"at_5000_kwh":2813.54,"at_8000_kwh":4280.54},"marginal_rates":{"excess_unit_cost_cents":48.9,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042945mbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042945MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to small business customers with estimated imports or exports (whichever is greater) above 50MWh up to 100MWh per year (as calculated quarterly by Amber), in SA Power's distribution region with a flat rate or TOU tariff. For illustrative purposes, tariff BSR assumed. Feed-In Tariffs only valid if applicable.","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"2400.00","description":"Membership of $200 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1},{"plan_id":"amber-electric-amb1042939mbe1eme-electricity","cdr_plan_id":"AMB1042939MBE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Amber Small Business Plan (Medium Usage)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48.9,"supply_charge_cents_per_day":100.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1835.54,"at_4000_kwh":2324.54,"at_5000_kwh":2813.54,"at_8000_kwh":4280.54},"marginal_rates":{"excess_unit_cost_cents":48.9,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042939mbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042939MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to small business customers with estimated imports or exports (whichever is greater) above 20MWh up to 50MWh per year (as calculated quarterly by Amber), in SA Power's distribution region with a flat rate or TOU tariff. For illustrative purposes, tariff BSR assumed. Feed-In Tariffs only valid if applicable.","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"1500.00","description":"Membership of $125 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1},{"plan_id":"amber-electric-amb1042927mbe1eme-electricity","cdr_plan_id":"AMB1042927MBE1@EME","retailer":"Amber Electric","retailer_slug":"amber-electric","retailer_logo_uri":"https://cdn.prod.website-files.com/65bcfbd87eded73b1edd9413/65bcfdc9d78f09c7ba620068_amber-logo.svg","plan_name":"Amber Small Business Plan (Extra Small Usage)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":48.9,"supply_charge_cents_per_day":100.97},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1835.54,"at_4000_kwh":2324.54,"at_5000_kwh":2813.54,"at_8000_kwh":4280.54},"marginal_rates":{"excess_unit_cost_cents":48.9,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=amber-electric-amb1042927mbe1eme-electricity&source=ai","last_verified":"2026-04-01","source_doc":"CDR EnergyPlanDetailV3 AMB1042927MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Wholesale export price","description":"Wholesale price with guaranteed min of 0c/kWh over a 12 month period.","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://www.amber.com.au/terms. If you do not have a smart meter we will install one for you. Available to small business customers with estimated imports or exports (whichever is greater) up to 10MWh per year (as calculated quarterly by Amber), in SA Power's distribution region with a flat rate or TOU tariff. For illustrative purposes, tariff BSR assumed. Feed-In Tariffs only valid if applicable.","variation":"Usage prices change every 5 or 30 minutes depending on meter type, and are charged to you at the same costs charged to us. Prices determined by a range of factors, including government rebates, network fees and wholesale market costs. General Usage rate applies only if you are on a network flat rate tariff. If your average usage rate over a calendar quarter exceeds the c/kWh maximum rate listed below General Usage, we reduce your bill so that the total does not exceed the maximum rate.","onExpiryDescription":"Amber Offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","OTHER"],"meterTypes":["Type 0"],"additionalFeeInformation":"Standard fees are listed www.amber.com.au/fees, but additional service costs passed through from distributors may vary.","fees":[{"type":"MEMBERSHIP","amount":"300.00","description":"Membership of $25 per month (inc. GST) to access these wholesale rates.","term":"ANNUAL"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16 (inc. GST) fee applies if full payment has not been received by the invoice due date","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"3.00","description":"A $3 (inc. GST) fee applies if payment is dishonoured or reversed.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.01","description":"A fee of 1% applies to payments made by credit or debit card","term":"PERCENT_OF_BILL","rate":"0.01"},{"type":"CONNECTION","amount":"63.712","description":"Standard Connection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"Standard Disconnection Fee. Actual charges passed through from your distributor may vary, see www.amber.com.au/fees for more information","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 0.7203 cents/kWh (inc. GST) option avaliable. See website for more information.","tiers":[{"percentGreen":100,"amount":"0.007203"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1},{"plan_id":"momentum-mom919637mbe6eme-electricity","cdr_plan_id":"MOM919637MBE6@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Pure Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":226.7,"peak_cents_per_kwh":52.2,"off_peak_cents_per_kwh":29.2,"shoulder_cents_per_kwh":36.4,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri, sat, sun; 10am-3:59pm mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-4:59pm sat, sun","shoulder_hours":"7am-9:59am mon, tue, wed, thu, fri; 4pm-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1953.66,"at_4000_kwh":2329.05,"at_5000_kwh":2704.46,"at_8000_kwh":3830.66},"marginal_rates":{"excess_unit_cost_cents":52.2,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919637mbe6eme-electricity&source=ai","last_verified":"2026-05-20","source_doc":"CDR EnergyPlanDetailV3 MOM919637MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must have an ABN, communicate with us and receive your bills electronically, have the necessary metering configuration and meet all eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.2},{"type":"SHOULDER","startHour":7,"endHour":10,"rateCents":36.4},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":29.2},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":36.4},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":52.2},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.2}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.2},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":29.2},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":52.2},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.2}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1.2},{"plan_id":"dodo-dod221763sbe9eme-electricity","cdr_plan_id":"DOD221763SBE9@EME","retailer":"Dodo Power & Gas","retailer_slug":"dodo","retailer_logo_uri":"https://s0.2mdn.net/creatives/assets/4983616/Dodo_Logo_Aug23_V1.svg","plan_name":"Business Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":212.18,"peak_cents_per_kwh":47.85,"off_peak_cents_per_kwh":35.14,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri; 12am-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1943.05,"at_4000_kwh":2332.58,"at_5000_kwh":2722.11,"at_8000_kwh":3890.7},"marginal_rates":{"excess_unit_cost_cents":47.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=dodo-dod221763sbe9eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 DOD221763SBE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"TOU Rate Solar FiT","description":"Solar FIT Scheme (DFIT1) & (DFIT1A)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"Retailer Feed-in Tariff - This plan is available to eligible small solar customers with a maximum 10kW panel size and an inverter system no greater than 10kW as part of an ongoing contract.","type":"single","rate_cents_per_kwh":1}],"terms":"See our Standing terms and conditions at www.dodo.com/energy/terms-prices-and-regulatory-information.","variation":"We may vary these prices no more than once every 6 months, and provide you notice of any changes at least 5 business days before the change is effective. We will publish variations on our website and in a newspaper at least 10 business days prior.","onExpiryDescription":"Standing contracts do not expire until you notify us in accordance with our Standing Contract Terms and Conditions.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For further details on the information and fees presented, or the terms and conditions of the contract, please visit www.dodo.com/energy/terms-prices-and-regulatory-information or contact us on 13 dodo (13 36 36).","fees":[{"type":"DD_DISHONOUR","amount":"9.5","description":"Dishonoured Payment fee of $9.50 (inc GST) may apply to payments we attempt that are subsequently declined.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move into a property.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move out of a property.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply when moving into your property and connecting electricity to your property.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":35.14},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.85},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":35.14}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.14}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1.4},{"plan_id":"dodo-dod221764sbe9eme-electricity","cdr_plan_id":"DOD221764SBE9@EME","retailer":"Dodo Power & Gas","retailer_slug":"dodo","retailer_logo_uri":"https://s0.2mdn.net/creatives/assets/4983616/Dodo_Logo_Aug23_V1.svg","plan_name":"Business Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":212.18,"peak_cents_per_kwh":47.85,"off_peak_cents_per_kwh":35.14,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri; 12am-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1943.05,"at_4000_kwh":2332.58,"at_5000_kwh":2722.11,"at_8000_kwh":3890.7},"marginal_rates":{"excess_unit_cost_cents":47.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=dodo-dod221764sbe9eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 DOD221764SBE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"TOU Rate Solar FiT","description":"Solar FIT Scheme (DFIT1) & (DFIT1A)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"Retailer Feed-in Tariff - This plan is available to eligible small solar customers with a maximum 10kW panel size and an inverter system no greater than 10kW as part of an ongoing contract.","type":"single","rate_cents_per_kwh":1}],"terms":"See our Standing terms and conditions at www.dodo.com/energy/terms-prices-and-regulatory-information.","variation":"We may vary these prices no more than once every 6 months, and provide you notice of any changes at least 5 business days before the change is effective. We will publish variations on our website and in a newspaper at least 10 business days prior.","onExpiryDescription":"Standing contracts do not expire until you notify us in accordance with our Standing Contract Terms and Conditions.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For further details on the information and fees presented, or the terms and conditions of the contract, please visit www.dodo.com/energy/terms-prices-and-regulatory-information or contact us on 13 dodo (13 36 36).","fees":[{"type":"DD_DISHONOUR","amount":"9.5","description":"Dishonoured Payment fee of $9.50 (inc GST) may apply to payments we attempt that are subsequently declined.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move into a property.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move out of a property.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply when moving into your property and connecting electricity to your property.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":35.14},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":47.85},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":35.14}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":35.14}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1.4},{"plan_id":"origin-ori430713mbe19eme-electricity","cdr_plan_id":"ORI430713MBE19@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Solar Boost","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":57.31,"off_peak_cents_per_kwh":38.77,"shoulder_cents_per_kwh":49.66,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1870.57,"at_4000_kwh":2335.67,"at_5000_kwh":2800.77,"at_8000_kwh":4196.07},"marginal_rates":{"excess_unit_cost_cents":57.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430713mbe19eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI430713MBE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 8 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.66},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.31},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.66},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1.5},{"plan_id":"origin-ori430714mbe19eme-electricity","cdr_plan_id":"ORI430714MBE19@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Solar Boost","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":57.31,"off_peak_cents_per_kwh":38.77,"shoulder_cents_per_kwh":49.66,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":8,"annual_cost_estimates":{"at_3000_kwh":1870.57,"at_4000_kwh":2335.67,"at_5000_kwh":2800.77,"at_8000_kwh":4196.07},"marginal_rates":{"excess_unit_cost_cents":57.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Net metered Solar PV system"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori430714mbe19eme-electricity&source=ai","last_verified":"2025-08-29","source_doc":"CDR EnergyPlanDetailV3 ORI430714MBE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 8 cents per KWh until a daily export limit of 8 KWh is reached. The daily export limit is averaged across your billing period (calculated by multiplying the number of days in your billing period by your daily export limit of 8 KWh)","type":"single","rate_cents_per_kwh":8},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"For any amount above the daily export, you will receive our standard retailer feed-in tariff of  2 cents per KWh","type":"single","rate_cents_per_kwh":2}],"terms":"When the Energy Plan ends, you'll receive our standard retailer feed-in tariff published on our website. Not available all areas or property types. Small Business customers only. See originenergy.com.au/2889/Terms-and-conditions for more","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"At the end of the benefit period we may extend your current Energy Plan or set you up with a new Energy Plan but only if we have written to you first and you havent told us not to","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.66},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.31},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.66},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1.5},{"plan_id":"origin-ori429274sbe14eme-electricity","cdr_plan_id":"ORI429274SBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":57.31,"off_peak_cents_per_kwh":38.77,"shoulder_cents_per_kwh":49.66,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1870.57,"at_4000_kwh":2335.67,"at_5000_kwh":2800.77,"at_8000_kwh":4196.07},"marginal_rates":{"excess_unit_cost_cents":57.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429274sbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429274SBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.66},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.31},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.66},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1.5},{"plan_id":"origin-ori429275sbe14eme-electricity","cdr_plan_id":"ORI429275SBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":57.31,"off_peak_cents_per_kwh":38.77,"shoulder_cents_per_kwh":49.66,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1870.57,"at_4000_kwh":2335.67,"at_5000_kwh":2800.77,"at_8000_kwh":4196.07},"marginal_rates":{"excess_unit_cost_cents":57.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429275sbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429275SBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.66},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.31},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.66},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1.5},{"plan_id":"origin-ori429254mbe14eme-electricity","cdr_plan_id":"ORI429254MBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":57.31,"off_peak_cents_per_kwh":38.77,"shoulder_cents_per_kwh":49.66,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1870.57,"at_4000_kwh":2335.67,"at_5000_kwh":2800.77,"at_8000_kwh":4196.07},"marginal_rates":{"excess_unit_cost_cents":57.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429254mbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429254MBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.66},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.31},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.66},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1.5},{"plan_id":"origin-ori429247mbe14eme-electricity","cdr_plan_id":"ORI429247MBE14@EME","retailer":"Origin Energy","retailer_slug":"origin","retailer_logo_uri":"https://res.cloudinary.com/originenergy/image/upload/v1667947270/CDR/origin-energy-logo.png","plan_name":"Origin Business Basic","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":130.21,"peak_cents_per_kwh":57.31,"off_peak_cents_per_kwh":38.77,"shoulder_cents_per_kwh":49.66,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1870.57,"at_4000_kwh":2335.67,"at_5000_kwh":2800.77,"at_8000_kwh":4196.07},"marginal_rates":{"excess_unit_cost_cents":57.31,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=origin-ori429247mbe14eme-electricity&source=ai","last_verified":"2025-08-13","source_doc":"CDR EnergyPlanDetailV3 ORI429247MBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Solar FIT","description":"All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"Origin offers 2 cents per kWh exported, subject to eligibility. All amounts are GST-inclusive (if any).","type":"single","rate_cents_per_kwh":2}],"terms":"Not available all areas or property types. Small Business customers only. Visit originenergy.com.au/2889/Terms-and-conditions to find out more.","variation":"We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.","onExpiryDescription":"The agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"You must pay us any charges your distributor imposes on us in relation to services performed by your distributor (or anyone else) at your supply address. For details on additional charges that may apply see www.originenergy.com.au/1612/Additional-charges","fees":[{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is reconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (GST Incl) fee may apply when your property is disconnected (including when you move). Fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"A fee of $15.00 (GST exempt) may apply if your bill is not paid by the due date.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0027","description":"A 0.27% fee (GST Incl) may apply to payments made by VISA debit card.","term":"PERCENT_OF_BILL","rate":"0.0027"},{"type":"PAYMENT_PROCESSING","amount":"2.7","description":"If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.15","description":"$2.15 (incl GST) may apply for each paper bill.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0065","description":"A 0.65% fee (GST Incl) may apply to payments made by VISA credit card.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"CC_PROCESSING","amount":"0.0033","description":"A 0.33% fee (GST Incl) may apply to payments made by Mastercard debit card.","term":"PERCENT_OF_BILL","rate":"0.0033"},{"type":"CC_PROCESSING","amount":"0.0064","description":"A 0.64% fee (GST Incl) may apply to payments made by American Express credit card.","term":"PERCENT_OF_BILL","rate":"0.0064"},{"type":"CC_PROCESSING","amount":"0.0067","description":"A 0.67% fee (GST Incl) may apply to payments made by Mastercard credit card.","term":"PERCENT_OF_BILL","rate":"0.0067"},{"type":"OTHER","amount":"16.69","description":"You may be charged a service order cancellation fee of $16.69 (GST Incl), if you cancel or change your reconnection/disconnection request.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 1.13 cents/kWh 25% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":25,"amount":"0.0113"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.25 cents/kWh 50% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":50,"amount":"0.0225"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.50 cents/kWh 100% of your electricity usage is matched with electricity from Government accredited GreenPower sources","tiers":[{"percentGreen":100,"amount":"0.045"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.66},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.31},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.77},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.66},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.77}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-1.5},{"plan_id":"covau-cov1030375sbe1eme-electricity","cdr_plan_id":"COV1030375SBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"CovaU Basics Business TOU 5-Day CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":118,"peak_cents_per_kwh":61.14,"off_peak_cents_per_kwh":42.25,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1868.21,"at_4000_kwh":2347.38,"at_5000_kwh":2826.55,"at_8000_kwh":4264.06},"marginal_rates":{"excess_unit_cost_cents":61.14,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1030375sbe1eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 COV1030375SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-In Tariff: Single Rate Feed In Tariff","description":"Feed-In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":42.25},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":61.14},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.25}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":42.25}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-2},{"plan_id":"dodo-dod221765sbe9eme-electricity","cdr_plan_id":"DOD221765SBE9@EME","retailer":"Dodo Power & Gas","retailer_slug":"dodo","retailer_logo_uri":"https://s0.2mdn.net/creatives/assets/4983616/Dodo_Logo_Aug23_V1.svg","plan_name":"Business Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.26,"supply_charge_cents_per_day":160.41},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1913.3,"at_4000_kwh":2355.9,"at_5000_kwh":2798.5,"at_8000_kwh":4126.3},"marginal_rates":{"excess_unit_cost_cents":44.26,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=dodo-dod221765sbe9eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 DOD221765SBE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Solar FIT Scheme (DFIT1) & (DFIT1A)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer Feed-in Tariff - This plan is available to eligible small solar customers with a maximum 10kW panel size and an inverter system no greater than 10kW as part of an ongoing contract.","type":"single","rate_cents_per_kwh":1}],"terms":"See our Standing terms and conditions at www.dodo.com/energy/terms-prices-and-regulatory-information.","variation":"We may vary these prices no more than once every 6 months, and provide you notice of any changes at least 5 business days before the change is effective. We will publish variations on our website and in a newspaper at least 10 business days prior.","onExpiryDescription":"Standing contracts do not expire until you notify us in accordance with our Standing Contract Terms and Conditions.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For further details on the information and fees presented, or the terms and conditions of the contract, please visit www.dodo.com/energy/terms-prices-and-regulatory-information or contact us on 13 dodo (13 36 36).","fees":[{"type":"DD_DISHONOUR","amount":"9.5","description":"Dishonoured Payment fee of $9.50 (inc GST) may apply to payments we attempt that are subsequently declined.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move into a property.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move out of a property.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply when moving into your property and connecting electricity to your property.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-2.4},{"plan_id":"dodo-dod221762sbe9eme-electricity","cdr_plan_id":"DOD221762SBE9@EME","retailer":"Dodo Power & Gas","retailer_slug":"dodo","retailer_logo_uri":"https://s0.2mdn.net/creatives/assets/4983616/Dodo_Logo_Aug23_V1.svg","plan_name":"Business Standing","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.26,"supply_charge_cents_per_day":160.41},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":1913.3,"at_4000_kwh":2355.9,"at_5000_kwh":2798.5,"at_8000_kwh":4126.3},"marginal_rates":{"excess_unit_cost_cents":44.26,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=dodo-dod221762sbe9eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 DOD221762SBE9@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Solar FIT Scheme (DFIT1) & (DFIT1A)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer Feed-in Tariff - This plan is available to eligible small solar customers with a maximum 10kW panel size and an inverter system no greater than 10kW as part of an ongoing contract.","type":"single","rate_cents_per_kwh":1}],"terms":"See our Standing terms and conditions at www.dodo.com/energy/terms-prices-and-regulatory-information.","variation":"We may vary these prices no more than once every 6 months, and provide you notice of any changes at least 5 business days before the change is effective. We will publish variations on our website and in a newspaper at least 10 business days prior.","onExpiryDescription":"Standing contracts do not expire until you notify us in accordance with our Standing Contract Terms and Conditions.","billFrequency":["P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For further details on the information and fees presented, or the terms and conditions of the contract, please visit www.dodo.com/energy/terms-prices-and-regulatory-information or contact us on 13 dodo (13 36 36).","fees":[{"type":"DD_DISHONOUR","amount":"9.5","description":"Dishonoured Payment fee of $9.50 (inc GST) may apply to payments we attempt that are subsequently declined.