ENGIE vs Origin Energy
Origin Energy is cheaper - by about $50/year
Origin Energy’s cheapest residential electricity plan, Origin Affinity Variable - Electricity Monster - Oct'26 (Time of Use with Dedicated Circuit), costs an estimated $1,230/year at 4,000 kWh, 17% below the VDO. ENGIE’s cheapest plan, VIC ENGIE Standing elec, costs $1,280/year, 14% below the VDO. That is a difference of $50/year - switching from ENGIE to Origin Energycould save you about that much, though your actual cost depends on your usage, tariff type and eligibility for any plan’s conditional discounts.
ENGIE - cheapest plans
Origin Energy - cheapest plans
| Plan | Retailer | Annual cost ▲at 4,000 kWh/yr | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Peak | Off-peak | Shoulder | ||||||||
Origin Affinity Variable - Electricity Monster - Oct'26 (Time of Use with Dedicated Circuit) Time of use | Origin Energy | $1,230 | ||||||||
Origin Affinity Variable - Electricity Monster - Oct'26 (Time of Use) Time of use | Origin Energy | $1,230 | ||||||||
Origin Affinity Variable - My Connect - Oct'26 (Time of Use with Dedicated Circuit) Time of use | Origin Energy | $1,230 |
Head-to-head: cheapest plan from each retailer
| Spec | ENGIE | Origin Energy |
|---|---|---|
| Plan | VIC ENGIE Standing elec | Origin Affinity Variable - Electricity Monster - Oct'26 (Time of Use with Dedicated Circuit) |
| Supply charge | 110.12c/day | 102.42c/day |
| Usage rate | 34.82c/kWh (peak) | 32.39c/kWh (peak) |
| Exit fee | $0.00 | $0.00 |
| Contract term | No lock-in | 12 months |
| Green energy | - | - |
| Solar feed-in tariff | 1.0c/kWh | 1.0c/kWh |
How do I switch from ENGIE to Origin Energy?
Choose a plan above and click Switch. Bill Hero lodges the transfer with your new retailer - there is no interruption to your electricity supply, and most switches complete within 2 business days. ENGIE’s cheapest plan has no lock-in contract and an exit fee of $0.00; Origin Energy’s has a 12-month contract term and an exit fee of $0.00. Check your current plan’s exit fee before switching, if any applies.