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move into a property.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply each time you request to move out of a property.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A $63.71 (inc GST) fee may apply when moving into your property and connecting electricity to your property.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-2.4},{"plan_id":"energy-locals-retail-lcl1011239sbe1eme-electricity","cdr_plan_id":"LCL1011239SBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":295,"peak_cents_per_kwh":39.09,"off_peak_cents_per_kwh":29.09,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2039.45,"at_4000_kwh":2360.35,"at_5000_kwh":2681.25,"at_8000_kwh":3643.95},"marginal_rates":{"excess_unit_cost_cents":39.09,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl1011239sbe1eme-electricity&source=ai","last_verified":"2025-10-08","source_doc":"CDR EnergyPlanDetailV3 LCL1011239SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT 0: Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.09},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":39.09},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.09}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-2.6},{"plan_id":"energy-locals-retail-lcl987119sbe1eme-electricity","cdr_plan_id":"LCL987119SBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":295,"peak_cents_per_kwh":39.09,"off_peak_cents_per_kwh":29.09,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2039.45,"at_4000_kwh":2360.35,"at_5000_kwh":2681.25,"at_8000_kwh":3643.95},"marginal_rates":{"excess_unit_cost_cents":39.09,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl987119sbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL987119SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.09},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":39.09},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":29.09}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-2.6},{"plan_id":"future-x-fxp791796sbe1eme-electricity","cdr_plan_id":"FXP791796SBE1@EME","retailer":"Future X Power","retailer_slug":"future-x","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/futurex.png","plan_name":"Standing Offer - SAPN - SME Anytime","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":41.71,"supply_charge_cents_per_day":190.05},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1944.98,"at_4000_kwh":2362.08,"at_5000_kwh":2779.18,"at_8000_kwh":4030.48},"marginal_rates":{"excess_unit_cost_cents":41.71,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=future-x-fxp791796sbe1eme-electricity&source=ai","last_verified":"2024-07-09","source_doc":"CDR EnergyPlanDetailV3 FXP791796SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed-in","description":"Solar Feed-in","type":"single","rate_cents_per_kwh":3}],"terms":"For full details on the terms and conditions of the offer, please visit www.futurexpower.com.au or call Future X Power on 1300 599 008","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","onExpiryDescription":"Contract with us continues on an ongoing basis until you choose to terminate it with us or otherwise switch energy providers.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please call on 1300 599 008","fees":[{"type":"DISCONNECTION","amount":"50.00","description":"Disconnection fee (inc. GST), applies for move-out or disconnection requests","term":"FIXED"},{"type":"CONNECTION","amount":"50.00","description":"Connection fee (inc. GST), only applies for move-in requests","term":"FIXED"},{"type":"CHEQUE_DISHONOUR","amount":"15.00","description":"Cheque dishonour payment fee (inc. GST)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"15.00","description":"Direct debit dishonour payment fee (inc. GST)","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-2.7},{"plan_id":"energyaustralia-ene743520sbe13eme-electricity","cdr_plan_id":"ENE743520SBE13@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Standing Offer Business - 7 Day Time of Use Demand","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":147,"peak_cents_per_kwh":59.48,"off_peak_cents_per_kwh":38.31,"shoulder_cents_per_kwh":44.49,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Non Summer: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Non Summer: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Demand Charge","description":"Demand charges are applied to the maximum half hourly kW power reading on all times/days of the week over the last 12 months .  The demand charge is in cents per kW per day.","amount_cents_per_kw":9.87,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1913.46,"at_4000_kwh":2372.43,"at_5000_kwh":2831.4,"at_8000_kwh":4208.31},"marginal_rates":{"excess_unit_cost_cents":59.48,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene743520sbe13eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE743520SBE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","variation":"The rates for Standing Offer Business may vary, either when the AER changes the reference price, or when we review our rates each year. We will notify you before any rate change occurs.","onExpiryDescription":"This contract continues for as long as you remain on the plan.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or Bpay.","fees":[{"type":"LATE_PAYMENT","amount":"10.9","description":"$10.90 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.31},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":44.49},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.48},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":38.31},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.48},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.31}]}]},{"season":"Non Summer (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.31},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":44.49},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":38.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.1},{"plan_id":"energyaustralia-ene743545mbe16eme-electricity","cdr_plan_id":"ENE743545MBE16@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Business Rate Fix  - 7 Day Time of Use Demand","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":147,"peak_cents_per_kwh":59.48,"off_peak_cents_per_kwh":38.31,"shoulder_cents_per_kwh":44.49,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Non Summer: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Non Summer: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Demand Charge","description":"Demand charges are applied to the maximum half hourly kW power reading on all times/days of the week over the last 12 months .  The demand charge is in cents per kW per day.","amount_cents_per_kw":9.87,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1913.46,"at_4000_kwh":2372.43,"at_5000_kwh":2831.4,"at_8000_kwh":4208.31},"marginal_rates":{"excess_unit_cost_cents":59.48,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene743545mbe16eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE743545MBE16@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges.","fees":[{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.31},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":44.49},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.48},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":38.31},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.48},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.31}]}]},{"season":"Non Summer (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.31},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":44.49},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":38.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.1},{"plan_id":"energyaustralia-ene743525mbe15eme-electricity","cdr_plan_id":"ENE743525MBE15@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Business Balance Plan 12 - 7 Day Time of Use Demand","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":147,"peak_cents_per_kwh":59.48,"off_peak_cents_per_kwh":38.31,"shoulder_cents_per_kwh":44.49,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Non Summer: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Non Summer: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Demand Charge","description":"Demand charges are applied to the maximum half hourly kW power reading on all times/days of the week over the last 12 months .  The demand charge is in cents per kW per day.","amount_cents_per_kw":9.87,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":1913.46,"at_4000_kwh":2372.43,"at_5000_kwh":2831.4,"at_8000_kwh":4208.31},"marginal_rates":{"excess_unit_cost_cents":59.48,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene743525mbe15eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE743525MBE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges.","fees":[{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.31},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":44.49},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.48},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":38.31},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":59.48},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.31}]}]},{"season":"Non Summer (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.31},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":44.49},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.31}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":38.31}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.1},{"plan_id":"momentum-mom916053sbe1eme-electricity","cdr_plan_id":"MOM916053SBE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.39,"supply_charge_cents_per_day":163.55},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1928.66,"at_4000_kwh":2372.56,"at_5000_kwh":2816.46,"at_8000_kwh":4148.16},"marginal_rates":{"excess_unit_cost_cents":44.39,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916053sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916053SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.1},{"plan_id":"momentum-mom919583mbe2eme-electricity","cdr_plan_id":"MOM919583MBE2@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Strictly Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":44.4,"supply_charge_cents_per_day":163.5},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1928.78,"at_4000_kwh":2372.78,"at_5000_kwh":2816.78,"at_8000_kwh":4148.77},"marginal_rates":{"excess_unit_cost_cents":44.4,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919583mbe2eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919583MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must have an ABN, communicate with us and receive your bills electronically, have the necessary metering configuration and meet all eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"10% GreenPower included","description":"GreenPower comes with this plan. That means you offset 10% of your electricity usage with renewable energy."}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.1},{"plan_id":"momentum-mom921321mbe3eme-electricity","cdr_plan_id":"MOM921321MBE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Bill Boss Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":226.7,"peak_cents_per_kwh":53.8,"off_peak_cents_per_kwh":30.1,"shoulder_cents_per_kwh":37.5,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri, sat, sun; 10am-3:59pm mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-4:59pm sat, sun","shoulder_hours":"7am-9:59am mon, tue, wed, thu, fri; 4pm-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":1988.16,"at_4000_kwh":2375.05,"at_5000_kwh":2761.96,"at_8000_kwh":3922.66},"marginal_rates":{"excess_unit_cost_cents":53.8,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921321mbe3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921321MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, sign up via our third party sales channels or call Momentum directly, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.1},{"type":"SHOULDER","startHour":7,"endHour":10,"rateCents":37.5},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":30.1},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":37.5},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":53.8},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.1}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":30.1},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":30.1},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":53.8},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":30.1}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.2},{"plan_id":"covau-cov1042147mbe1eme-electricity","cdr_plan_id":"COV1042147MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business TOU","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":112.85,"peak_cents_per_kwh":63.96,"off_peak_cents_per_kwh":42.89,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1888.23,"at_4000_kwh":2380.34,"at_5000_kwh":2872.45,"at_8000_kwh":4348.78},"marginal_rates":{"excess_unit_cost_cents":63.96,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1042147mbe1eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 COV1042147MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":42.89},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":63.96},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.89}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":42.89}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.4},{"plan_id":"covau-cov1041711mbe1eme-electricity","cdr_plan_id":"COV1041711MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business TOU","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":112.85,"peak_cents_per_kwh":63.96,"off_peak_cents_per_kwh":42.89,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1888.23,"at_4000_kwh":2380.34,"at_5000_kwh":2872.45,"at_8000_kwh":4348.78},"marginal_rates":{"excess_unit_cost_cents":63.96,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1041711mbe1eme-electricity&source=ai","last_verified":"2026-03-13","source_doc":"CDR EnergyPlanDetailV3 COV1041711MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 1.65c /kWh inc. GST we ensure energy equal to 30% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":30,"amount":"0.0165"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":42.89},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":63.96},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":42.89}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":42.89}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.4},{"plan_id":"lumo-energy-sa-lum1002054sbe2eme-electricity","cdr_plan_id":"LUM1002054SBE2@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer Flat Rate (TOU Seasonal)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":43.78,"off_peak_cents_per_kwh":43.78,"shoulder_cents_per_kwh":43.78,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum1002054sbe2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM1002054SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.78},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":43.78},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":43.78}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"lumo-energy-sa-lum19143sbe17eme-electricity","cdr_plan_id":"LUM19143SBE17@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.78,"supply_charge_cents_per_day":172.72},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum19143sbe17eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM19143SBE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"lumo-energy-sa-lum23556sbe18eme-electricity","cdr_plan_id":"LUM23556SBE18@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.78,"supply_charge_cents_per_day":172.72},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum23556sbe18eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM23556SBE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"lumo-energy-sa-lum1002050sbe2eme-electricity","cdr_plan_id":"LUM1002050SBE2@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer Flat Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":43.78,"off_peak_cents_per_kwh":43.78,"shoulder_cents_per_kwh":null,"peak_hours":"4pm-7:59pm mon, tue, wed, thu, fri","off_peak_hours":"8pm-3:59pm mon, tue, wed, thu, fri, sat, sun; 4pm-7:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum1002050sbe2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM1002050SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl)? generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":16,"rateCents":43.78},{"type":"PEAK","startHour":16,"endHour":20,"rateCents":43.78},{"type":"OFF_PEAK","startHour":20,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":16,"rateCents":43.78},{"type":"OFF_PEAK","startHour":16,"endHour":20,"rateCents":43.78},{"type":"OFF_PEAK","startHour":20,"endHour":24,"rateCents":43.78}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"lumo-energy-sa-lum1002051sbe2eme-electricity","cdr_plan_id":"LUM1002051SBE2@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer Flat Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":43.78,"off_peak_cents_per_kwh":43.78,"shoulder_cents_per_kwh":null,"peak_hours":"4pm-7:59pm mon, tue, wed, thu, fri","off_peak_hours":"8pm-3:59pm mon, tue, wed, thu, fri, sat, sun; 4pm-7:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum1002051sbe2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM1002051SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":16,"rateCents":43.78},{"type":"PEAK","startHour":16,"endHour":20,"rateCents":43.78},{"type":"OFF_PEAK","startHour":20,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":16,"rateCents":43.78},{"type":"OFF_PEAK","startHour":16,"endHour":20,"rateCents":43.78},{"type":"OFF_PEAK","startHour":20,"endHour":24,"rateCents":43.78}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"lumo-energy-sa-lum1002052sbe2eme-electricity","cdr_plan_id":"LUM1002052SBE2@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer Flat Rate (Seasonal Demand)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":43.78,"off_peak_cents_per_kwh":43.78,"shoulder_cents_per_kwh":43.78,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Time of Use Seasonal Demand (CENT/kVA/DAY)","description":"Maximum Demand: maximum interval consumption over relevant bill period occurring anytime; Billable Maximum demand is the greater of: Bill Demand from bills within 365 days from the end date of the current bill; Network's Peak Demand values within 365 days from the end date of the current bill","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum1002052sbe2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM1002052SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.78},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":43.78},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":43.78}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"red-energy-red21275sbe14eme-electricity","cdr_plan_id":"RED21275SBE14@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.78,"supply_charge_cents_per_day":172.72},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red21275sbe14eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED21275SBE14@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"red-energy-red1002060sbe2eme-electricity","cdr_plan_id":"RED1002060SBE2@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer Flat Rate (Seasonal Demand)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":43.78,"off_peak_cents_per_kwh":43.78,"shoulder_cents_per_kwh":43.78,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Time of Use Seasonal Demand (CENT/kVA/DAY)","description":"Maximum Demand: maximum interval consumption over relevant bill period occurring anytime; Billable Maximum demand is the greater of: Bill Demand from bills within 365 days from the end date of the current bill; Network's Peak Demand values within 365 days from the end date of the current bill","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"TARIFF_PERIOD","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red1002060sbe2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED1002060SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FiT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.78},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":43.78},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":43.78}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"red-energy-red1002057sbe2eme-electricity","cdr_plan_id":"RED1002057SBE2@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer Flat Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":43.78,"off_peak_cents_per_kwh":43.78,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red1002057sbe2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED1002057SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"red-energy-red21276sbe15eme-electricity","cdr_plan_id":"RED21276SBE15@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.78,"supply_charge_cents_per_day":172.72},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red21276sbe15eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED21276SBE15@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"red-energy-red1002055sbe2eme-electricity","cdr_plan_id":"RED1002055SBE2@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer Flat Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":43.78,"off_peak_cents_per_kwh":43.78,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red1002055sbe2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED1002055SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"red-energy-red1002059sbe2eme-electricity","cdr_plan_id":"RED1002059SBE2@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer Flat Rate (TOU Seasonal)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":43.78,"off_peak_cents_per_kwh":43.78,"shoulder_cents_per_kwh":43.78,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":1943.83,"at_4000_kwh":2381.63,"at_5000_kwh":2819.43,"at_8000_kwh":4132.83},"marginal_rates":{"excess_unit_cost_cents":43.78,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red1002059sbe2eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED1002059SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":43.78},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":43.78},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43.78},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":43.78},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43.78}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":43.78}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-3.5},{"plan_id":"ovo-energy-ovo704351mre20eme-electricity","cdr_plan_id":"OVO704351MRE20@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic Free 3 Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":51.66,"supply_charge_cents_per_day":140.7,"free_window_start":"11:00","free_window_end":"14:00","free_window_fraction":0.0898,"original_tariff_type":"time_of_use","peak_cents_per_kwh":51.66,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"11am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Free 3 Rate","discount_percent":9.93,"applies_to":"usage_only","annual_value_at_benchmark":0,"condition_plain_english":"Discount amount stated is an estimate. Actual discount percentage amount will vary depending on customer's actual usage during Free 3 period 11am - 2pm daily. Applies to usage charges only, excludes controlled load."}],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1924.18,"at_4000_kwh":2394.39,"at_5000_kwh":2864.6,"at_8000_kwh":4275.23},"marginal_rates":{"excess_unit_cost_cents":51.66,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704351mre20eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704351MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free 3","description":"Free electricity between 11am and 2pm everyday. For more information head to https://pages.ovoenergy.com.au/the-free-3-plan"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":11,"rateCents":51.66},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":51.66}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-4.1},{"plan_id":"ovo-energy-ovo704350mre20eme-electricity","cdr_plan_id":"OVO704350MRE20@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic Free 3 Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":51.66,"supply_charge_cents_per_day":140.7,"free_window_start":"11:00","free_window_end":"14:00","free_window_fraction":0.0898,"original_tariff_type":"time_of_use","peak_cents_per_kwh":51.66,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"11am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Free 3 Rate","discount_percent":9.93,"applies_to":"usage_only","annual_value_at_benchmark":0,"condition_plain_english":"Discount amount stated is an estimate. Actual discount percentage amount will vary depending on customer's actual usage during Free 3 period 11am - 2pm daily. Applies to usage charges only, excludes controlled load."}],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":1924.18,"at_4000_kwh":2394.39,"at_5000_kwh":2864.6,"at_8000_kwh":4275.23},"marginal_rates":{"excess_unit_cost_cents":51.66,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704350mre20eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704350MRE20@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free 3","description":"Free electricity between 11am and 2pm everyday. For more information head to https://pages.ovoenergy.com.au/the-free-3-plan"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":11,"rateCents":51.66},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":51.66}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-4.1},{"plan_id":"radian-ior1009975mbe1eme-electricity","cdr_plan_id":"IOR1009975MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Smart Business: B2RCL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":181.82,"peak_cents_per_kwh":50.91,"off_peak_cents_per_kwh":40,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1961.83,"at_4000_kwh":2394.56,"at_5000_kwh":2827.29,"at_8000_kwh":4125.48},"marginal_rates":{"excess_unit_cost_cents":50.91,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing; Meter upgrade"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009975mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009975MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":50.91},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":40}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-4.1},{"plan_id":"radian-ior1009970mbe1eme-electricity","cdr_plan_id":"IOR1009970MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Smart Business: B2R","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":181.82,"peak_cents_per_kwh":50.91,"off_peak_cents_per_kwh":40,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1961.83,"at_4000_kwh":2394.56,"at_5000_kwh":2827.29,"at_8000_kwh":4125.48},"marginal_rates":{"excess_unit_cost_cents":50.91,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing; Meter upgrade"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009970mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009970MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":50.91},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":40}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-4.1},{"plan_id":"ovo-energy-ovo934312sbe1eme-electricity","cdr_plan_id":"OVO934312SBE1@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"Basic Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.9,"supply_charge_cents_per_day":176},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1959.4,"at_4000_kwh":2398.4,"at_5000_kwh":2837.4,"at_8000_kwh":4154.4},"marginal_rates":{"excess_unit_cost_cents":43.9,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo934312sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 OVO934312SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-4.2},{"plan_id":"ovo-energy-ovo934309sbe1eme-electricity","cdr_plan_id":"OVO934309SBE1@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"Basic Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":43.9,"supply_charge_cents_per_day":176},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1959.4,"at_4000_kwh":2398.4,"at_5000_kwh":2837.4,"at_8000_kwh":4154.4},"marginal_rates":{"excess_unit_cost_cents":43.9,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo934309sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 OVO934309SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-4.2},{"plan_id":"covau-cov1042148mbe1eme-electricity","cdr_plan_id":"COV1042148MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business TOU Demand","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":158,"peak_cents_per_kwh":61,"off_peak_cents_per_kwh":39,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Peak Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.42,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1944.7,"at_4000_kwh":2400.7,"at_5000_kwh":2856.7,"at_8000_kwh":4224.7},"marginal_rates":{"excess_unit_cost_cents":61,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1042148mbe1eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 COV1042148MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":39},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":61},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":39}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-4.3},{"plan_id":"covau-cov1041712mbe1eme-electricity","cdr_plan_id":"COV1041712MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business TOU Demand","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":158,"peak_cents_per_kwh":61,"off_peak_cents_per_kwh":39,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Peak Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.42,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1944.7,"at_4000_kwh":2400.7,"at_5000_kwh":2856.7,"at_8000_kwh":4224.7},"marginal_rates":{"excess_unit_cost_cents":61,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1041712mbe1eme-electricity&source=ai","last_verified":"2026-03-13","source_doc":"CDR EnergyPlanDetailV3 COV1041712MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 1.65c /kWh inc. GST we ensure energy equal to 30% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":30,"amount":"0.0165"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":39},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":61},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":39}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-4.3},{"plan_id":"flipped-fea1059482sre1eme-electricity","cdr_plan_id":"FEA1059482SRE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Anytime Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.11,"supply_charge_cents_per_day":264.34},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":2048.14,"at_4000_kwh":2409.24,"at_5000_kwh":2770.34,"at_8000_kwh":3853.64},"marginal_rates":{"excess_unit_cost_cents":36.11,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059482sre1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059482SRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-4.7},{"plan_id":"covau-cov1030376sbe1eme-electricity","cdr_plan_id":"COV1030376SBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"CovaU Basics Business TOU","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":118,"peak_cents_per_kwh":61.96,"off_peak_cents_per_kwh":44.5,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1922.84,"at_4000_kwh":2420.22,"at_5000_kwh":2917.6,"at_8000_kwh":4409.74},"marginal_rates":{"excess_unit_cost_cents":61.96,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1030376sbe1eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 COV1030376SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-In Tariff: Single Rate Feed In Tariff","description":"Feed-In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.5},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":61.96},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.5}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":44.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-5.2},{"plan_id":"radian-ior1009962mre1eme-electricity","cdr_plan_id":"IOR1009962MRE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Sustainable Home: RSRCL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":47.27,"supply_charge_cents_per_day":150},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1965.6,"at_4000_kwh":2438.3,"at_5000_kwh":2911,"at_8000_kwh":4329.1},"marginal_rates":{"excess_unit_cost_cents":47.27,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing; Meter upgrade"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009962mre1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009962MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-6},{"plan_id":"radian-ior1009976mre1eme-electricity","cdr_plan_id":"IOR1009976MRE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Sustainable Home: RSR","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":47.27,"supply_charge_cents_per_day":150},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":1965.6,"at_4000_kwh":2438.3,"at_5000_kwh":2911,"at_8000_kwh":4329.1},"marginal_rates":{"excess_unit_cost_cents":47.27,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing; Meter upgrade"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009976mre1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009976MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-6},{"plan_id":"covau-cov1042144mbe1eme-electricity","cdr_plan_id":"COV1042144MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business Single  + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":52.06,"supply_charge_cents_per_day":98},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1919.5,"at_4000_kwh":2440.1,"at_5000_kwh":2960.7,"at_8000_kwh":4522.5},"marginal_rates":{"excess_unit_cost_cents":52.06,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1042144mbe1eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 COV1042144MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-6},{"plan_id":"covau-cov1042143mbe1eme-electricity","cdr_plan_id":"COV1042143MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business Single","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":52.06,"supply_charge_cents_per_day":98},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1919.5,"at_4000_kwh":2440.1,"at_5000_kwh":2960.7,"at_8000_kwh":4522.5},"marginal_rates":{"excess_unit_cost_cents":52.06,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1042143mbe1eme-electricity&source=ai","last_verified":"2026-03-19","source_doc":"CDR EnergyPlanDetailV3 COV1042143MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-6},{"plan_id":"covau-cov1041707mbe1eme-electricity","cdr_plan_id":"COV1041707MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business Single","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":52.06,"supply_charge_cents_per_day":98},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1919.5,"at_4000_kwh":2440.1,"at_5000_kwh":2960.7,"at_8000_kwh":4522.5},"marginal_rates":{"excess_unit_cost_cents":52.06,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1041707mbe1eme-electricity&source=ai","last_verified":"2026-03-13","source_doc":"CDR EnergyPlanDetailV3 COV1041707MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 1.65c /kWh inc. GST we ensure energy equal to 30% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":30,"amount":"0.0165"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-6},{"plan_id":"covau-cov1041708mbe1eme-electricity","cdr_plan_id":"COV1041708MBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"Freedom Business Single + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":52.06,"supply_charge_cents_per_day":98},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":5.5,"annual_cost_estimates":{"at_3000_kwh":1919.5,"at_4000_kwh":2440.1,"at_5000_kwh":2960.7,"at_8000_kwh":4522.5},"marginal_rates":{"excess_unit_cost_cents":52.06,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1041708mbe1eme-electricity&source=ai","last_verified":"2026-03-13","source_doc":"CDR EnergyPlanDetailV3 COV1041708MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed In Tariff: Single Rate Feed In Tariff","description":"Feed In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":5.5}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0073","description":"A 0.73% (inc. GST) fee may apply to payments made by debit and credit cards.","term":"PERCENT_OF_BILL","rate":"0.0073"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 1.65c /kWh inc. GST we ensure energy equal to 30% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":30,"amount":"0.0165"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 2.75c /kWh inc. GST we ensure energy equal to 50% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an extra 5.5c /kWh inc. GST we ensure energy equal to 100% of your usage will be accredited renewable energy from the grid from GreenPower Providers. No discount will apply to the GreenPower component. Please contact us on 1300 689 866 for more information.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-6},{"plan_id":"momentum-mom919642mbe6eme-electricity","cdr_plan_id":"MOM919642MBE6@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Pure Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":331.7,"peak_cents_per_kwh":38.2,"off_peak_cents_per_kwh":26.6,"shoulder_cents_per_kwh":32.5,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Anytime Demand ($/kVA/day)","description":"Anytime Maximum demand charge based on highest half-hour demand during the last 12 months.","amount_cents_per_kw":8.42,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":2148.51,"at_4000_kwh":2461.11,"at_5000_kwh":2773.71,"at_8000_kwh":3711.51},"marginal_rates":{"excess_unit_cost_cents":38.2,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919642mbe6eme-electricity&source=ai","last_verified":"2026-05-20","source_doc":"CDR EnergyPlanDetailV3 MOM919642MBE6@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must have an ABN, communicate with us and receive your bills electronically, have the necessary metering configuration and meet all eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":26.6},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":32.5},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":38.2},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":26.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":26.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":38.2},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":26.6}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":26.6},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":32.5},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":26.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":26.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-7},{"plan_id":"alinta-ali463785mbe12eme-electricity","cdr_plan_id":"ALI463785MBE12@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"BusinessDeal On - Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.09,"peak_cents_per_kwh":66.85,"off_peak_cents_per_kwh":44.45,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1951.53,"at_4000_kwh":2463.23,"at_5000_kwh":2974.93,"at_8000_kwh":4510.03},"marginal_rates":{"excess_unit_cost_cents":66.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali463785mbe12eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI463785MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.45},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":66.85},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.45}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.45},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":44.45},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.45}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-7.1},{"plan_id":"alinta-ali463786mbe12eme-electricity","cdr_plan_id":"ALI463786MBE12@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"BusinessDeal On - Time of Use + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":114.09,"peak_cents_per_kwh":66.85,"off_peak_cents_per_kwh":44.45,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1951.53,"at_4000_kwh":2463.23,"at_5000_kwh":2974.93,"at_8000_kwh":4510.03},"marginal_rates":{"excess_unit_cost_cents":66.85,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali463786mbe12eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI463786MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.45},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":66.85},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.45}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.45},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":44.45},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.45}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-7.1},{"plan_id":"lumo-energy-sa-lum145292sbe13eme-electricity","cdr_plan_id":"LUM145292SBE13@EME","retailer":"Lumo Energy (SA)","retailer_slug":"lumo-energy-sa","retailer_logo_uri":"https://www.lumoenergy.com.au/assets/images/logo--lumo.svg","plan_name":"Standing Offer (TOU Seasonal)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":57.96,"off_peak_cents_per_kwh":44.35,"shoulder_cents_per_kwh":33.12,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":2016.04,"at_4000_kwh":2477.91,"at_5000_kwh":2939.78,"at_8000_kwh":4325.39},"marginal_rates":{"excess_unit_cost_cents":57.96,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=lumo-energy-sa-lum145292sbe13eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 LUM145292SBE13@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Retailer contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.lumoenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.lumoenergy.com.au/metering-and-solar/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"For the full schedule of fees applicable to this offer, please visit http://www.lumoenergy.com.au/help-centre/fee-schedule-sa or call us on 1300 11 58 66.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) generally applies for any move-in request","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request","term":"FIXED"}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.35},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":33.12},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.96},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.35}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":44.35},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.96},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.35}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.35},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":33.12},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.35}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":44.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-7.7},{"plan_id":"red-energy-red145171sbe11eme-electricity","cdr_plan_id":"RED145171SBE11@EME","retailer":"Red Energy","retailer_slug":"red-energy","retailer_logo_uri":"https://www.redenergy.com.au/assets/img/logo-red-energy.png","plan_name":"Standing Offer (TOU Seasonal)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":172.72,"peak_cents_per_kwh":57.96,"off_peak_cents_per_kwh":44.35,"shoulder_cents_per_kwh":33.12,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Winter: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Winter: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":2016.04,"at_4000_kwh":2477.91,"at_5000_kwh":2939.78,"at_8000_kwh":4325.39},"marginal_rates":{"excess_unit_cost_cents":57.96,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=red-energy-red145171sbe11eme-electricity&source=ai","last_verified":"2026-02-26","source_doc":"CDR EnergyPlanDetailV3 RED145171SBE11@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar feed-in tariffs (FIT)","description":"Red Energy FIT - GST included if any","type":"single","rate_cents_per_kwh":2},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Government contribution","description":"Government contribution (GST inc. if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer is available to small business customers currently within the SA Power Networks distribution zone with applicable network tariff. Please visit www.redenergy.com.au/terms for full T&Cs applicable to this offer. Solar Feed-In T&Cs can be found at www.redenergy.com.au/solar-feed-in-tariffs. All times are ACST, unless you have an interval meter, in which case daylight savings time will apply.","variation":"We may vary our standing offer rates no more than once every six months. If we vary our rates, we will publish the variation in a newspaper and on our website at least 10 business days prior to the effective date. If we vary our rates, we will also provide you written notice of at least 5 business days prior to the variation.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"The fees and charges listed in the Fees and Charges section above apply to the standard move in and move out requests. For details on our additional fees and charges, please visit https://www.redenergy.com.au/additional-service-charges-sa or contact us on 131 806.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee (GST incl) for standard move in requests during business hours. Fees may vary. See Additional Fee Information for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee (GST incl) generally applies for any move-out request. Fees may vary. See Additional Fee Information for details.","term":"FIXED"}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.35},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":33.12},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.96},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.35}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":44.35},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.96},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.35}]}]},{"season":"Winter (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.35},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":33.12},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.35}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":44.35}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-7.7},{"plan_id":"energyaustralia-ene252034mbe27eme-electricity","cdr_plan_id":"ENE252034MBE27@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Business Balance Plan 12 - 7 Day Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":147,"peak_cents_per_kwh":64.34,"off_peak_cents_per_kwh":39.6,"shoulder_cents_per_kwh":49.72,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Non Summer: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Non Summer: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":2007.93,"at_4000_kwh":2498.39,"at_5000_kwh":2988.85,"at_8000_kwh":4460.23},"marginal_rates":{"excess_unit_cost_cents":64.34,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene252034mbe27eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE252034MBE27@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","variation":"Prices may be varied in line with your terms and conditions. We will give you notice before any new prices take effect.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges.","fees":[{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":39.6},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.72},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":64.34},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":39.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":64.34},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39.6}]}]},{"season":"Non Summer (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":39.6},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.72},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":39.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-8.6},{"plan_id":"energyaustralia-ene234198mbe26eme-electricity","cdr_plan_id":"ENE234198MBE26@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Business Rate Fix  - 7 Day Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":147,"peak_cents_per_kwh":64.34,"off_peak_cents_per_kwh":39.6,"shoulder_cents_per_kwh":49.72,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Non Summer: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Non Summer: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":2007.93,"at_4000_kwh":2498.39,"at_5000_kwh":2988.85,"at_8000_kwh":4460.23},"marginal_rates":{"excess_unit_cost_cents":64.34,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene234198mbe26eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE234198MBE26@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","onExpiryDescription":"The Benefit Period for this plan is 12 months. We will provide you with notice of your options prior to the end of the Benefit Period. Your contract will continue until it is ended by either party.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges.","fees":[{"type":"LATE_PAYMENT","amount":"12.00","description":"$12.00 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":39.6},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.72},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":64.34},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":39.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":64.34},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39.6}]}]},{"season":"Non Summer (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":39.6},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.72},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":39.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-8.6},{"plan_id":"energyaustralia-ene120649sbe21eme-electricity","cdr_plan_id":"ENE120649SBE21@EME","retailer":"EnergyAustralia","retailer_slug":"energyaustralia","retailer_logo_uri":"https://www.energyaustralia.com.au/themes/custom/ea/assets/images/EA_logo.svg","plan_name":"Standing Offer Business - 7 Day Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":147,"peak_cents_per_kwh":64.34,"off_peak_cents_per_kwh":39.6,"shoulder_cents_per_kwh":49.72,"peak_hours":"Summer: 5pm-8:59pm mon, tue, wed, thu, fri; 5pm-8:59pm sat, sun","off_peak_hours":"Summer: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Non Summer: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Summer: 7am-4:59pm mon, tue, wed, thu, fri · Non Summer: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3.3,"annual_cost_estimates":{"at_3000_kwh":2007.93,"at_4000_kwh":2498.39,"at_5000_kwh":2988.85,"at_8000_kwh":4460.23},"marginal_rates":{"excess_unit_cost_cents":64.34,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energyaustralia-ene120649sbe21eme-electricity&source=ai","last_verified":"2026-05-18","source_doc":"CDR EnergyPlanDetailV3 ENE120649SBE21@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","description":"EnergyAustralia Retailer Feed-in Tariff (incl. GST if any)","type":"single","rate_cents_per_kwh":3.3},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 31/08/2010","description":"Solar Feed-In Scheme pre 31/08/2010","type":"single","rate_cents_per_kwh":44},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","description":"Solar Feed-In Scheme pre 30/09/2011, first 45kWh per day","type":"single","rate_cents_per_kwh":44}],"terms":"Quarterly billing unless monthly billing is applied for eligible customers. Further information regarding billing frequency is available at https://www.energyaustralia.com.au/business/help-and-support/faqs/accounts-bills-and-payments. Please refer to www.energyaustralia.com.au for eligibility information relating to solar, as well as full terms and conditions.","variation":"The rates for Standing Offer Business may vary, either when the AER changes the reference price, or when we review our rates each year. We will notify you before any rate change occurs.","onExpiryDescription":"This contract continues for as long as you remain on the plan.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","BPAY","CREDIT_CARD"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Additional fees and charges may apply. Please refer to www.energyaustralia.com.au/conditions-and-pricing/other-charges. You can avoid the payment processing fees by paying from your bank account using direct debit or Bpay.","fees":[{"type":"LATE_PAYMENT","amount":"10.9","description":"$10.90 (GST does not currently apply to late payment fees).","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0036","description":"Credit card merchant service fee of 0.36% for all payments with Visa or Mastercard.","term":"PERCENT_OF_BILL","rate":"0.0036"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card merchant service fee of 1.5% for all payments with American Express.","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"DISCONNECTION","amount":"63.71","description":"A disconnection fee may apply  (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"A reconnection fee may apply (incl. moving or reading your meter). Fees may vary and see additional fee information for details.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A connection fee may apply when you move into a property.  Fees may vary and see additional fee information for more details.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 10% = $0.0495 x (10% x total usage)","tiers":[{"percentGreen":10,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 25% = $0.0495 x (25% x total usage)","tiers":[{"percentGreen":25,"amount":"0.0495"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"PureEnergy 100% = $0.0495 per kWh","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"Summer (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":39.6},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.72},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":64.34},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":39.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":64.34},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39.6}]}]},{"season":"Non Summer (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":39.6},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.72},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":39.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":39.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-8.6},{"plan_id":"momentum-mom921319mbe3eme-electricity","cdr_plan_id":"MOM921319MBE3@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Bill Boss Electricity","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":331.7,"peak_cents_per_kwh":39.4,"off_peak_cents_per_kwh":27.4,"shoulder_cents_per_kwh":33.5,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Anytime Demand ($/kVA/day)","description":"Anytime Maximum demand charge based on highest half-hour demand during the last 12 months.","amount_cents_per_kw":8.42,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":2177.3,"at_4000_kwh":2499.51,"at_5000_kwh":2821.71,"at_8000_kwh":3788.31},"marginal_rates":{"excess_unit_cost_cents":39.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom921319mbe3eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM921319MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must communicate with us and receive your bills electronically, sign up via our third party sales channels or call Momentum directly, have the necessary meter configuration and meet all other eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For an added 4.95 c/kWh incl. GST, you can purchase GreenPower for either 10, 20, 25, 50, 75 or 100% of your usage.","tiers":[{"percentGreen":100,"amount":"0.0495"}]}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.4},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":33.5},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":39.4},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.4}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":27.4},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":39.4},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.4}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":27.4},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":33.5},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":27.4}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":27.4}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-8.6},{"plan_id":"radian-ior1009971mbe1eme-electricity","cdr_plan_id":"IOR1009971MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Smart Business: SBTOU","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":181.82,"peak_cents_per_kwh":77.27,"off_peak_cents_per_kwh":32.73,"shoulder_cents_per_kwh":31.82,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-6:59am mon, tue, wed, thu, fri; 12am-4:59pm sat, sun","shoulder_hours":"7am-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2040.94,"at_4000_kwh":2500.04,"at_5000_kwh":2959.14,"at_8000_kwh":4336.44},"marginal_rates":{"excess_unit_cost_cents":77.27,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009971mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009971MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Off-peak","description":"Daytime Usage - Everyday - 10:00am–3:59pm","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":-2,"hours":"10am-3:59pm","startHour":10,"endHour":16}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Peak","description":"Evening Usage - Everyday - 6:00pm–8:59pm","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":18,"hours":"6pm-8:59pm","startHour":18,"endHour":21}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Shoulder","description":"Other Usage - Everyday - All other times","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":0,"endHour":10},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":16,"endHour":18},{"type":"SHOULDER","rate_cents_per_kwh":4,"hours":"12am-9:59am, 4pm-5:59pm, 9pm-11:59pm","startHour":21,"endHour":24}]}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":32.73},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":31.82},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":77.27},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.73}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":32.73},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":77.27},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":32.73}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-8.7},{"plan_id":"blue-nrg-blu940564sbe1eme-electricity","cdr_plan_id":"BLU940564SBE1@EME","retailer":"Blue NRG","retailer_slug":"blue-nrg","retailer_logo_uri":"https://www.bluenrg.com.au/wp-content/uploads/2024/02/Blue-NRGLogo-Inverted-RGB-1200px-W-72ppi.png","plan_name":"DMO FY25-26","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":42.09,"supply_charge_cents_per_day":226.9},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":2090.89,"at_4000_kwh":2511.79,"at_5000_kwh":2932.69,"at_8000_kwh":4195.39},"marginal_rates":{"excess_unit_cost_cents":42.09,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Tariff type"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=blue-nrg-blu940564sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 BLU940564SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FiT","description":"Solar FiT","type":"single","rate_cents_per_kwh":2}],"terms":"This offer applies to customers with an applicable network tariff. For full terms and conditions, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","variation":"Rates may vary if a cost has or is expected to increase. It will reflect the increase and not exceed what we consider necessary. We may review and reset rates at our discretion with advance notice. For full terms and conditions, visit www.bluenrg.com.au.","onExpiryDescription":"Your contract is ongoing until it is ended by you or us.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["BPAY","CREDIT_CARD","DIRECT_DEBIT","PAPER_BILL"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, visit our website at https://www.bluenrg.com.au/rates_and_pricing or contact Blue NRG on 1300 599 888.","fees":[{"type":"CONNECTION","amount":"60.94","description":"Move In - Connection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"60.94","description":"Move Out - Disconnection Fee,Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"60.94","description":"Reconnection Fee (Business Hours),Includes GST. Fees may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.98","description":"DD Dishonour Fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - Visa / Mastercard","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"CC_PROCESSING","amount":"0.0097","description":"Merchant Fee - AMEX /JCB","term":"PERCENT_OF_BILL","rate":"0.0097"},{"type":"PAPER_BILL","amount":"5.5","description":"Paper Bill Fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-9.2},{"plan_id":"alinta-ali13153sbe19eme-electricity","cdr_plan_id":"ALI13153SBE19@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SME Standing Offer - Time of Use + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":116.42,"peak_cents_per_kwh":68.21,"off_peak_cents_per_kwh":45.36,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1991.38,"at_4000_kwh":2513.53,"at_5000_kwh":3035.68,"at_8000_kwh":4602.13},"marginal_rates":{"excess_unit_cost_cents":68.21,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali13153sbe19eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI13153SBE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":45.36},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":68.21},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":45.36}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":45.36},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":45.36},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":45.36}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-9.2},{"plan_id":"alinta-ali13161sbe17eme-electricity","cdr_plan_id":"ALI13161SBE17@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SME Standing Offer - Time of Use","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":116.42,"peak_cents_per_kwh":68.21,"off_peak_cents_per_kwh":45.36,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":1991.38,"at_4000_kwh":2513.53,"at_5000_kwh":3035.68,"at_8000_kwh":4602.13},"marginal_rates":{"excess_unit_cost_cents":68.21,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali13161sbe17eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI13161SBE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":45.36},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":68.21},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":45.36}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":45.36},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":45.36},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":45.36}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-9.2},{"plan_id":"energy-locals-retail-lcl987128sbe1eme-electricity","cdr_plan_id":"LCL987128SBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.82,"supply_charge_cents_per_day":295},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2181.35,"at_4000_kwh":2549.55,"at_5000_kwh":2917.75,"at_8000_kwh":4022.35},"marginal_rates":{"excess_unit_cost_cents":36.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl987128sbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL987128SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-10.8},{"plan_id":"energy-locals-retail-lcl987125sbe1eme-electricity","cdr_plan_id":"LCL987125SBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":295,"peak_cents_per_kwh":53.64,"off_peak_cents_per_kwh":29.09,"shoulder_cents_per_kwh":36.82,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 10am-3:59pm mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-4:59pm sat, sun; 9pm-11:59pm sat, sun","shoulder_hours":"7am-9:59am mon, tue, wed, thu, fri; 4pm-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2216.78,"at_4000_kwh":2596.79,"at_5000_kwh":2976.8,"at_8000_kwh":4116.83},"marginal_rates":{"excess_unit_cost_cents":53.64,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl987125sbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL987125SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":29.09},{"type":"SHOULDER","startHour":7,"endHour":10,"rateCents":36.82},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":29.09},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":36.82},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":53.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":29.09},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":53.64},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":29.09}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-12.9},{"plan_id":"covau-cov1030377sbe1eme-electricity","cdr_plan_id":"COV1030377SBE1@EME","retailer":"COVAU PTY LIMITED","retailer_slug":"covau","retailer_logo_uri":"https://covau.com.au/wp-content/uploads/2022/01/covau-logo-300.png","plan_name":"CovaU Basics Business TOU Demand","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":168,"peak_cents_per_kwh":65,"off_peak_cents_per_kwh":43,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Peak Demand","description":"Demand Charge  All kVA (c/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":8.42,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2101.2,"at_4000_kwh":2597.2,"at_5000_kwh":3093.2,"at_8000_kwh":4581.2},"marginal_rates":{"excess_unit_cost_cents":65,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=covau-cov1030377sbe1eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 COV1030377SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed-In Tariff: Single Rate Feed In Tariff","description":"Feed-In Tariff | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"See our full terms and conditions to www.covau.com.au for details.","variation":"We may vary the charges of this plan (including their amount, nature and structure) at any time by giving you a notice at least 5 business days prior to the effective date of variation.All prices listed are inclusive of GST except where indicated.","onExpiryDescription":"This agreement continues until you or we end it.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For information on additional fees, please visit our website : www.covau.com.au","fees":[{"type":"CONNECTION","amount":"21.23","description":"$21.23 (inc. GST) Special Meter Read fee. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is disconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.712","description":"$63.71 (inc. GST) fee may apply when your property is reconnected. This fee is passed through from your distributor and may vary.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"2.75","description":"$2.75 (inc. GST) (inc. GST) Direct Credit or Debit dishonour payment fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":43},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":65},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":43}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":43}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-12.9},{"plan_id":"globird-glo1059220mre1eme-electricity","cdr_plan_id":"GLO1059220MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"ZEROHERO VPP Residential (Flexible Rate CTL)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":55,"supply_charge_cents_per_day":170,"free_window_start":"11:00","free_window_end":"14:00","free_window_fraction":0.0898,"original_tariff_type":"time_of_use","peak_cents_per_kwh":55,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"11am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"ZEROHERO","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$1/Day when imports are 0.03 kWh/hour or less, between 6pm-9pm (Local Time). Up to $365 per year."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2122.33,"at_4000_kwh":2622.94,"at_5000_kwh":3123.55,"at_8000_kwh":4625.38},"marginal_rates":{"excess_unit_cost_cents":55,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1059220mre1eme-electricity&source=ai","last_verified":"2026-05-25","source_doc":"CDR EnergyPlanDetailV3 GLO1059220MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird feed-in between 4pm and 11pm (incl. GST if any).","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":2,"hours":"4pm-10:59pm","startHour":16,"endHour":23}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird feed-in for all other time (incl. GST if any).","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":23,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":0,"endHour":16}]}],"terms":"This offer is restricted plan and is not available to all customers. This offer is for SA residential customers who have a Qualifying System and must meet and remain compliant with the Eligibility Criteria and all other requirements of the Virtual Power Plant Terms and Conditions. For further information about this offer call GloBird on 133456 or visit www.globirdenergy.com.au to see our full terms and conditions.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Perfect if you love free stuff","description":"$0.00 for consumption between 11am-2pm (Local Time), excluding controlled load."},{"category":"OTHER","displayName":"ZEROHERO Credit","description":"$1/Day when imports are 0.03 kWh/hour or less, between 6pm-9pm (Local Time)."},{"category":"OTHER","displayName":"Super Export Credit","description":"15 cents/kWh applies to the first 15 kWh of exports between 6pm-9pm (Local Time) everyday, and is inclusive of any other Feed-in tariff as applicable in Energy Plan."},{"category":"OTHER","displayName":"Critical Peak-Export Credit","description":"$1/kWh applies to any export during a Critical Peak-Export event. The timing of these events is determined at our discretion, as detailed in a notice we provide. Your premises' metering installation must support 5-minute interval data."},{"category":"OTHER","displayName":"Critical Peak-Import Credit","description":"5 cents/kWh applies to any import during a Critical Peak-Import event. The timing of these events is determined at our discretion, as detailed in a notice we provide. Your premises' metering installation must support 5-minute interval data."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":11,"rateCents":55},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":55}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-14},{"plan_id":"globird-glo1059219mre1eme-electricity","cdr_plan_id":"GLO1059219MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"ZEROHERO VPP Residential (Flexible Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":55,"supply_charge_cents_per_day":170,"free_window_start":"11:00","free_window_end":"14:00","free_window_fraction":0.0898,"original_tariff_type":"time_of_use","peak_cents_per_kwh":55,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"11am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"ZEROHERO","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"$1/Day when imports are 0.03 kWh/hour or less, between 6pm-9pm (Local Time). Up to $365 per year."}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2122.33,"at_4000_kwh":2622.94,"at_5000_kwh":3123.55,"at_8000_kwh":4625.38},"marginal_rates":{"excess_unit_cost_cents":55,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":true,"compatible_meter_types":["type_4","type_4a"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1059219mre1eme-electricity&source=ai","last_verified":"2026-05-25","source_doc":"CDR EnergyPlanDetailV3 GLO1059219MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird feed-in between 4pm and 11pm (incl. GST if any).","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":2,"hours":"4pm-10:59pm","startHour":16,"endHour":23}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird feed-in for all other time (incl. GST if any).","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":23,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":0,"endHour":16}]}],"terms":"This offer is restricted plan and is not available to all customers. This offer is for SA residential customers who have a Qualifying System and must meet and remain compliant with the Eligibility Criteria and all other requirements of the Virtual Power Plant Terms and Conditions. For further information about this offer call GloBird on 133456 or visit www.globirdenergy.com.au to see our full terms and conditions.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Perfect if you love free stuff","description":"$0.00 for consumption between 11am-2pm (Local Time), excluding controlled load."},{"category":"OTHER","displayName":"ZEROHERO Credit","description":"$1/Day when imports are 0.03 kWh/hour or less, between 6pm-9pm (Local Time)."},{"category":"OTHER","displayName":"Super Export Credit","description":"15 cents/kWh applies to the first 15 kWh of exports between 6pm-9pm (Local Time) everyday, and is inclusive of any other Feed-in tariff as applicable in Energy Plan."},{"category":"OTHER","displayName":"Critical Peak-Export Credit","description":"$1/kWh applies to any export during a Critical Peak-Export event. The timing of these events is determined at our discretion, as detailed in a notice we provide. Your premises' metering installation must support 5-minute interval data."},{"category":"OTHER","displayName":"Critical Peak-Import Credit","description":"5 cents/kWh applies to any import during a Critical Peak-Import event. The timing of these events is determined at our discretion, as detailed in a notice we provide. Your premises' metering installation must support 5-minute interval data."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":11,"rateCents":55},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":55}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-14},{"plan_id":"sumo-sum926368sbe3eme-electricity","cdr_plan_id":"SUM926368SBE3@EME","retailer":"Sumo","retailer_slug":"sumo","retailer_logo_uri":"https://sumo-public-share.s3.ap-southeast-2.amazonaws.com/SumoIT/URI/Sumo_Logo.png","plan_name":"Sumo Standing Offer TOU + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":173.6,"peak_cents_per_kwh":61.6,"off_peak_cents_per_kwh":44.8,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri; 12am-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2128.84,"at_4000_kwh":2627.24,"at_5000_kwh":3125.64,"at_8000_kwh":4620.84},"marginal_rates":{"excess_unit_cost_cents":61.6,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"you meet our requirements"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=sumo-sum926368sbe3eme-electricity&source=ai","last_verified":"2025-07-10","source_doc":"CDR EnergyPlanDetailV3 SUM926368SBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed in Tariff","description":"If you have installed solar PV at the Premises, you may be eligible to be paid for excess electricity you feed back into the grid. Maximum system size of 10KW.","type":"single","rate_cents_per_kwh":0}],"terms":"Offer not available in all areas or properties. You must be a Small Business customer with an applicable network tariff for a premises where Sumo supplies Electricity. Please refer to our website https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions for full terms and conditions.","variation":"Prices, fees and charges are subject to change. We will give you at least 5 business days prior notice.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 5","Type 4"],"additionalFeeInformation":"We will pass through any fee imposed by your distributor, including fees for disconnection or reconnection, or special meter read on move-out. Distributor fees published at sumo.com.au/other-fees-and-charges. Fee applied to your next bill.","fees":[{"type":"OTHER","amount":"2.75","description":"Dishonoured Payment Fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A standard connection fee of $63.71 (ex GST) applies when you requested a connection of your electricity supply during standard business hours (Monday to Friday, excluding public holidays) when the site is already connected. All fees are subject to change and may vary depending on your distribution network or specific property requirements. Additional charges may apply for urgent, after-hours, or complex connections.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.007","description":"This fee is only applicable for payments made by credit card.","term":"PERCENT_OF_BILL","rate":"0.007"},{"type":"PAPER_BILL","amount":"3.1","description":"Bills can be issued by email for no cost, or alternatively by post at a cost of $3.10 (inc GST) per bill.","term":"FIXED"},{"type":"OTHER","amount":"2.00","description":"Over the counter fee at Australia Post","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.8},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":61.6},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.8}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":44.8}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-14.2},{"plan_id":"sumo-sum926367sbe3eme-electricity","cdr_plan_id":"SUM926367SBE3@EME","retailer":"Sumo","retailer_slug":"sumo","retailer_logo_uri":"https://sumo-public-share.s3.ap-southeast-2.amazonaws.com/SumoIT/URI/Sumo_Logo.png","plan_name":"Sumo Standing Offer TOU","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":173.6,"peak_cents_per_kwh":61.6,"off_peak_cents_per_kwh":44.8,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-11:59pm mon, tue, wed, thu, fri; 12am-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2128.84,"at_4000_kwh":2627.24,"at_5000_kwh":3125.64,"at_8000_kwh":4620.84},"marginal_rates":{"excess_unit_cost_cents":61.6,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"you meet our requirements"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=sumo-sum926367sbe3eme-electricity&source=ai","last_verified":"2025-07-10","source_doc":"CDR EnergyPlanDetailV3 SUM926367SBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed in Tariff","description":"If you have installed solar PV at the Premises, you may be eligible to be paid for excess electricity you feed back into the grid. Maximum system size of 10KW.","type":"single","rate_cents_per_kwh":0}],"terms":"Offer not available in all areas or properties. You must be a Small Business customer with an applicable network tariff for a premises where Sumo supplies Electricity. Please refer to our website https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions for full terms and conditions.","variation":"Prices, fees and charges are subject to change. We will give you at least 5 business days prior notice.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 5","Type 4"],"additionalFeeInformation":"We will pass through any fee imposed by your distributor, including fees for disconnection or reconnection, or special meter read on move-out. Distributor fees published at sumo.com.au/other-fees-and-charges. Fee applied to your next bill.","fees":[{"type":"OTHER","amount":"2.75","description":"Dishonoured Payment Fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A standard connection fee of $63.71 (ex GST) applies when you requested a connection of your electricity supply during standard business hours (Monday to Friday, excluding public holidays) when the site is already connected. All fees are subject to change and may vary depending on your distribution network or specific property requirements. Additional charges may apply for urgent, after-hours, or complex connections.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.007","description":"This fee is only applicable for payments made by credit card.","term":"PERCENT_OF_BILL","rate":"0.007"},{"type":"PAPER_BILL","amount":"3.1","description":"Bills can be issued by email for no cost, or alternatively by post at a cost of $3.10 (inc GST) per bill.","term":"FIXED"},{"type":"OTHER","amount":"2.00","description":"Over the counter fee at Australia Post","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.8},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":61.6},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.8}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":44.8}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-14.2},{"plan_id":"globird-glo1054023mre1eme-electricity","cdr_plan_id":"GLO1054023MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"FOUR4FREE Residential (Flexible Rate)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":60.5,"supply_charge_cents_per_day":140,"free_window_start":"10:00","free_window_end":"14:00","free_window_fraction":0.1213,"original_tariff_type":"time_of_use","peak_cents_per_kwh":60.5,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2105.84,"at_4000_kwh":2637.45,"at_5000_kwh":3169.07,"at_8000_kwh":4763.91},"marginal_rates":{"excess_unit_cost_cents":60.5,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054023mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054023MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird currently pay 5.00 cents/kWh solar feed-in between 4pm and 11pm (inc. GST if any).","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":5,"hours":"4pm-10:59pm","startHour":16,"endHour":23}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird currently pay 0.00 cents/kWh solar feed-in for other time (inc. GST if any).","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":23,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":0,"endHour":16}]}],"terms":"This offer is for SA residential customers with an eligible electricity smart meter. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Four-hour free usage every day","description":"$0.00 for consumption between 10am-2pm (Local Time), excluding controlled load."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":60.5},{"type":"OFF_PEAK","startHour":10,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":60.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-14.6},{"plan_id":"globird-glo1054024mre1eme-electricity","cdr_plan_id":"GLO1054024MRE1@EME","retailer":"GloBird Energy","retailer_slug":"globird","retailer_logo_uri":"https://www.globirdenergy.com.au/wp-content/uploads/2017/09/GloBird_web_logo.svg","plan_name":"FOUR4FREE Residential (Flexible Rate CTL)-SAPN","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":60.5,"supply_charge_cents_per_day":140,"free_window_start":"10:00","free_window_end":"14:00","free_window_fraction":0.1213,"original_tariff_type":"time_of_use","peak_cents_per_kwh":60.5,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"10am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"direct_debit","description":"Direct Debit Discount","discount_percent":1,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 1% discount off Usage & Supply charges when you pay your bill on-time by direct debit"},{"type":"pay_on_time","description":"Pay-on-time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"You will receive 2% discount off Usage & Supply charges when you pay your bill on-time"}],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2105.84,"at_4000_kwh":2637.45,"at_5000_kwh":3169.07,"at_8000_kwh":4763.91},"marginal_rates":{"excess_unit_cost_cents":60.5,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=globird-glo1054024mre1eme-electricity&source=ai","last_verified":"2026-05-11","source_doc":"CDR EnergyPlanDetailV3 GLO1054024MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird currently pay 5.00 cents/kWh solar feed-in between 4pm and 11pm (inc. GST if any).","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":5,"hours":"4pm-10:59pm","startHour":16,"endHour":23}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"TOU Rate Solar FiT","description":"GloBird currently pay 0.00 cents/kWh solar feed-in for other time (inc. GST if any).","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":23,"endHour":24},{"type":"OFF_PEAK","rate_cents_per_kwh":0,"hours":"11pm-3:59pm","startHour":0,"endHour":16}]}],"terms":"This offer is for SA residential customers with an eligible electricity smart meter. Please visit www.globirdenergy.com.au for full terms and conditions or call us on 133456.","variation":"We may update your solar feed-in, or your rates from time to time. We'll always notify you in writing prior to any change.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"Additional fees and charges may apply, please see: https://www.globirdenergy.com.au/legal/fees/","fees":[{"type":"DISCONNECTION","amount":"70.00","description":"Min disconnection fee incl. GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"},{"type":"CONNECTION","amount":"70.00","description":"Min connection fee incl GST. Fees can vary for meter type, location or other factors. All fees here www.globirdenergy.com.au/fees","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Four-hour free usage every day","description":"$0.00 for consumption between 10am-2pm (Local Time), excluding controlled load."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":10,"rateCents":60.5},{"type":"OFF_PEAK","startHour":10,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":60.5}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-14.6},{"plan_id":"ovo-energy-ovo723777mre18eme-electricity","cdr_plan_id":"OVO723777MRE18@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The EV Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":56.13,"supply_charge_cents_per_day":108},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":2078.1,"at_4000_kwh":2639.4,"at_5000_kwh":3200.7,"at_8000_kwh":4884.6},"marginal_rates":{"excess_unit_cost_cents":56.13,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric Vehicle requirement"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo723777mre18eme-electricity&source=ai","last_verified":"2026-04-15","source_doc":"CDR EnergyPlanDetailV3 OVO723777MRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Off-Peak","description":"$0.045/kWh usage charge between midnight and 6am. Does not apply to controlled loads. For more information head to www.ovoenergy.com.au/electric-vehicles/"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-14.7},{"plan_id":"ovo-energy-ovo723780mre18eme-electricity","cdr_plan_id":"OVO723780MRE18@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The EV Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":56.13,"supply_charge_cents_per_day":108},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":2078.1,"at_4000_kwh":2639.4,"at_5000_kwh":3200.7,"at_8000_kwh":4884.6},"marginal_rates":{"excess_unit_cost_cents":56.13,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric Vehicle requirement"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo723780mre18eme-electricity&source=ai","last_verified":"2026-04-15","source_doc":"CDR EnergyPlanDetailV3 OVO723780MRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Off-Peak","description":"$0.045/kWh usage charge between midnight and 6am. Does not apply to controlled loads. For more information head to www.ovoenergy.com.au/electric-vehicles/"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-14.7},{"plan_id":"diamond-dia786886mbe4eme-electricity","cdr_plan_id":"DIA786886MBE4@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday - T73","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":145.31,"peak_cents_per_kwh":72,"off_peak_cents_per_kwh":41.89,"shoulder_cents_per_kwh":52.23,"peak_hours":"Time of Use: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":2120.11,"at_4000_kwh":2650.02,"at_5000_kwh":3179.93,"at_8000_kwh":4769.66},"marginal_rates":{"excess_unit_cost_cents":72,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia786886mbe4eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 DIA786886MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For full terms & conditions and solar feed in tariff eligibility, visit our website www.diamondenergy.com.au.","variation":"We may vary the Charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"Time of Use (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":41.89},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":52.23},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":72},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":41.89}]}]},{"season":"Time of Use (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":41.89},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":52.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":41.89}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-15.2},{"plan_id":"diamond-dia934005mbe2eme-electricity","cdr_plan_id":"DIA934005MBE2@EME","retailer":"Diamond Energy","retailer_slug":"diamond","retailer_logo_uri":"https://diamondenergy.com.au/wp-content/uploads/2023/06/DE-logo-approved_your-pure-power-people.png","plan_name":"Diamond Everyday - T73","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":145.31,"peak_cents_per_kwh":72,"off_peak_cents_per_kwh":41.89,"shoulder_cents_per_kwh":52.23,"peak_hours":"Time of Use: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun · Time of Use: 9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"Time of Use: 7am-4:59pm mon, tue, wed, thu, fri, sat, sun · Time of Use: 7am-8:59pm mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"pay_on_time","description":"Pay On Time Discount","discount_percent":2,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Ongoing 2% discount on GST exclusive daily supply charges and usage rates with email invoicing and full payment received by due date"}],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":2120.11,"at_4000_kwh":2650.02,"at_5000_kwh":3179.93,"at_8000_kwh":4769.66},"marginal_rates":{"excess_unit_cost_cents":72,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=diamond-dia934005mbe2eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 DIA934005MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Diamond Feed in Credit","description":"Diamond Energy Standard Feed-in Rate, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":3},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"SA Distributor feed-in tariff","description":"SA Distributor feed-in tariff, subject to eligibility. Amounts are GST exclusive (if any)","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For full terms & conditions and solar feed in tariff eligibility, visit our website www.diamondenergy.com.au.","variation":"We may vary the Charges (including the amount and structure of any Charges), discounts, solar feed-in rates and Terms & Conditions from time to time consistent with the Terms & Conditions.","onExpiryDescription":"This is an ongoing agreement with ongoing benefits and continues until you or we end it.","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY","PAPER_BILL"],"meterTypes":["Type 4","Type 5","Type 4a"],"additionalFeeInformation":"Other fees may apply including for such items meter special reads, meter installation, reconfiguration, energisation and de-energisation. Contact Diamond Energy for further information.","fees":[{"type":"CC_PROCESSING","amount":"0.006","description":"May be applicable if you choose to pay by Mastercard or Visa credit cards","term":"PERCENT_OF_BILL","rate":"0.006"},{"type":"CHEQUE_DISHONOUR","amount":"20.00","description":"Dishonoured Payment Fee (cheque)","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Dishonoured Payment Fee (direct debit)","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"15.00","description":"Late payment fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"Charges passed through from your distributor which can vary from time to time.","term":"FIXED"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 2.75 c / kWh inc. GST we ensure energy equal to 50% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":50,"amount":"0.0275"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 5.5c / kWh inc. GST we ensure energy equal to 100% of your consumption will be fed into the grid from Accredited GreenPower generators","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"Time of Use (1 Nov – 31 Mar)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":41.89},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":52.23},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":72},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":41.89}]}]},{"season":"Time of Use (1 Apr – 31 Oct)","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":41.89},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":52.23},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":41.89}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-15.2},{"plan_id":"radian-ior1009974mbe1eme-electricity","cdr_plan_id":"IOR1009974MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Smart Business: BSRCL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":50,"supply_charge_cents_per_day":181.82},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2163.64,"at_4000_kwh":2663.64,"at_5000_kwh":3163.64,"at_8000_kwh":4663.64},"marginal_rates":{"excess_unit_cost_cents":50,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing; Meter upgrade"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009974mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009974MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-15.8},{"plan_id":"radian-ior1009966mbe1eme-electricity","cdr_plan_id":"IOR1009966MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Smart Business: BSR","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":50,"supply_charge_cents_per_day":181.82},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2163.64,"at_4000_kwh":2663.64,"at_5000_kwh":3163.64,"at_8000_kwh":4663.64},"marginal_rates":{"excess_unit_cost_cents":50,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing; Meter upgrade"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009966mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009966MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-15.8},{"plan_id":"radian-ior1009969mre1eme-electricity","cdr_plan_id":"IOR1009969MRE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Basic Home: RSR","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":54.55,"supply_charge_cents_per_day":150},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2184,"at_4000_kwh":2729.5,"at_5000_kwh":3275,"at_8000_kwh":4911.5},"marginal_rates":{"excess_unit_cost_cents":54.55,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009969mre1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009969MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-18.6},{"plan_id":"radian-ior1009977mre1eme-electricity","cdr_plan_id":"IOR1009977MRE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Basic Home: RSRCL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":54.55,"supply_charge_cents_per_day":150},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2184,"at_4000_kwh":2729.5,"at_5000_kwh":3275,"at_8000_kwh":4911.5},"marginal_rates":{"excess_unit_cost_cents":54.55,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009977mre1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009977MRE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-18.6},{"plan_id":"flipped-fea1059511mbe1eme-electricity","cdr_plan_id":"FEA1059511MBE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Business Anytime Switched On! Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":32.04,"supply_charge_cents_per_day":405.58},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":2441.57,"at_4000_kwh":2761.97,"at_5000_kwh":3082.37,"at_8000_kwh":4043.57},"marginal_rates":{"excess_unit_cost_cents":32.04,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059511mbe1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059511MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-20},{"plan_id":"ovo-energy-ovo723743mre18eme-electricity","cdr_plan_id":"OVO723743MRE18@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic EV Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":58.94,"supply_charge_cents_per_day":113.4},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":2182.11,"at_4000_kwh":2771.51,"at_5000_kwh":3360.91,"at_8000_kwh":5129.11},"marginal_rates":{"excess_unit_cost_cents":58.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric Vehicle requirement"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo723743mre18eme-electricity&source=ai","last_verified":"2026-04-15","source_doc":"CDR EnergyPlanDetailV3 OVO723743MRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Off-Peak","description":"$0.04725/kWh usage charge between midnight and 6am. Does not apply to controlled loads. For more information head to www.ovoenergy.com.au/electric-vehicles/"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-20.4},{"plan_id":"ovo-energy-ovo723775mre18eme-electricity","cdr_plan_id":"OVO723775MRE18@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic EV Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":58.94,"supply_charge_cents_per_day":113.4},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":2182.11,"at_4000_kwh":2771.51,"at_5000_kwh":3360.91,"at_8000_kwh":5129.11},"marginal_rates":{"excess_unit_cost_cents":58.94,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Electric Vehicle requirement"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo723775mre18eme-electricity&source=ai","last_verified":"2026-04-15","source_doc":"CDR EnergyPlanDetailV3 OVO723775MRE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"EV Off-Peak","description":"$0.04725/kWh usage charge between midnight and 6am. Does not apply to controlled loads. For more information head to www.ovoenergy.com.au/electric-vehicles/"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-20.4},{"plan_id":"flipped-fea1059496mbe1eme-electricity","cdr_plan_id":"FEA1059496MBE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Business Freedom Switched On!","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":456.16,"peak_cents_per_kwh":51.26,"off_peak_cents_per_kwh":12.28,"shoulder_cents_per_kwh":33.17,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9am-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"9pm-8:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":2509.54,"at_4000_kwh":2791.06,"at_5000_kwh":3072.58,"at_8000_kwh":3917.14},"marginal_rates":{"excess_unit_cost_cents":51.26,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059496mbe1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059496MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":9,"rateCents":33.17},{"type":"OFF_PEAK","startHour":9,"endHour":17,"rateCents":12.28},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":51.26},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":33.17}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-21.3},{"plan_id":"radian-ior1009963mbe1eme-electricity","cdr_plan_id":"IOR1009963MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Basic Business - B2RCL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":181.82,"peak_cents_per_kwh":72.73,"off_peak_cents_per_kwh":45.45,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2272.66,"at_4000_kwh":2809,"at_5000_kwh":3345.34,"at_8000_kwh":4954.36},"marginal_rates":{"excess_unit_cost_cents":72.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009963mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009963MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":45.45},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":72.73},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":45.45}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":45.45}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-22.1},{"plan_id":"radian-ior1009967mbe1eme-electricity","cdr_plan_id":"IOR1009967MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Basic Business - B2R","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":181.82,"peak_cents_per_kwh":72.73,"off_peak_cents_per_kwh":45.45,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2272.66,"at_4000_kwh":2809,"at_5000_kwh":3345.34,"at_8000_kwh":4954.36},"marginal_rates":{"excess_unit_cost_cents":72.73,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009967mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009967MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":45.45},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":72.73},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":45.45}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":45.45}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-22.1},{"plan_id":"energy-locals-retail-lcl987124sbe1eme-electricity","cdr_plan_id":"LCL987124SBE1@EME","retailer":"Energy Locals Retail","retailer_slug":"energy-locals-retail","retailer_logo_uri":"https://public.energylocals.com.au/public/cdr.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.82,"supply_charge_cents_per_day":369.09},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2451.78,"at_4000_kwh":2819.98,"at_5000_kwh":3188.18,"at_8000_kwh":4292.78},"marginal_rates":{"excess_unit_cost_cents":36.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-retail-lcl987124sbe1eme-electricity&source=ai","last_verified":"2025-08-01","source_doc":"CDR EnergyPlanDetailV3 LCL987124SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"Energy Locals offers no lock in contracts or exit fees. Prices may vary in accordance with the terms and conditions. See energylocals.com.au/terms for full terms and conditions.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"No fixed contract.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fees","fees":[{"type":"LATE_PAYMENT","amount":"16.00","description":"Charged when full payment has not been received by the invoice due date. This charge is not subject to GST.","term":"FIXED"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"2.00","description":"Charged for providing a paper bill","term":"FIXED"},{"type":"CONNECTION","amount":"63.712","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.712","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"We accept Visa, Mastercard and AMEX for payments via our secure Westpac payment portal at energylocals.com.au/pay-by-card. A credit card processing fee of 0.81% or a debit card processing fee of 0.46% will be applied when paying with these card types. Please note that processing fees for payments made via direct debit using a credit or debit card will be waived.","term":"PERCENT_OF_BILL","rate":"0.0081"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-22.6},{"plan_id":"energy-locals-urban-elu1021363sbe2eme-electricity","cdr_plan_id":"ELU1021363SBE2@EME","retailer":"Energy Locals Urban","retailer_slug":"energy-locals-urban","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/627094e73c210df02fadab1ea9ebac5e.png","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.82,"supply_charge_cents_per_day":369.09},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2451.78,"at_4000_kwh":2819.98,"at_5000_kwh":3188.18,"at_8000_kwh":4292.78},"marginal_rates":{"excess_unit_cost_cents":36.82,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=energy-locals-urban-elu1021363sbe2eme-electricity&source=ai","last_verified":"2025-11-24","source_doc":"CDR EnergyPlanDetailV3 ELU1021363SBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Feed In Tariff","description":"Retailer Feed-in Tariff (inc. GST, if any) | All kWh/day","type":"single","rate_cents_per_kwh":0}],"terms":"For full terms and conditions, visit https://energylocals.com.au/urban-terms/, or call Energy Locals Urban on 1300 001 255.","variation":"Due to changes in the market and economic conditions, we may update your tariff and/or fees. We will provide at least 5 business days' notice before the change takes place.","onExpiryDescription":"Energy Locals Urban offers no lock in contracts or exit fees.","billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"For more information on these fees and other fees, please visit energylocals.com.au/fee-schedule/ or call our Customer Service Team on 1300 001 255.","fees":[{"type":"DD_DISHONOUR","amount":"9.9","description":"A $9.90 Ezi-Debit Dishonour Fee, per failed transaction. This is charged by Ezi-debit, not Energy Locals Urban.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0143","description":"A fee of 1.43% applies to payments made by Visa and Mastercard","term":"PERCENT_OF_BILL","rate":"0.0143"},{"type":"LATE_PAYMENT","amount":"16.00","description":"A $16.00 Late payment fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0199","description":"A fee of 1.99% of the transaction value plus $0.30 for Amex","term":"PERCENT_OF_BILL","rate":"0.0199"},{"type":"CONNECTION","amount":"30.00","description":"Standard Next Day Connection Fee.  Other connection fees may apply. Contact our Customer Service Team to find out more 1300 001 255. Charges incurred by your distributor may vary.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-22.6},{"plan_id":"momentum-mom919582mbe2eme-electricity","cdr_plan_id":"MOM919582MBE2@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Strictly Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":241.2,"peak_cents_per_kwh":59.4,"off_peak_cents_per_kwh":44.6,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":2351.58,"at_4000_kwh":2841.98,"at_5000_kwh":3332.38,"at_8000_kwh":4803.58},"marginal_rates":{"excess_unit_cost_cents":59.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919582mbe2eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919582MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must have an ABN, communicate with us and receive your bills electronically, have the necessary metering configuration and meet all eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"10% GreenPower included","description":"GreenPower comes with this plan. That means you offset 10% of your electricity usage with renewable energy."}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.6},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":59.4},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-23.5},{"plan_id":"momentum-mom916056sbe1eme-electricity","cdr_plan_id":"MOM916056SBE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":241.2,"peak_cents_per_kwh":59.4,"off_peak_cents_per_kwh":44.6,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2351.58,"at_4000_kwh":2841.98,"at_5000_kwh":3332.38,"at_8000_kwh":4803.58},"marginal_rates":{"excess_unit_cost_cents":59.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916056sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916056SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.6},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":59.4},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-23.5},{"plan_id":"momentum-mom916006sbe1eme-electricity","cdr_plan_id":"MOM916006SBE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":241.2,"peak_cents_per_kwh":59.4,"off_peak_cents_per_kwh":44.6,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri, sat, sun","shoulder_hours":null},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2351.58,"at_4000_kwh":2841.98,"at_5000_kwh":3332.38,"at_8000_kwh":4803.58},"marginal_rates":{"excess_unit_cost_cents":59.4,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916006sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916006SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.6},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":59.4},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-23.5},{"plan_id":"ovo-energy-ovo704473mre19eme-electricity","cdr_plan_id":"OVO704473MRE19@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Free 3 Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":67.59,"supply_charge_cents_per_day":108,"free_window_start":"11:00","free_window_end":"14:00","free_window_fraction":0.0898,"original_tariff_type":"flat","peak_cents_per_kwh":67.59,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"11am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Free 3 Rate","discount_percent":43,"applies_to":"usage_only","annual_value_at_benchmark":0,"condition_plain_english":"Discount amount stated is an estimate. Actual discount percentage amount will vary depending on customer's actual usage during Free 3 period 11am - 2pm daily. Applies to usage charges only, excludes controlled load."}],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":2239.81,"at_4000_kwh":2855.02,"at_5000_kwh":3470.22,"at_8000_kwh":5315.83},"marginal_rates":{"excess_unit_cost_cents":67.59,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704473mre19eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704473MRE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free 3","description":"Free electricity between 11am and 2pm everyday. For more information head to https://pages.ovoenergy.com.au/the-free-3-plan"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":11,"rateCents":67.59},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":67.59}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-24.1},{"plan_id":"ovo-energy-ovo704474mre19eme-electricity","cdr_plan_id":"OVO704474MRE19@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Free 3 Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":67.59,"supply_charge_cents_per_day":108,"free_window_start":"11:00","free_window_end":"14:00","free_window_fraction":0.0898,"original_tariff_type":"flat","peak_cents_per_kwh":67.59,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"11am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Free 3 Rate","discount_percent":43,"applies_to":"usage_only","annual_value_at_benchmark":0,"condition_plain_english":"Discount amount stated is an estimate. Actual discount percentage amount will vary depending on customer's actual usage during Free 3 period 11am - 2pm daily. Applies to usage charges only, excludes controlled load."}],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":2239.81,"at_4000_kwh":2855.02,"at_5000_kwh":3470.22,"at_8000_kwh":5315.83},"marginal_rates":{"excess_unit_cost_cents":67.59,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704474mre19eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704474MRE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD"],"meterTypes":["Type 4"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free 3","description":"Free electricity between 11am and 2pm everyday. For more information head to https://pages.ovoenergy.com.au/the-free-3-plan"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":11,"rateCents":67.59},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":67.59}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-24.1},{"plan_id":"flipped-fea1059476mbe1eme-electricity","cdr_plan_id":"FEA1059476MBE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Business Anytime Switched On!","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":31.43,"supply_charge_cents_per_day":456.16},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":2607.88,"at_4000_kwh":2922.18,"at_5000_kwh":3236.48,"at_8000_kwh":4179.38},"marginal_rates":{"excess_unit_cost_cents":31.43,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059476mbe1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059476MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-27},{"plan_id":"ovo-energy-ovo704349mre19eme-electricity","cdr_plan_id":"OVO704349MRE19@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic Free 3 Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":70.97,"supply_charge_cents_per_day":113.4,"free_window_start":"11:00","free_window_end":"14:00","free_window_fraction":0.0898,"original_tariff_type":"flat","peak_cents_per_kwh":70.97,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"11am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Free 3 Rate","discount_percent":43,"applies_to":"usage_only","annual_value_at_benchmark":0,"condition_plain_english":"Discount amount stated is an estimate. Actual discount percentage amount will vary depending on customer's actual usage during Free 3 period 11am - 2pm daily. Applies to usage charges only, excludes controlled load."}],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":2351.82,"at_4000_kwh":2997.79,"at_5000_kwh":3643.75,"at_8000_kwh":5581.66},"marginal_rates":{"excess_unit_cost_cents":70.97,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704349mre19eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704349MRE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free 3","description":"Free electricity between 11am and 2pm everyday. For more information head to https://pages.ovoenergy.com.au/the-free-3-plan"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":11,"rateCents":70.97},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":70.97}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-30.3},{"plan_id":"ovo-energy-ovo704348mre19eme-electricity","cdr_plan_id":"OVO704348MRE19@EME","retailer":"OVO Energy","retailer_slug":"ovo-energy","retailer_logo_uri":"https://email-assets.ovoenergy.com.au/ovo_energy_full_green_logo.png","plan_name":"The Basic Free 3 Plan","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"residential","plan_type":"market","tariff_type":"midday_free","contract_term_months":null,"exit_fee_dollars":0,"rates":{"base_rate_cents_per_kwh":70.97,"supply_charge_cents_per_day":113.4,"free_window_start":"11:00","free_window_end":"14:00","free_window_fraction":0.0898,"original_tariff_type":"flat","peak_cents_per_kwh":70.97,"off_peak_cents_per_kwh":0,"peak_hours":"outside free window","off_peak_hours":"11am–2pm daily"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Free 3 Rate","discount_percent":43,"applies_to":"usage_only","annual_value_at_benchmark":0,"condition_plain_english":"Discount amount stated is an estimate. Actual discount percentage amount will vary depending on customer's actual usage during Free 3 period 11am - 2pm daily. Applies to usage charges only, excludes controlled load."}],"signup_credits":[],"solar_fit_cents_per_kwh":1.5,"annual_cost_estimates":{"at_3000_kwh":2351.82,"at_4000_kwh":2997.79,"at_5000_kwh":3643.75,"at_8000_kwh":5581.66},"marginal_rates":{"excess_unit_cost_cents":70.97,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=ovo-energy-ovo704348mre19eme-electricity&source=ai","last_verified":"2025-08-28","source_doc":"CDR EnergyPlanDetailV3 OVO704348MRE19@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"FiT","description":"OVO Energy Retailer Feed-in-Tariff (exclusive of GST)","type":"single","rate_cents_per_kwh":1.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Government FiT","description":"Government feed-in tariffs available for eligible customers. Contact retailer for details","type":"single","rate_cents_per_kwh":44}],"terms":"OVO Energy's terms and conditions are available at www.ovoenergy.com.au/terms.","variation":"OVO Energy may vary the rates at any time in accordance with the terms and conditions available at www.ovoenergy.com.au/terms.","onExpiryDescription":"Ongoing contract with no contract term","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"OVO Energy reserves the right to and will notify you if it changes or imposes additional fees or charges in relation to your energy supply. Please refer to www.ovoenergy.com.au/fees for more information.","fees":[{"type":"CONNECTION","amount":"63.71","description":"Connection fee - Site Visit (inc GST). Fees may vary for some customers.","term":"FIXED"},{"type":"DISCONNECTION","amount":"63.71","description":"A fee (inc GST) may be charged for disconnection when you move out of your property. Fees may vary for some customers.","term":"FIXED"},{"type":"OTHER","amount":"0.00","description":"Other fees may apply. Please refer to www.ovoenergy.com.au/fees.","term":"FIXED"}],"incentives":[{"category":"OTHER","displayName":"Free 3","description":"Free electricity between 11am and 2pm everyday. For more information head to https://pages.ovoenergy.com.au/the-free-3-plan"},{"category":"OTHER","displayName":"Interest Rewards","description":"OVO pay 3% interest on credit balances (after all monthly charges are considered). This is prorated for the number of days since your last bill."}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"100% GreenPower for 5.5 c/kWh inc. GST.","tiers":[{"percentGreen":100,"amount":"0.055"}]}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"PEAK","startHour":0,"endHour":11,"rateCents":70.97},{"type":"OFF_PEAK","startHour":11,"endHour":14,"rateCents":0},{"type":"PEAK","startHour":14,"endHour":24,"rateCents":70.97}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-30.3},{"plan_id":"radian-ior1009965mbe1eme-electricity","cdr_plan_id":"IOR1009965MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Basic Business - BSR","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":59.09,"supply_charge_cents_per_day":181.82},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2436.34,"at_4000_kwh":3027.24,"at_5000_kwh":3618.14,"at_8000_kwh":5390.84},"marginal_rates":{"excess_unit_cost_cents":59.09,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009965mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009965MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-31.6},{"plan_id":"radian-ior1009964mbe1eme-electricity","cdr_plan_id":"IOR1009964MBE1@EME","retailer":"iO Energy","retailer_slug":"radian","retailer_logo_uri":null,"plan_name":"Basic Business - BSRCL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":59.09,"supply_charge_cents_per_day":181.82},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2436.34,"at_4000_kwh":3027.24,"at_5000_kwh":3618.14,"at_8000_kwh":5390.84},"marginal_rates":{"excess_unit_cost_cents":59.09,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"e-Billing"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=radian-ior1009964mbe1eme-electricity&source=ai","last_verified":"2025-10-01","source_doc":"CDR EnergyPlanDetailV3 IOR1009964MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar FIT","description":"iO Energy Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":0}],"terms":"Prices may vary in accordance with terms and conditions. For full terms and conditions, visit https://www.ioenergy.com.au/ or call 1300 313 463","variation":"Our energy prices may vary due to changes in the market and economic conditions. By entering into this Contract, you agree that we may vary your rates. You will be notified of any price change in writing at least 5 business days before effective date.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 6"],"additionalFeeInformation":"Full details on fees can be found at https://www.ioenergy.com.au/fees.","fees":[{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when you move out and require a final meter read. Actual fee may vary.","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"0.02","description":"Late Payment Fee (Percentage of overdue balance). This charge is not subject to GST.","term":"PERCENT_OF_BILL","rate":"0.02"},{"type":"LATE_PAYMENT","amount":"16.00","description":"Fee applies for each bill that's paid after the due date. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"3.00","description":"A paper bill fee applies for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0081","description":"Credit card payments incur a 0.81% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0081"},{"type":"DD_DISHONOUR","amount":"10.00","description":"Charged when a direct debit payment has dishonoured or reversed. This charge is not subject to GST.","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"May be charged when you move into a property or change retailer. Actual fee may vary.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0046","description":"Credit card payments incur a 0.46% fee. Waived for direct debit.","term":"PERCENT_OF_BILL","rate":"0.0046"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-31.6},{"plan_id":"momentum-mom919589mbe2eme-electricity","cdr_plan_id":"MOM919589MBE2@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Strictly Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":241.2,"peak_cents_per_kwh":69.2,"off_peak_cents_per_kwh":44.7,"shoulder_cents_per_kwh":57.2,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":2516.88,"at_4000_kwh":3062.38,"at_5000_kwh":3607.88,"at_8000_kwh":5244.38},"marginal_rates":{"excess_unit_cost_cents":69.2,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919589mbe2eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919589MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must have an ABN, communicate with us and receive your bills electronically, have the necessary metering configuration and meet all eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"10% GreenPower included","description":"GreenPower comes with this plan. That means you offset 10% of your electricity usage with renewable energy."}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.7},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":57.2},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":69.2},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.7}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":44.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":69.2},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.7}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.7},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":57.2},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.7}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":44.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-33.1},{"plan_id":"momentum-mom916077sbe1eme-electricity","cdr_plan_id":"MOM916077SBE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":241.2,"peak_cents_per_kwh":69.2,"off_peak_cents_per_kwh":44.7,"shoulder_cents_per_kwh":57.2,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2516.88,"at_4000_kwh":3062.38,"at_5000_kwh":3607.88,"at_8000_kwh":5244.38},"marginal_rates":{"excess_unit_cost_cents":69.2,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916077sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916077SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.7},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":57.2},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":69.2},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.7}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":44.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":69.2},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.7}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.7},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":57.2},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.7}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":44.7}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-33.1},{"plan_id":"momentum-mom916003sbe1eme-electricity","cdr_plan_id":"MOM916003SBE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":56.1,"supply_charge_cents_per_day":241.2},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2563.38,"at_4000_kwh":3124.38,"at_5000_kwh":3685.38,"at_8000_kwh":5368.38},"marginal_rates":{"excess_unit_cost_cents":56.1,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916003sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916003SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-35.8},{"plan_id":"sumo-sum1034970sbe1eme-electricity","cdr_plan_id":"SUM1034970SBE1@EME","retailer":"Sumo","retailer_slug":"sumo","retailer_logo_uri":"https://sumo-public-share.s3.ap-southeast-2.amazonaws.com/SumoIT/URI/Sumo_Logo.png","plan_name":"Sumo Standing Offer TOU Interval + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":179.2,"peak_cents_per_kwh":72.8,"off_peak_cents_per_kwh":56,"shoulder_cents_per_kwh":62.7,"peak_hours":"Summer Months: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer Months: 12am-6:59am mon, tue, wed, thu, fri; 12am-4:59pm sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun · Non-Summer Months: 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":"Summer Months: 7am-4:59pm mon, tue, wed, thu, fri · Non-Summer Months: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2525.48,"at_4000_kwh":3149.28,"at_5000_kwh":3773.08,"at_8000_kwh":5644.48},"marginal_rates":{"excess_unit_cost_cents":72.8,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"you meet our requirements"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=sumo-sum1034970sbe1eme-electricity&source=ai","last_verified":"2026-02-13","source_doc":"CDR EnergyPlanDetailV3 SUM1034970SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed in Tariff","description":"If you have installed solar PV at the Premises, you may be eligible to be paid for excess electricity you feed back into the grid. Maximum system size of 10KW.","type":"single","rate_cents_per_kwh":0}],"terms":"Offer not available in all areas or properties. You must be a Small Business customer with an applicable network tariff for a premises where Sumo supplies Electricity. Please refer to our website https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions for full terms and conditions.","variation":"Prices, fees and charges are subject to change. We will give you at least 5 business days prior notice.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"We will pass through any fee imposed by your distributor, including fees for disconnection or reconnection, or special meter read on move-out. Distributor fees published at https://www.sumo.com.au/help-and-support/rates-and-other-charges/other-fees-and-charges. Fee applied to your next bill.","fees":[{"type":"OTHER","amount":"2.75","description":"Dishonoured Payment Fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A standard connection fee of $63.71 (ex GST) applies when you requested a connection of your electricity supply during standard business hours (Monday to Friday, excluding public holidays) when the site is already connected.  All fees are subject to change and may vary depending on your distribution network or specific property requirements. Additional charges may apply for urgent, after-hours, or complex connections.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.007","description":"This fee is only applicable for payments made by credit card.","term":"PERCENT_OF_BILL","rate":"0.007"},{"type":"PAPER_BILL","amount":"3.1","description":"Bills can be issued by email for no cost, or alternatively by post at a cost of $3.10 (inc GST) per bill.","term":"FIXED"},{"type":"OTHER","amount":"2.00","description":"Over the counter fee at Australia Post","term":"FIXED"}],"touSchedule":[{"season":"Summer Months (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":56},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":62.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":72.8},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":56}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":56},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":72.8},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":56}]}]},{"season":"Non-Summer Months (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":56},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":62.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":56}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":56},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-36.9},{"plan_id":"sumo-sum1034966sbe1eme-electricity","cdr_plan_id":"SUM1034966SBE1@EME","retailer":"Sumo","retailer_slug":"sumo","retailer_logo_uri":"https://sumo-public-share.s3.ap-southeast-2.amazonaws.com/SumoIT/URI/Sumo_Logo.png","plan_name":"Sumo Standing Offer TOU Interval","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":179.2,"peak_cents_per_kwh":72.8,"off_peak_cents_per_kwh":56,"shoulder_cents_per_kwh":62.7,"peak_hours":"Summer Months: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Summer Months: 12am-6:59am mon, tue, wed, thu, fri; 12am-4:59pm sat, sun; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun · Non-Summer Months: 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 12am-6:59am mon, tue, wed, thu, fri, sat, sun; 7am-8:59pm sat, sun","shoulder_hours":"Summer Months: 7am-4:59pm mon, tue, wed, thu, fri · Non-Summer Months: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2525.48,"at_4000_kwh":3149.28,"at_5000_kwh":3773.08,"at_8000_kwh":5644.48},"marginal_rates":{"excess_unit_cost_cents":72.8,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"you meet our requirements"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=sumo-sum1034966sbe1eme-electricity&source=ai","last_verified":"2026-02-13","source_doc":"CDR EnergyPlanDetailV3 SUM1034966SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Feed in Tariff","description":"If you have installed solar PV at the Premises, you may be eligible to be paid for excess electricity you feed back into the grid. Maximum system size of 10KW.","type":"single","rate_cents_per_kwh":0}],"terms":"Offer not available in all areas or properties. You must be a Small Business customer with an applicable network tariff for a premises where Sumo supplies Electricity. Please refer to our website https://www.sumo.com.au/help-and-support/terms-and-conditions/sumo-terms-and-conditions for full terms and conditions.","variation":"Prices, fees and charges are subject to change. We will give you at least 5 business days prior notice.","billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","BPAY","CREDIT_CARD","PAPER_BILL"],"meterTypes":["Type 4","Type 4a"],"additionalFeeInformation":"We will pass through any fee imposed by your distributor, including fees for disconnection or reconnection, or special meter read on move-out. Distributor fees published at https://www.sumo.com.au/help-and-support/rates-and-other-charges/other-fees-and-charges. Fee applied to your next bill.","fees":[{"type":"OTHER","amount":"2.75","description":"Dishonoured Payment Fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"A standard connection fee of $63.71 (ex GST) applies when you requested a connection of your electricity supply during standard business hours (Monday to Friday, excluding public holidays) when the site is already connected.  All fees are subject to change and may vary depending on your distribution network or specific property requirements. Additional charges may apply for urgent, after-hours, or complex connections.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.007","description":"This fee is only applicable for payments made by credit card.","term":"PERCENT_OF_BILL","rate":"0.007"},{"type":"PAPER_BILL","amount":"3.1","description":"Bills can be issued by email for no cost, or alternatively by post at a cost of $3.10 (inc GST) per bill.","term":"FIXED"},{"type":"OTHER","amount":"2.00","description":"Over the counter fee at Australia Post","term":"FIXED"}],"touSchedule":[{"season":"Summer Months (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":56},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":62.7},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":72.8},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":56}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":56},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":72.8},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":56}]}]},{"season":"Non-Summer Months (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":56},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":62.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":56}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":56},{"type":"OFF_PEAK","startHour":7,"endHour":21,"rateCents":56},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":56}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-36.9},{"plan_id":"momentum-mom919585mbe2eme-electricity","cdr_plan_id":"MOM919585MBE2@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Strictly Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":241.2,"peak_cents_per_kwh":79.7,"off_peak_cents_per_kwh":44.6,"shoulder_cents_per_kwh":55.6,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri, sat, sun; 10am-3:59pm mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-4:59pm sat, sun","shoulder_hours":"7am-9:59am mon, tue, wed, thu, fri; 4pm-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":2600.28,"at_4000_kwh":3173.58,"at_5000_kwh":3746.88,"at_8000_kwh":5466.78},"marginal_rates":{"excess_unit_cost_cents":79.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919585mbe2eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919585MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must have an ABN, communicate with us and receive your bills electronically, have the necessary metering configuration and meet all eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"10% GreenPower included","description":"GreenPower comes with this plan. That means you offset 10% of your electricity usage with renewable energy."}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.6},{"type":"SHOULDER","startHour":7,"endHour":10,"rateCents":55.6},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":44.6},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":55.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":79.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.6},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":44.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":79.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-37.9},{"plan_id":"momentum-mom916223sbe1eme-electricity","cdr_plan_id":"MOM916223SBE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":241.2,"peak_cents_per_kwh":79.7,"off_peak_cents_per_kwh":44.6,"shoulder_cents_per_kwh":55.6,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"12am-6:59am mon, tue, wed, thu, fri, sat, sun; 10am-3:59pm mon, tue, wed, thu, fri; 9pm-11:59pm mon, tue, wed, thu, fri, sat, sun; 7am-4:59pm sat, sun","shoulder_hours":"7am-9:59am mon, tue, wed, thu, fri; 4pm-4:59pm mon, tue, wed, thu, fri"},"demand_charges":null,"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2600.28,"at_4000_kwh":3173.58,"at_5000_kwh":3746.88,"at_8000_kwh":5466.78},"marginal_rates":{"excess_unit_cost_cents":79.7,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916223sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916223SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.6},{"type":"SHOULDER","startHour":7,"endHour":10,"rateCents":55.6},{"type":"OFF_PEAK","startHour":10,"endHour":16,"rateCents":44.6},{"type":"SHOULDER","startHour":16,"endHour":17,"rateCents":55.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":79.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":44.6},{"type":"OFF_PEAK","startHour":7,"endHour":17,"rateCents":44.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":79.7},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":44.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-37.9},{"plan_id":"momentum-mom919590mbe2eme-electricity","cdr_plan_id":"MOM919590MBE2@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Strictly Business","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":352.9,"peak_cents_per_kwh":58.3,"off_peak_cents_per_kwh":40.6,"shoulder_cents_per_kwh":49.6,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Anytime Demand ($/kVA/day)","description":"Anytime Maximum demand charge based on highest half-hour demand during the last 12 months.","amount_cents_per_kw":8.42,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2.5,"annual_cost_estimates":{"at_3000_kwh":2719.39,"at_4000_kwh":3196.48,"at_5000_kwh":3673.59,"at_8000_kwh":5104.89},"marginal_rates":{"excess_unit_cost_cents":58.3,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom919590mbe2eme-electricity&source=ai","last_verified":"2025-10-29","source_doc":"CDR EnergyPlanDetailV3 MOM919590MBE2@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":2.5},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":46.5}],"terms":"Time of use charges are based on ACST, except when daylight savings applies in which case interval meters are adjusted to ACDT, unless indicated otherwise. To be eligible you must have an ABN, communicate with us and receive your bills electronically, have the necessary metering configuration and meet all eligibility criteria. Full T&Cs can be obtained from momentumenergy.com.au/customer-support/terms-and-conditions or by contacting us on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.0053","description":"A 0.53% fee (GST Incl) will apply to payments made by any credit or debit card","term":"PERCENT_OF_BILL","rate":"0.0053"}],"incentives":[{"category":"OTHER","displayName":"10% GreenPower included","description":"GreenPower comes with this plan. That means you offset 10% of your electricity usage with renewable energy."}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40.6},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":58.3},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":40.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":58.3},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40.6}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40.6},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.6},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":40.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-38.9},{"plan_id":"momentum-mom916224sbe1eme-electricity","cdr_plan_id":"MOM916224SBE1@EME","retailer":"Momentum Energy","retailer_slug":"momentum","retailer_logo_uri":"https://www.momentumenergy.com.au/assets/images/logo.svg","plan_name":"Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":352.9,"peak_cents_per_kwh":58.3,"off_peak_cents_per_kwh":40.6,"shoulder_cents_per_kwh":49.6,"peak_hours":"Time of Use Tariff Period: 5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 9pm-4:59pm sat, sun · Time of Use Tariff Period: 9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":"Time of Use Tariff Period: 7am-4:59pm mon, tue, wed, thu, fri · Time of Use Tariff Period: 7am-8:59pm mon, tue, wed, thu, fri"},"demand_charges":[{"display_name":"Anytime Demand ($/kVA/day)","description":"Anytime Maximum demand charge based on highest half-hour demand during the last 12 months.","amount_cents_per_kw":8.42,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":null,"annual_cost_estimates":{"at_3000_kwh":2719.39,"at_4000_kwh":3196.48,"at_5000_kwh":3673.59,"at_8000_kwh":5104.89},"marginal_rates":{"excess_unit_cost_cents":58.3,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=momentum-mom916224sbe1eme-electricity&source=ai","last_verified":"2025-07-01","source_doc":"CDR EnergyPlanDetailV3 MOM916224SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"General Feed-In-Tariff","type":"single","rate_cents_per_kwh":0},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Group 1/2/3","type":"single","rate_cents_per_kwh":44}],"terms":"Time of use charges are based on Australian Central Standard Time, except when daylight savings applies in which case interval meters are adjusted to Australian Central Daylight Time, unless indicated otherwise. Full terms and conditions can be obtained from www.momentumenergy.com.au/customer-support/terms-and-conditions or by contacting our Customer Care Team on 1800 SWITCH.","variation":"We will give you written notice of any variations to rates & charges under your contract in accordance with applicable legal requirements.","onExpiryDescription":"The agreement continues until terminated by you or us in accordance with your terms and conditions.","billFrequency":["P1M","P3M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 0"],"additionalFeeInformation":"For information on additional fees, a full schedule of charges is available from http://www.momentumenergy.com.au/fees","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee","term":"FIXED"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee","term":"FIXED"}],"touSchedule":[{"season":"Time of Use Tariff Period (1 Nov – 31 Mar)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40.6},{"type":"SHOULDER","startHour":7,"endHour":17,"rateCents":49.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":58.3},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":17,"rateCents":40.6},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":58.3},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40.6}]}]},{"season":"Time of Use Tariff Period (1 Apr – 31 Oct)","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":40.6},{"type":"SHOULDER","startHour":7,"endHour":21,"rateCents":49.6},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":40.6}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":40.6}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-38.9},{"plan_id":"flipped-fea1059498sbe1eme-electricity","cdr_plan_id":"FEA1059498SBE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Business Freedom Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":506.84,"peak_cents_per_kwh":57.9,"off_peak_cents_per_kwh":18.91,"shoulder_cents_per_kwh":39.8,"peak_hours":"5pm-8:59pm mon, tue, wed, thu, fri, sat, sun","off_peak_hours":"9am-4:59pm mon, tue, wed, thu, fri, sat, sun","shoulder_hours":"9pm-8:59am mon, tue, wed, thu, fri, sat, sun"},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":2893.52,"at_4000_kwh":3241.37,"at_5000_kwh":3589.22,"at_8000_kwh":4632.77},"marginal_rates":{"excess_unit_cost_cents":57.9,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059498sbe1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059498SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"All days","segments":[{"type":"SHOULDER","startHour":0,"endHour":9,"rateCents":39.8},{"type":"OFF_PEAK","startHour":9,"endHour":17,"rateCents":18.91},{"type":"PEAK","startHour":17,"endHour":21,"rateCents":57.9},{"type":"SHOULDER","startHour":21,"endHour":24,"rateCents":39.8}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-40.9},{"plan_id":"flipped-fea1059477sbe1eme-electricity","cdr_plan_id":"FEA1059477SBE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Business Anytime Standing Offer","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.06,"supply_charge_cents_per_day":506.84},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":2991.77,"at_4000_kwh":3372.37,"at_5000_kwh":3752.97,"at_8000_kwh":4894.77},"marginal_rates":{"excess_unit_cost_cents":38.06,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059477sbe1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059477SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-46.6},{"plan_id":"flipped-fea1059510sbe1eme-electricity","cdr_plan_id":"FEA1059510SBE1@EME","retailer":"Flipped Energy","retailer_slug":"flipped","retailer_logo_uri":"https://energymadeeasy.gov.au/static/organisations/logos/438ff02d87cec3f985c465552312d2e1.png","plan_name":"Business Anytime Standing Offer - Controlled Load","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":38.06,"supply_charge_cents_per_day":506.97},"demand_charges":null,"conditional_discounts":[{"type":"other","description":"Referral Discount","discount_percent":0,"applies_to":"total_bill","annual_value_at_benchmark":0,"condition_plain_english":"Refer someone to sign up to Flipped and if they sign up both you and your referral will receive a $30 credit on your account. Contact Flipped to get your referral code."}],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":2992.24,"at_4000_kwh":3372.84,"at_5000_kwh":3753.44,"at_8000_kwh":4895.24},"marginal_rates":{"excess_unit_cost_cents":38.06,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=flipped-fea1059510sbe1eme-electricity&source=ai","last_verified":"2026-05-27","source_doc":"CDR EnergyPlanDetailV3 FEA1059510SBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"Solar Feed In Tariff","description":"Solar Feed In Tariff","type":"single","rate_cents_per_kwh":2}],"terms":"For futher details on the terms and conditions of the offer, please visit www.flipped.energy or call 1300 110 100","variation":"If we are going to vary your Rates, we will provide you with written notice of the variation as soon as practicable  or no later than your next bill or in accordance with any applicable laws and codes.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 5"],"additionalFeeInformation":"For information on additional fees, please visit www.flipped.energy or call 1300 110 100","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee may apply when vacating your property or if we are required to disconnect your electricity supply. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection fee may apply when reconnecting electricity to your property. This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"},{"type":"CC_PROCESSING","amount":"0.015","description":"Credit card or direct debit card processing fee all payments with Visa and Mastercard (domestic)","term":"PERCENT_OF_BILL","rate":"0.015"},{"type":"CC_PROCESSING","amount":"0.0175","description":"Credit card processing fee all payments with AMEX (domestic)","term":"PERCENT_OF_BILL","rate":"0.0175"},{"type":"CONNECTION","amount":"63.71","description":"Connection fee may apply when moving into your property and connecting electricity to your property (or reading your meter where applicable). This price is for service in business hours; out of business hours may incur additional fees. Fees are charged by the distributor. See additional fee information for details.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-46.6},{"plan_id":"next-business-nex1044175mbe1eme-electricity","cdr_plan_id":"NEX1044175MBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"Next Assured Bus 15% GTD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":535.98,"peak_cents_per_kwh":36.89,"off_peak_cents_per_kwh":36.89,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Shoulder Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Mon - Fri, 12:00 - 16:00.","amount_cents_per_kw":22.02,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Summer Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Nov - Mar, Mon - Fri, 16:00 - 21:00.","amount_cents_per_kw":44.51,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.1,"annual_cost_estimates":{"at_3000_kwh":3063.03,"at_4000_kwh":3431.93,"at_5000_kwh":3800.83,"at_8000_kwh":4907.53},"marginal_rates":{"excess_unit_cost_cents":36.89,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1044175mbe1eme-electricity&source=ai","last_verified":"2026-03-31","source_doc":"CDR EnergyPlanDetailV3 NEX1044175MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT Premium: Single Rate Feed In Tariff","description":"FiT Premium | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"RFIT: Single Rate Feed In Tariff","description":"RFIT | All kWh/day","type":"single","rate_cents_per_kwh":0.1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":7,"hours":"5pm-7:59pm","startHour":17,"endHour":20}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":0,"hours":"10am-2:59pm","startHour":10,"endHour":15}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":0,"endHour":10},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":15,"endHour":17},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":20,"endHour":24}]}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates at any time in accordance with our terms and conditions.","onExpiryDescription":"This contract continues for as long as you choose to remain on the plan.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"CC_PROCESSING","amount":"0.0195","description":"1.95% AMEX credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0195"},{"type":"RECONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0077","description":"0.77% Visa & Mastercard credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0077"},{"type":"OTHER","amount":"77.00","description":"COMMS3 Meter Charge","term":"FIXED"},{"type":"OTHER","amount":"77.00","description":"COMMS4 Meter Charge","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":36.89},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":36.89},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":36.89}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":36.89}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-49.1},{"plan_id":"next-business-nex1044173mbe1eme-electricity","cdr_plan_id":"NEX1044173MBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"Next Assured Bus 15% GTD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":868.31,"peak_cents_per_kwh":32.95,"off_peak_cents_per_kwh":28.53,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Max Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Mon - Fri, 12:00 - 21:00.","amount_cents_per_kw":32.01,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Additional Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Any time.","amount_cents_per_kw":6.62,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.1,"annual_cost_estimates":{"at_3000_kwh":4065.01,"at_4000_kwh":4363.57,"at_5000_kwh":4662.13,"at_8000_kwh":5557.81},"marginal_rates":{"excess_unit_cost_cents":32.95,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1044173mbe1eme-electricity&source=ai","last_verified":"2026-03-31","source_doc":"CDR EnergyPlanDetailV3 NEX1044173MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT Premium: Single Rate Feed In Tariff","description":"FiT Premium | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"RFIT: Single Rate Feed In Tariff","description":"RFIT | All kWh/day","type":"single","rate_cents_per_kwh":0.1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":7,"hours":"5pm-7:59pm","startHour":17,"endHour":20}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":0,"hours":"10am-2:59pm","startHour":10,"endHour":15}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":0,"endHour":10},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":15,"endHour":17},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":20,"endHour":24}]}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates at any time in accordance with our terms and conditions.","onExpiryDescription":"This contract continues for as long as you choose to remain on the plan.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"CC_PROCESSING","amount":"0.0195","description":"1.95% AMEX credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0195"},{"type":"RECONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0077","description":"0.77% Visa & Mastercard credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0077"},{"type":"OTHER","amount":"77.00","description":"COMMS3 Meter Charge","term":"FIXED"},{"type":"OTHER","amount":"77.00","description":"COMMS4 Meter Charge","term":"FIXED"}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":28.53},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":32.95},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":28.53}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":28.53}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-89.6},{"plan_id":"alinta-ali463783mbe12eme-electricity","cdr_plan_id":"ALI463783MBE12@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"BusinessDeal On - Demand Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.24,"supply_charge_cents_per_day":787.33},"demand_charges":[{"display_name":"Demand Summer (c/kVA/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":8.42,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand All Year Shoulder (c/kVA/day)","description":"All Year, Mon-Fri","amount_cents_per_kw":8.42,"start_time":"12pm","end_time":"4pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":4050.95,"at_4000_kwh":4443.35,"at_5000_kwh":4835.75,"at_8000_kwh":6012.95},"marginal_rates":{"excess_unit_cost_cents":39.24,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali463783mbe12eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI463783MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-93.1},{"plan_id":"alinta-ali463784mbe12eme-electricity","cdr_plan_id":"ALI463784MBE12@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"BusinessDeal On - Demand Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":39.24,"supply_charge_cents_per_day":787.33},"demand_charges":[{"display_name":"Demand Summer (c/kVA/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":8.42,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand All Year Shoulder (c/kVA/day)","description":"All Year, Mon-Fri","amount_cents_per_kw":8.42,"start_time":"12pm","end_time":"4pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":4050.95,"at_4000_kwh":4443.35,"at_5000_kwh":4835.75,"at_8000_kwh":6012.95},"marginal_rates":{"excess_unit_cost_cents":39.24,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali463784mbe12eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI463784MBE12@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy's market tariff and feed in tariffs (where applicable) may be varied in accordance with applicable laws. If we change the applicable tariff, we will give you notice of any variations in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-93.1},{"plan_id":"alinta-ali13183sbe18eme-electricity","cdr_plan_id":"ALI13183SBE18@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SME Standing Offer - Demand Single Rate + CL","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.04,"supply_charge_cents_per_day":803.4},"demand_charges":[{"display_name":"Demand Summer (c/kVA/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":8.42,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Non-Summer (c/kW/day)","description":"April to October, Mon-Fri","amount_cents_per_kw":8.42,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":4133.61,"at_4000_kwh":4534.01,"at_5000_kwh":4934.41,"at_8000_kwh":6135.61},"marginal_rates":{"excess_unit_cost_cents":40.04,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali13183sbe18eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI13183SBE18@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-97},{"plan_id":"alinta-ali13213sbe17eme-electricity","cdr_plan_id":"ALI13213SBE17@EME","retailer":"Alinta Energy","retailer_slug":"alinta","retailer_logo_uri":"https://www.alintaenergy.com.au/-/jssmedia/alinta-website/data/media/img/alinta_default_logo.png","plan_name":"SME Standing Offer - Demand Single Rate","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":40.04,"supply_charge_cents_per_day":803.4},"demand_charges":[{"display_name":"Demand Summer (c/kVA/day)","description":"November to March, Mon-Fri","amount_cents_per_kw":8.42,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Non-Summer (c/kW/day)","description":"April to October, Mon-Fri","amount_cents_per_kw":8.42,"start_time":"4pm","end_time":"9pm","days":["MON","TUE","WED","THU","FRI"],"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":3,"annual_cost_estimates":{"at_3000_kwh":4133.61,"at_4000_kwh":4534.01,"at_5000_kwh":4934.41,"at_8000_kwh":6135.61},"marginal_rates":{"excess_unit_cost_cents":40.04,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=alinta-ali13213sbe17eme-electricity&source=ai","last_verified":"2025-10-20","source_doc":"CDR EnergyPlanDetailV3 ALI13213SBE17@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 1 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 2 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"Single Rate Solar FiT","description":"Customer Group 3 (ex GST)","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"Single Rate Solar FiT","description":"Retailer FiT (ex GST)","type":"single","rate_cents_per_kwh":3}],"terms":"This offer is only available to customers with an applicable network tariff. Eligibility criteria apply, for terms and conditions see alintaenergy.com.au/termsandconditions or call 13 39 08.","variation":"Alinta Energy will notify you in advance of any tariff or price variation in accordance with applicable laws.","coolingOffDays":10,"billFrequency":["P1M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","PAPER_BILL","BPAY"],"meterTypes":["Type 4","Type 5"],"additionalFeeInformation":"We reserve the right to and will notify you if we change or impose additional fees or charges in relation to your energy supply. Fees and charges for work undertaken by your Distributor or Metering Provider are outlined at www.alintaenergy.com.au/feesandcharges","fees":[{"type":"DISCONNECTION","amount":"63.71","description":"Disconnection fee. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"Reconnection (Power Off - Re-Energisation Required). Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"RECONNECTION","amount":"142.63","description":"After Business Hours Reconnection. Fee may vary, please see additional fee information.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"Move-out (Final Read). Fee may vary, please see additional fee information.","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-97},{"plan_id":"agl-agl1059359mbe1eme-electricity","cdr_plan_id":"AGL1059359MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":908.15,"peak_cents_per_kwh":34.71,"off_peak_cents_per_kwh":31.84,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":4295.78,"at_4000_kwh":4622.79,"at_5000_kwh":4949.8,"at_8000_kwh":5930.83},"marginal_rates":{"excess_unit_cost_cents":34.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059359mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059359MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":31.84},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":34.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":31.84}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":31.84}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-100.9},{"plan_id":"agl-agl1059373mbe1eme-electricity","cdr_plan_id":"AGL1059373MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":908.15,"peak_cents_per_kwh":34.71,"off_peak_cents_per_kwh":31.84,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":4295.78,"at_4000_kwh":4622.79,"at_5000_kwh":4949.8,"at_8000_kwh":5930.83},"marginal_rates":{"excess_unit_cost_cents":34.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059373mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059373MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":31.84},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":34.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":31.84}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":31.84}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-100.9},{"plan_id":"agl-agl1059316mbe1eme-electricity","cdr_plan_id":"AGL1059316MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":908.15,"peak_cents_per_kwh":34.71,"off_peak_cents_per_kwh":31.84,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":4295.78,"at_4000_kwh":4622.79,"at_5000_kwh":4949.8,"at_8000_kwh":5930.83},"marginal_rates":{"excess_unit_cost_cents":34.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059316mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059316MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":31.84},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":34.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":31.84}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":31.84}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-100.9},{"plan_id":"agl-agl1059338mbe1eme-electricity","cdr_plan_id":"AGL1059338MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Multi Property - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":908.15,"peak_cents_per_kwh":34.71,"off_peak_cents_per_kwh":31.84,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":1,"annual_cost_estimates":{"at_3000_kwh":4295.78,"at_4000_kwh":4622.79,"at_5000_kwh":4949.8,"at_8000_kwh":5930.83},"marginal_rates":{"excess_unit_cost_cents":34.71,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1059338mbe1eme-electricity&source=ai","last_verified":"2026-05-26","source_doc":"CDR EnergyPlanDetailV3 AGL1059338MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":1},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. To be eligible, you must hold gas and/or electricity accounts on AGL�s Business Multi-Property plan for at least two small business supply addresses under the same ABN or ACN; otherwise, AGL may move you to a standard retail contract.For solar feed-in tariff eligibility or further details about terms and conditions, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":31.84},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":34.71},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":31.84}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":31.84}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-100.9},{"plan_id":"agl-agl1041979mbe1eme-electricity","cdr_plan_id":"AGL1041979MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":941.38,"peak_cents_per_kwh":35.98,"off_peak_cents_per_kwh":33.01,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":4453.07,"at_4000_kwh":4792.08,"at_5000_kwh":5131.09,"at_8000_kwh":6148.12},"marginal_rates":{"excess_unit_cost_cents":35.98,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1041979mbe1eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL1041979MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.01},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":35.98},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.01}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.01}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-108.3},{"plan_id":"agl-agl1041985mbe1eme-electricity","cdr_plan_id":"AGL1041985MBE1@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - New to AGL (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":941.38,"peak_cents_per_kwh":35.98,"off_peak_cents_per_kwh":33.01,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":4453.07,"at_4000_kwh":4792.08,"at_5000_kwh":5131.09,"at_8000_kwh":6148.12},"marginal_rates":{"excess_unit_cost_cents":35.98,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl1041985mbe1eme-electricity&source=ai","last_verified":"2026-03-26","source_doc":"CDR EnergyPlanDetailV3 AGL1041985MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGL's generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"incentives":[{"category":"OTHER","displayName":"$300 sign up credit","description":"For new & moving AGL customers who stay with AGL at the same address for 90 days from start of the plan. Credit will appear on next bill after 90 days. Non-transferable. Accounts may be excluded from receiving more than one credit per fuel in 12 months"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.01},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":35.98},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.01}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.01}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-108.3},{"plan_id":"agl-agl907787mbe4eme-electricity","cdr_plan_id":"AGL907787MBE4@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - 3rd Party (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":941.38,"peak_cents_per_kwh":35.98,"off_peak_cents_per_kwh":33.01,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":4453.07,"at_4000_kwh":4792.08,"at_5000_kwh":5131.09,"at_8000_kwh":6148.12},"marginal_rates":{"excess_unit_cost_cents":35.98,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907787mbe4eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 AGL907787MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.01},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":35.98},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.01}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.01}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-108.3},{"plan_id":"agl-agl907784mbe4eme-electricity","cdr_plan_id":"AGL907784MBE4@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver - 3rd Party (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":941.38,"peak_cents_per_kwh":35.98,"off_peak_cents_per_kwh":33.01,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":4453.07,"at_4000_kwh":4792.08,"at_5000_kwh":5131.09,"at_8000_kwh":6148.12},"marginal_rates":{"excess_unit_cost_cents":35.98,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":"Authorised AGL representative"},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907784mbe4eme-electricity&source=ai","last_verified":"2026-01-08","source_doc":"CDR EnergyPlanDetailV3 AGL907784MBE4@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"63.71","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.01},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":35.98},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.01}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.01}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-108.3},{"plan_id":"agl-agl907797mbe3eme-electricity","cdr_plan_id":"AGL907797MBE3@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":941.38,"peak_cents_per_kwh":35.98,"off_peak_cents_per_kwh":33.01,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":4453.07,"at_4000_kwh":4792.08,"at_5000_kwh":5131.09,"at_8000_kwh":6148.12},"marginal_rates":{"excess_unit_cost_cents":35.98,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907797mbe3eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL907797MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.01},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":35.98},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.01}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.01}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-108.3},{"plan_id":"agl-agl907776mbe3eme-electricity","cdr_plan_id":"AGL907776MBE3@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Smart Saver (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":941.38,"peak_cents_per_kwh":35.98,"off_peak_cents_per_kwh":33.01,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":4453.07,"at_4000_kwh":4792.08,"at_5000_kwh":5131.09,"at_8000_kwh":6148.12},"marginal_rates":{"excess_unit_cost_cents":35.98,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl907776mbe3eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL907776MBE3@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":44}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au.","variation":"This plan also includes variable rates, retail fees and charges, which can change at any time with notice to you. If we vary your rates, we will give you at least 5 business days prior notice of the variation. Other charges may be varied with notice to you.","onExpiryDescription":"Your market contract is ongoing. From time to time, AGL reviews its offers and this offer will be reviewed with consideration to AGLâ€™s generally available market offers","coolingOffDays":10,"billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":33.01},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":35.98},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":33.01}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":33.01}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-108.3},{"plan_id":"agl-agl15440sbe33eme-electricity","cdr_plan_id":"AGL15440SBE33@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Standing Offer (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":1107.51,"peak_cents_per_kwh":42.34,"off_peak_cents_per_kwh":38.84,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":5239.11,"at_4000_kwh":5638.01,"at_5000_kwh":6036.91,"at_8000_kwh":7233.61},"marginal_rates":{"excess_unit_cost_cents":42.34,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl15440sbe33eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL15440SBE33@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.84},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":42.34},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.84}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":38.84}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-145},{"plan_id":"agl-agl15441sbe33eme-electricity","cdr_plan_id":"AGL15441SBE33@EME","retailer":"AGL","retailer_slug":"agl","retailer_logo_uri":"https://agl.com.au/content/dam/digital/agl/images/logos/agl/agl-vertical-gradient.svg","plan_name":"Business Standing Offer (No Exit Fee)","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"standing","tariff_type":"time_of_use","contract_term_months":null,"exit_fee_dollars":0,"rates":{"supply_charge_cents_per_day":1107.51,"peak_cents_per_kwh":42.34,"off_peak_cents_per_kwh":38.84,"shoulder_cents_per_kwh":null,"peak_hours":"7am-8:59pm mon, tue, wed, thu, fri","off_peak_hours":"9pm-6:59am mon, tue, wed, thu, fri; 12am-11:59pm sat, sun","shoulder_hours":null},"demand_charges":[{"display_name":"Demand Charge Peak*  c/kVA/day","description":"* Peak Monthly Demand applies from 12pm - 9pm Mon-Fri","amount_cents_per_kw":27.39,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null},{"display_name":"Demand Charge Off-Peak^  c/kVA/day","description":"^ Off peak period applies at all other times","amount_cents_per_kw":0,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"MONTH","charge_period":"MONTH","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":2,"annual_cost_estimates":{"at_3000_kwh":5239.11,"at_4000_kwh":5638.01,"at_5000_kwh":6036.91,"at_8000_kwh":7233.61},"marginal_rates":{"excess_unit_cost_cents":42.34,"formula_note":"ToU plan — marginal rate uses peak rate as conservative estimate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=agl-agl15441sbe33eme-electricity&source=ai","last_verified":"2026-01-01","source_doc":"CDR EnergyPlanDetailV3 AGL15441SBE33@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"RETAILER","displayName":"AGL Retailer Feed-in Tariff (exc GST if any)","description":"AGL Retailer Feed-in Tariff (exc GST if any)","type":"single","rate_cents_per_kwh":2},{"scheme":"PREMIUM","payerType":"GOVERNMENT","displayName":"Solar bonus scheme - Premium FiT","description":"Solar bonus scheme - Premium FiT","type":"single","rate_cents_per_kwh":49}],"terms":"This offer applies to customers with an applicable network tariff. For solar feed-in tariff eligibility, or for further information about the terms and conditions applicable to this energy offer, please contact AGL on 131 245 or visit agl.com.au. AGL's standard retail contract rates are updated periodically on agl.com.au/src. For solar customers, discounts are applied before solar credits are applied.","variation":"We'll vary energy rates no more than once every 6 months. We'll publish variations via a newspaper and our website at least 10 business days prior and give you written notice at least 5 business days prior. Other charges may be varied with notice","onExpiryDescription":"This offer has no contract term","billFrequency":["P3M","P1M"],"paymentOption":["PAPER_BILL","DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional fees and charges may apply. Please see the AGL fee schedules at agl.com.au/fees","fees":[{"type":"CONNECTION","amount":"63.71","description":"May be charged when manually reconnecting or reading your meter when you move into a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"21.23","description":"May be charged when manually disconnecting or reading your meter when you move out of a property or change retailer. Incl GST. Fees may vary.","term":"FIXED"},{"type":"CONNECTION","amount":"5.00","description":"Fee may be charged when remotely reconnecting your meter when you move into a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_MOVE_OUT","amount":"5.00","description":"Fee may be charged when remotely disconnecting your meter when you move out of a property or change retailer. Includes GST. Fees may vary.","term":"FIXED"},{"type":"DISCONNECT_NON_PAY","amount":"63.71","description":"Fee may be charged when manually disconnecting your meter in other circumstances, such as non-payment. Includes GST. Fees may vary.","term":"FIXED"},{"type":"RECONNECTION","amount":"63.71","description":"May be charged when manually reconnecting in other circumstances, such as after disconnection for non-payment. Includes GST. Fees may vary","term":"FIXED"},{"type":"LATE_PAYMENT","amount":"12.00","description":"A late payment fee may be charged when full payment has not been received by the bill due date. This amount is not subject to GST","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0054","description":"The amount is GST inclusive and applies to card payments made at Australia Post outlets.","term":"PERCENT_OF_BILL","rate":"0.0054"},{"type":"OTHER","amount":"3.3","description":"An over the counter payment fee may apply for payments made in-person at a Post Office. Includes GST.","term":"FIXED"},{"type":"PAPER_BILL","amount":"1.75","description":"A paper bill fee may apply for each bill sent by post. Includes GST.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0014","description":"The amount is GST inclusive and applies to payments made by Visa debit cards.","term":"PERCENT_OF_BILL","rate":"0.0014"},{"type":"CC_PROCESSING","amount":"0.0065","description":"The amount is GST inclusive and applies to payments made by Visa credit cards.","term":"PERCENT_OF_BILL","rate":"0.0065"},{"type":"PAYMENT_PROCESSING","amount":"0.0032","description":"The amount is GST inclusive and applies to payments made by Mastercard debit cards.","term":"PERCENT_OF_BILL","rate":"0.0032"},{"type":"CC_PROCESSING","amount":"0.0078","description":"The amount is GST inclusive and applies to payments made by Mastercard credit cards.","term":"PERCENT_OF_BILL","rate":"0.0078"}],"greenPowerCharges":[{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For .88c / kWh inc. GST we ensure energy equal to 20% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":20,"amount":"0.0088"}]},{"scheme":"GREENPOWER","type":"FIXED_PER_UNIT","description":"For 4.4c /kWh inc. GST we ensure energy equal to 100% of your usage will be fed into the grid from Accredited GreenPower generators.","tiers":[{"percentGreen":100,"amount":"0.044"}]}],"touSchedule":[{"season":"","rows":[{"label":"Weekdays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":7,"rateCents":38.84},{"type":"PEAK","startHour":7,"endHour":21,"rateCents":42.34},{"type":"OFF_PEAK","startHour":21,"endHour":24,"rateCents":38.84}]},{"label":"Weekends & public holidays","segments":[{"type":"OFF_PEAK","startHour":0,"endHour":24,"rateCents":38.84}]}]}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-145},{"plan_id":"next-business-nex1044176mbe1eme-electricity","cdr_plan_id":"NEX1044176MBE1@EME","retailer":"Next Business Energy","retailer_slug":"next-business","retailer_logo_uri":"https://nextbusinessenergy.com.au/logo/nbe-logo.png","plan_name":"Next Assured Bus 15% GTD","plan_url":null,"epfs_url":null,"fuel_type":"electricity","customer_type":"business","plan_type":"market","tariff_type":"flat","contract_term_months":null,"exit_fee_dollars":0,"rates":{"usage_rate_cents_per_kwh":36.89,"supply_charge_cents_per_day":1535.98},"demand_charges":[{"display_name":"Summer Demand","description":"Demand Charge  All kVA (�/kVA Daily). Uses the maximum kVA consumption from the meter readings within the period Nov - Mar, Mon - Fri, 16:00 - 21:00.","amount_cents_per_kw":44.51,"start_time":"12am","end_time":"12am","days":null,"min_demand_kw":0,"max_demand_kw":null,"measurement_period":"DAY","charge_period":"DAY","measure_unit":"KWH","season_start_month":null,"season_end_month":null,"season_label":null}],"conditional_discounts":[],"signup_credits":[],"solar_fit_cents_per_kwh":0.1,"annual_cost_estimates":{"at_3000_kwh":6713.03,"at_4000_kwh":7081.93,"at_5000_kwh":7450.83,"at_8000_kwh":8557.53},"marginal_rates":{"excess_unit_cost_cents":36.89,"formula_note":"Total = BaseCost + (UserUsage - BenchmarkUsage) * ExcessRate"},"green_energy":false,"green_percentage":null,"rates_fixed_until":null,"eligibility":{"requires_smart_meter":false,"compatible_meter_types":["type_4","type_4a","type_6"],"compatible_network_tariff_codes":"all","incompatible_network_tariff_codes":[],"availability_note":null},"billhero_referral_url":"https://billhero.com.au/switch?plan_id=next-business-nex1044176mbe1eme-electricity&source=ai","last_verified":"2026-03-31","source_doc":"CDR EnergyPlanDetailV3 NEX1044176MBE1@EME","distributors":["SA Power Networks"],"contract_details":{"solarFeedInTariff":[{"scheme":"OTHER","payerType":"GOVERNMENT","displayName":"FiT Premium: Single Rate Feed In Tariff","description":"FiT Premium | All kWh/day","type":"single","rate_cents_per_kwh":44},{"scheme":"OTHER","payerType":"RETAILER","displayName":"RFIT: Single Rate Feed In Tariff","description":"RFIT | All kWh/day","type":"single","rate_cents_per_kwh":0.1},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"PEAK","rate_cents_per_kwh":7,"hours":"5pm-7:59pm","startHour":17,"endHour":20}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"SHOULDER","rate_cents_per_kwh":0,"hours":"10am-2:59pm","startHour":10,"endHour":15}]},{"scheme":"OTHER","payerType":"RETAILER","displayName":"SA Power Networks | Two Way: Time of Use Feed In Tariff","description":"SA Power Networks | Two Way | All kWh/day","type":"time_varying","periods":[{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":0,"endHour":10},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":15,"endHour":17},{"type":"OFF_PEAK","rate_cents_per_kwh":2,"hours":"12am-9:59am, 3pm-4:59pm, 8pm-11:59pm","startHour":20,"endHour":24}]}],"terms":"The sale of electricity to the Customer is subject to Next Business Energy's Market Terms and Conditions, which are available on its website at www.nextbusinessenergy.com.au.","variation":"Next Business Energy may vary the rates at any time in accordance with our terms and conditions.","onExpiryDescription":"This contract continues for as long as you choose to remain on the plan.","coolingOffDays":10,"billFrequency":["P1M","P3M"],"paymentOption":["DIRECT_DEBIT","CREDIT_CARD","BPAY"],"meterTypes":["Type 4","Type 4a","Type 5","Type 6"],"additionalFeeInformation":"Additional service order and ancillary service fees may apply. For more information, please visit our  website at www.nextbusinessenergy.com.au.","fees":[{"type":"CC_PROCESSING","amount":"0.0195","description":"1.95% AMEX credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0195"},{"type":"RECONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"DISCONNECTION","amount":"1269.917","description":"This charge may vary, to confirm this charge and all other charges please refer to our website or contact us for details.","term":"FIXED"},{"type":"PAYMENT_PROCESSING","amount":"0.0077","description":"0.77% Visa & Mastercard credit card payment processing fee","term":"PERCENT_OF_BILL","rate":"0.0077"},{"type":"OTHER","amount":"77.00","description":"COMMS3 Meter Charge","term":"FIXED"},{"type":"OTHER","amount":"77.00","description":"COMMS4 Meter Charge","term":"FIXED"}]},"tariff_codes":null,"postcodes":null,"postcode_count":null,"benchmark_discount_percent":-207.8}]}